[External] Notice of Credit Release and As-Built Approval/ WLS Catawba 01 UMB - Starker/ SAW-2020-01540/ Catawba County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon Catherine, This correspondence is in reference to the monitoring report and credit release request submitted for the WLS Catawba 01 Umbrella Mitigation Bank, Starker Mitigation Site, Action ID SAW-2020-01540. The purpose of this letter is to transmit comments provided by the NC Interagency Review Team (NCIRT) during the review of the monitoring report and to confirm the annual credit release. The review of the annual monitoring report followed procedures outlined in Section 332.8(o)(9) of the Mitigation Rule. The comments listed below were provided by the NCIRT during this process. While it is not necessary to provide a response to specific comments at this time, please be sure to address the issues raised in future monitoring report submittals. Andrew Friedman-Herring / Maria Polizzi, NCDWR 1. All of the vegetation data looks very good and is organized in a very easy to read way, which is appreciated. 2. The only cross section that appears to have adjusted significantly is XS-11 deepening considerably. However, the photos of XS-11 and XS-12 immediately downstream appear stable. This is an area to watch closely in future years. Otherwise, geomorphology appears stable and on track. 3. On figure 1a of MY1 and figure 9 of the Final MP, S101, 102, and 103 are shown as P2 restoration, but section 6.2.1 of the Final MP described the proposed work as P1 with small sections of P2. In Comment 8 from DWR on the Final MP, a concern was voiced about losing flow along S101, S102, and S103 from raising the channel bed. Can you clarify what restoration approach was constructed on these reaches and update figure 1a accordingly if needed? 4. The flow gauge on S103 is very concerning, as there are only 3 days of consecutive flow. It appears that no flow has been recorded since 8/27/23, despite this channel being assessed as intermittent. Be prepared to address this issue with an adaptive management plan in Year 2 if conditions do not significantly improve. Steve Kichefski, USACE 1. Thank you for a thorough project status discussion, SPA photo and drone photos in the MY1 report. 2. Make sure invasives, particularly Kudzu, receive persistent treatment in order to prevent problems. Is the Kudzu present in treatable areas outside the CE that may benefit the project long-term by including in treatments? 3. XS14 problem noted although visually it does not stand out on the cross-section graph. XS-11 shows pool deepening. What is happing in this location? 4. Zooming in or possibly vertical exaggeration may help long term review of cross section graphs. As currently presented, it will be difficult to assess in later monitoring years with the additional lines. 5. Low flow is noted on S103 and concerning. Only 1 stream flow response recorded from rain events after July. Was this believed to be from low water table during that time of year? Continue to ensure gauge is functioning properly and update IRT in MY2 as recommended. 6. Multiple bankfull events noted. Were physical bankfull flow indicators found in the field and documented. Photos with dates are helpful to support crest gauge data and the descriptions could be added to Table 7a/7b. Example…during site visit on 12/6/2023, bent vegetation, wracking and sediment on vegetation were documented near CG-1 (see photo). 