Loading...
HomeMy WebLinkAboutStarker_MY1_Credit Release Schedule_signedProject Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non-Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 9,656.73 9,656.73 Scheduled Releases Warm Water Cool Water Cold Water Scheduled Releases Riparian Riverine Riparian Non-Riverine Non-Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment)1, 2 15%1,448.51 15%15%1/30/2022 1/20/2022 2 (Year 0/As-Built)3 15%1,448.51 15%15%4/30/2023 8/17/2023 3 (Year 1 Monitoring)10%965.67 10%10%1/30/2024 4 (Year 2 Monitoring)10%965.67 10%15%1/30/2025 5 (Year 3 Monitoring)10%965.67 15%20%1/30/2026 6 (Year 4 Monitoring)5%482.84 5%10%1/30/2027 7 (Year 5 Monitoring)10%965.67 15%15%1/30/2028 8 (Year 6 Monitoring)5%482.84 5%NA NA 1/30/2029 9 (Year 7 Monitoring)10%965.67 10%NA NA 3/30/2030 Stream Bankfull Standard4 10%965.67 NA NA NA NA NA NA Varies4 Total Credits Release to Date 1,448.51 Date Wilmington District Mitigation Bank Credit Release Schedule 4 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met. 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan. Contingencies (if any): None Signature of Wilmington District Official Approving Credit Release Starker (WLS Catawba 01 UMB) Water & Land Solutions, LLC SAW-2020-01540 2020-1357 Potential Credits from Mitigation Plan Forested Wetland Credits Total Potential Credits Projected Release Date Actual Release Date Potential Credits from As-Built Survey Stream Credits Credit Classification Non-Forested Wetland CreditsForested Wetland CreditsStream Credits Current and Future Credit Releases Credit Release Milestone Catawba 03050101 2020 12/14/2023 County: 8-Digit HUC: Year Project Instituted: Date Prepared: 3/20/2024 3/20/2024