Loading...
HomeMy WebLinkAboutNCG030326 DMR SW (9)Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 3/23/15 :ERTIFICATE OF COVERAGE N0. NORM V-6 ACILITY NAME Hirschfeld Industries Bridge, LLC :OUNTY Nash PERSON COLLECTING SAMPLES Roger Breeden ABORATORY Microbac Lab Cert. #.11 :omments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2015 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly1March month DISCHARGING TO CLASS ❑ORW ❑HQW []Trout Ea RECEIVED ❑Zero -flow ❑Water Supply APR 0 8 2015 ®Other 4 CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION ® No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hourrainfall amount, Inches' Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics lenchmorks =__> - - 100 mg/L or 50 mg/L° 6.0-9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 01 3/3/15 .5 --------- --------- --------- -------- 0.12 ------ ------ 02 3/3/15 .5 ---------- --------- --------- -------- 0.13 -------- ------ Monthlv samoline (instead of semi-annual) must beein with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture -lectronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA ffluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor lanufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray ube manufacture use the definition found in 40 CFR 469.31). ermit Date: 11/1/2012-10/31/2017 SWU-24S, last revised 10/2S/2012 Page 1 of 3 ac;lities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring iay waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General -lermit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Roger Breeden Name (Print name) Plant Manager Title (Print title) C't IIs (Signature) (Date) lote: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical ormat. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection mit, reporting limit, etc. in mg/L. late: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. 'art B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT -HEM) Total Suspended Solids pH Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L' 6.0 — 9.0 SU ootnotes from Part A also apply to this Part B See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. ermit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 lot If you report a sample value In excess of the benchmark, you must implement Tier 1, rer2, or Tier 3 responses. See General Permit text. OR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES INA ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO .EGIONAL OFFICE CONTACT NAME: 4all an oriainal and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period h the case of "No Dischame" reports) to: livision of Water Quality AM: DWQ Central Files 617 Mail Service Center .aleigh, North Carolina 27699-1617 OU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ssure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or hose persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I m aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ilgnature of Permittee) ermit Date: 11/1/2012-10/31/2017 Q - `,Is (Date) SWU-245, last revised 10/2512012 Page 3 of 3