7. The inclusion of previous IRT comments with responses in the report is appreciated. Please continue to build this record of correspondence in future report submittals. 8. CCPV legend – As random veg plots begin this monitoring year make sure to display (along with success status) on the CCPV. Keep in mind, it is helpful to see previous years’ random veg plot locations. Based on our review of the monitoring report and the results of the NCIRT review, we confirm that you have satisfied requirements included in the approved banking instrument and mitigation plan for this site. Accordingly, with this correspondence we confirm the release of credits as shown on the attached credit release schedule. The district leger on the Regulatory In-lieu Fee and Bank Information Tracking System has been updated to reflect this transaction. Thank you for your interest in restoring and protecting waters of the United States. Please note that this electronic copy is an official Department of Army notification regarding this transaction. If you have questions regarding this email, please contact me by email at Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> or telephone (828) 933-8032. Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Mitigation Branch (828)-271-7980 Ext. 4234 (828)-933-8032 cell Enclosure cc (by email): NCIRT Distribution List From: Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil> Sent: Friday, January 5, 2024 9:04 AM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Hamstead, Byron <byron_hamstead@fws.go v>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Merritt, Katie <katie.merritt@deq.nc.gov>; Friedman-Herring, Andrew <andrew.friedmanherring@deq.nc.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org >; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Dave McHenry <david.mchenry@ncwildlife.org> Cc: Catherine Roland <catherine@waterlandsolutions.com>; kyle@waterlandsolutions.com Subject: Notice of Year 1 Monitoring Report Review/ WLS Catawba 01 UMB - Starker/ SAW-2020-01540/ Catawba County Good morning IRT, The below referenced bank Sponsor has submitted an Annual Monitoring Report for NCIRT review and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository. This review will follow the process outlined for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date listed in this email notification. Please provide any comments by 5 PM on the comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this credit release. 15-Day Comment Start Date: January 9, 2024 15-Day Comment Deadline: January 24, 2024 45-Day Credit Release Approval Deadline: February 23, 2024 NOTE: Deadlines will be extended if an on-site meeting is requested, and comments will be due 15-days following the site visit. Project Information: Sponsor: Water & Land Solutions, LLC Bank Name: WLS Catawba 01 Umbrella Mitigation Bank Site Name: Starker Mitigation Site USACE ID: SAW-2020-01540 River Basin: Catawba HUC: 03050101 County: Catawba Sponsor POC: Catherine Roland, catherine@waterlandsolutions.com <mailto:catherine@waterlandsolutions.com> USACE PM: Steve Kichefski, Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> USACE Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> Credit Release Activities: Year 1 Annual Monitoring Credit Release Requested: 10% of the total warm water stream credits = 965.67 RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:174265996168:::RP,278:P278_BANK_ID:5790 <https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fribits.ops. usace.army.mil%2Fords%2Ff%3Fp%3D107%3A278%3A174265996168%3A%3A%3ARP%2C278%3AP278_BANK_ID%3A5790&data=05%7C02%7Cmaria.polizzi%40deq.nc.gov%7C9bbbc1ff5ea546be228c08dc4920ac3d%7C7a7681dcb9d0449a85c3ecc2 6cd7ed19%7C0%7C0%7C638465652178248742%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=qdky8PeArRoLWE3oKD9cBA7xKe6Mqu%2FgwijvSh0ViLA%3D&re served=0> Please note that you must be logged in to access documents in the cyber repository. When submitting comments please indicate if you are requesting a site visit. Please reach out if you have any questions. Thank you, Erin Erin B. Davis Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 930-1887 work cell �ᆈ猻쫴揩�롄텦䷱༿⧄墩뇧즙㉾㥁攝핻鮶榎쇰恧ݼ�©ﴜ黱秒䢯阦�⋖ᵁ卡剮䲸馩ꦪ隥䞎⭅幋苓刏図垜꼃凴ꏜ猎㮍冻硫ω⣚억鲖⋂ꄡထ䐄ᅀ䑄ᄁА䁄ᄑ䐀ńထ?衈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈⼂ნꔾ㣢峚䃢砀ᙎ廚묍Ꮑ緦ఱ╠峇g癮줎鋳時ᆙА䁄ᄑ䐀ńထ䐄ᅀ䑄ᄁА䁄ᄑ䐀ńထ䵍搥솱甓䜾趵̙焮ᧀ渻鱔丁筹㩱鹁힢ܷ嫓�썗ꆠߢ恇잵Ꝯ譳瓹➈ 퐎滧ᴀ叱쵝㗲겴⽠㤧敖듞屗箤宲㐞Ǻ灧↛䦊捸㜘չ秚鎠꧋赶탚㦪榪瀶⬊労雺凧쀭远戇忐㷨푦딖殸⟾厴请䷍滮僭煆톀耝簒핼쵍곏튳䩕忲瞣줝㧩赥棎ꕄ鍉ퟀ字ᾪ礎럤㶟蒂ꖫ蚖썗琳螽ᤎ܇죎ᄕ㱲糆ଫ熋嫫侫ꂷ㠗誔骅䒔偒䑄ᄁА䁄ᄑ䐀ńထ䐄ᅀ䑄'衈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈궷噬櫹酢벀塦娎鹱Ⅺ䑄ᄁА䁄ᄑ夀זּ䕭凒㌍��爠ᵈ쉋��賆႗㢹휜捂玻᭚馊 㔚舜�ꦷ㢹哝�ᬳ讑唍ि졂暢Ὢ笛겮䬻�ᢹዘ쩺뇉㑱㪷侁䌻⎙ⵈ㬘䩮憒癐倫䤞��꠩乸唓v帀쥨Ή聦섁㡱닛㯩≅㜥콉톮᪶雚愰ꢭ㒔vòꭘ뻞嚤췔游⒑纯Ᶎ挗ᤸ秆磡✮血ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"آ셑灓灹폒嚏뗻⭈놪묥ꦇꔩ歨鿋놑猸❶薨╶뀸訌冣䰣鲝滧ꗞ뮹苻ᡘ财뾾獿灹쏉캃ㅆ톃遍膌곋ˉ駡ꆠ枊鄹퍂㨣艁嵒盔愸㏏势�쉤⒩䘍ﷻ킝됼뀴褍츘⟹얭⩁⎿骬색绬픎㞖阨泶ᡵ㍂东᫈炚粨ᦑ锔ꀅ몿ܖ ॆ焇�ꔽ坎턵⯋적뇕�䰚댥揑껬摛汒䣈䑤쭜蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈タ衈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢뜀鱴瘗薭䎓猀촞㵭㇒섹䠋梬逼ԅ琔鳂㊗庫넺닙⯕躠䕄⊀"袈∂ࠠ肈∢蠀ඈ蟽ꒄ펽꒾⋌ὣ⺧㥩㧛蔛➗챔ꈎ閕嘇쬈왢컙灤紋ׅ㶼Ճ⸝ᢣ㎜䦾耤猆嫠ᕾꦭ갵㲈㳩⍈埑ꑪ�湛딬曅햺䍒䒫慲袺�찃�⪵ࠊ肈РҜ뱔쌣뭼팹伄苜尲焆⏏踄ꦥ蝍뉁쯡嘼坊�谣떗⚆ꄽᣎ픹族뮦鿜ꁴበݰ訧켮풹괹 獱撤᧣⯬짞敮丌嚸∂ಌ㌂鶨湼則ꓪផ갈탘䧃铂ힱ�ᙲ耬㳬�敹幇꿮喽勉仔嬺꒓汧痠磠产蛦ڌꎵ莩䜺릀䅒ᘑᄚ䑄ᄁА鵅둦筍Ⴈ콃␙ϲ朠떫鴒᠈ꨨᰯⴋ醮㇕�ྃꅍ㒺�⹙�ԛ딮ꮦ찉∢ᇀ䑄ᄁА䁄ᄑ䐀ل멅�截ວ擒겑�鰌坥㯱ꪋ蓣렸贱縇횰ꖅꯠ꽹얹Ò釓蚜搸歺塡뵻蘝欗कƧ덹懷뮏ᣜ蛘枷쒖鯖ꚋ䕥ꗖ鳱隴赠쏼�⍛�厮샻礲뼎䘹焮̱햜�뾅诠궛㢷嫰⠛백ꦻ螤ᱤ独뫑⋐實낤䤓ڐ夶琵峑滸屩껣요蛦⓲貽⁰낃 쥫篙獱⨃뺙䛚庯複傕폔큊㣦䄒茀觏덶焪㦨⋚ܮ血ʈ•蠈⊀"袈∂ࠠ肈∢蠀ྈ폿䣥肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀"袈∂ࠠ肈∢蠀ʈ•蠈⊀Ȣ䰒㳷Ჸኗ돣ڞ㷧捁灘焇쮾︢ꈞ鏕᷏ᘩ캲毢௩翞剟嵄菉ﰡᖼ芏丵㾪ᠤ涥秦梤齨豌髃듼㦍雛㯭ᔜ뤸ᄖ�궆ፙ挥Ⓦ㶸⇃ಣ眧᭲ዡ㊘佸䶇盚㭏ꕉ蹤ဒ듦귥۔᥉鋛㌖雊⋠⒏울鬻䁫�岼뎡פּ끽ᦑ獱ꮝ䥖�瓶흂嶓瑚蜃栟堗깕ഉꏎ蜧纸荋벻袠ச욉炢뀳냦 �슔䤺⤞䳄豮겹ꐥ듴㍬꧋㡮哋�ⅇ썩⢛椙봃젭鳥䜐앦⥄펍끁袠ઊ蠈⊀"袈∂ਠ軶굨⨶衺挣筥 䙈Ჷഗ蟺艚䦰铃욘돚禎엒ぞꪘ沍ગ쎧㜾牆鏇䤣攧씻႔咵�쟥ഠ㯟ݩ官浱㷆극ᝧ嶿ೠ㛈൨௪猣騐䑴偐䑄ᄁА䁄ᄑ䐀ńထ바겟絉걖ᎁ鞇銁չ㙪딵鉕ꑉ✲ꝇ쬜珆ﶜ�㊿눆ᰉ跓쟎띭埤⡸瞂쐹Ꭷ崲꠳㉬撉柮﹃䘙㮫䋼螛鮩ឌ荔㷏湒ឣ薚饞⥐�謈蛞䮊₂�큰͈㈾ꊠ跫峄낛꿟纭᷸捻硠︎噳ᜯ⑊Ƭ髜쿁뉾碳ⴚ�ᶗ瀸⟛窨봫벖㥢넪 㢧䕄ᄑ䐀ńထ䐄ᅀ䑄ᄁА䁄ᄑ!衈⊀"튋骚륊ᐛ⹍蹳 4. Zooming in or possibly vertical exaggeration may help long term review of cross section graphs. As currently presented, it will be difficult to assess in later monitoring years with the additional lines. 5. Low flow is noted on S103 and concerning. Only 1 stream flow response recorded from rain events after July. Was this believed to be from low water table during that time of year? Continue to ensure gauge is functioning properly and update IRT in MY2 as recommended. 6. Multiple bankfull events noted. Were physical bankfull flow indicators found in the field and documented. Photos with dates are helpful to support crest gauge data and the descriptions could be added to Table 7a/7b. Example…during site visit on 12/6/2023, bent vegetation, wracking and sediment on vegetation were documented near CG-1 (see photo). 7. The inclusion of previous IRT comments with responses in the report is appreciated. Please continue to build this record of correspondence in future report submittals. 8. CCPV legend – As random veg plots begin this monitoring year make sure to display (along with success status) on the CCPV. Keep in mind, it is helpful to see previous years’ random veg plot locations. Based on our review of the monitoring report and the results of the NCIRT review, we confirm that you have satisfied requirements included in the approved banking instrument and mitigation plan for this site. Accordingly, with this correspondence we confirm the release of credits as shown on the attached credit release schedule. The district leger on the Regulatory In-lieu Fee and Bank Information Tracking System has been updated to reflect this transaction. Thank you for your interest in restoring and protecting waters of the United States. Please note that this electronic copy is an official Department of Army notification regarding this transaction. If you have questions regarding this email, please contact me by email at Steven.L.Kichefski@usace.army.mil or telephone (828) 933-8032. Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Mitigation Branch (828)-271-7980 Ext. 4234 (828)-933-8032 cell Enclosure cc (by email): NCIRT Distribution List From: Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil> Sent: Friday, January 5, 2024 9:04 AM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Hamstead, Byron <byron_hamstead@fws.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Merritt, Katie <katie.merritt@deq.nc.gov>; Friedman-Herring, Andrew <andrew.friedmanherring@deq.nc.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Dave McHenry <david.mchenry@ncwildlife.org> Cc: Catherine Roland <catherine@waterlandsolutions.com>; kyle@waterlandsolutions.com Subject: Notice of Year 1 Monitoring Report Review/ WLS Catawba 01 UMB - Starker/ SAW-2020-01540/ Catawba County Good morning IRT, 2 The below referenced bank Sponsor has submitted an Annual Monitoring Report for NCIRT review and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository. This review will follow the process outlined for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date listed in this email notification. Please provide any comments by 5 PM on the comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this credit release. 15-Day Comment Start Date: January 9, 2024 15-Day Comment Deadline: January 24, 2024 45-Day Credit Release Approval Deadline: February 23, 2024 NOTE: Deadlines will be extended if an on-site meeting is requested, and comments will be due 15-days following the site visit. Project Information: Sponsor: Water & Land Solutions, LLC Bank Name: WLS Catawba 01 Umbrella Mitigation Bank Site Name: Starker Mitigation Site USACE ID: SAW-2020-01540 River Basin: Catawba HUC: 03050101 County: Catawba Sponsor POC: Catherine Roland, catherine@waterlandsolutions.com USACE PM: Steve Kichefski, Steven.L.Kichefski@usace.army.mil USACE Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil Credit Release Activities: Year 1 Annual Monitoring Credit Release Requested: 10% of the total warm water stream credits = 965.67 RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:174265996168:::RP,278:P278_BANK_ID:5790 Please note that you must be logged in to access documents in the cyber repository. When submitting comments please indicate if you are requesting a site visit. Please reach out if you have any questions. Thank you, Erin Erin B. Davis Mitigation Specialist, Regulatory Division U.S. Army Corps of Engineers, Wilmington District (919) 930-1887 work cell 3