Loading...
HomeMy WebLinkAbout20240456 Ver 1_ePCN Application_20240320i DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) October 2, 2023 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity? Yes No BIMS # Assigned Version# * 20240456 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Mooresville Regional Office - (704) 663-1699 Information for Initial Review la. Name of project: M-071 Kannapolis - Concord High -Pressure Expansion Project 1a. Who is the Primary Contact?* Andrew Moore 1b. Primary Contact Email: * andrew.moore@dominionenergy.com Date Submitted 3/20/2024 Nearest Body of Water Irish Buffalo Creek Basin Yadkin-PeeDee Water Classification WS-III; CA Site Coordinates Latitude: 35.516502 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Cabarrus Rowan Is this a NCDMS Project Yes No Longitude: -80.670233 What amount is owed?* $240.00 $323.00 Select Project Reviewer* Andrew Pitner:andrew.pitner 1c. Primary Contact Phone:* (704)718-4114 $570.00 $767.00 Q `I Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 12 - Utility Lines NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Dominion Energy North Carolina 2b. Deed book and page no.: 2c. Contact Person: 2d. Address Street Address 800 Gaston Road Address Line 2 Building A city Gastonia Postal / Zip Code 28056 2e. Telephone Number: (704)718-4114 2g. Email Address:" andrew.moore@dominionenergy.com 4. Agent/Consultant (if applicable) 4a. Name: Joey Lawler/Rebeckah Sims 4b. Business Name: S&ME, Inc. 4c.Address Street Address 2016 Ayrsley Town Boulevard Address Line 2 Suite 2-A city Charlotte Postal / Zip Code 28273 4d. Telephone Number: (704)523-4726 4f. Email Address: jlawler@smeinc.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Enochville, Landis, China Grove, Kannapolis, Concord 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 city Postal / Zip Code 3. Surface Waters 3a. Name of the nearest body of water to proposed project: " Irish Buffalo Creek 3b. Water Resources Classification of nearest receiving water: WS-III; CA 3c. What river basin(s) is your project located in?* Yadkin-PeeDee State / Province / Region North Carolina Country USA 2f. Fax Number: State / Province / Region North Carolina Country USA 4e. Fax Number: 2b. Property size: State / Province / Region Country 3d. Please provide the 12-digit HUC in which the project is located. 030401050104,030401050101,030401050202,030401050203,030401050201,030401050303 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: " Please see the accompanying PCN cover letter package. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 6.473 4g. List the total estimated linear feet of all existing streams on the property: 6452 4h. Explain the purpose of the proposed project:" Please see the accompanying PCN cover letter package. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: " Please see the accompanying PCN cover letter package. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas? Yes No Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Joey Lawler, Rebeckah Sims, Kylie Wallace Agency/Consultant Company: S&ME, Inc. Other: 6. Future Project Plans 6a. Is this a phased project?" Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No, no other permits will be needed to authorize any project -related work other than the permits being applied for in this pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries O Buffers Open Waters Pond Construction 2. Wetland Impacts Q 2a1 Reason (?) 2b. Impact type (?) 2c. Type of W." 2d. W. name 2e. Forested" 2f. Type of Jurisdicition (?) 2g. Impact area W5 Sidecasting of material T Headwater Forest W5 Yes —_—] Both 0.042 (acres) WS Conversion due to P Headwater Forest W5 Yes Both 0.037 clearing (acres) W11 Conversion due to P mland Hardwood Forest ff W11 Yes Both 0.004 clearing (acres) W19 Sidecasting of material T Unknown W19 No Both 0.004 (acres) W22 Sidecasting of material T Headwater Forest W22 Yes --] Both 0.630 (acres) W22 Conversion due to P Headwater Forest W22 Yes Both 0.040 clearing (acres) W25 Conversion due to P mland Hardwood Forest ff W25 Yes Both 0.002 clearing (acres) W26 Sidecasting of material T Unknown W26 No Both 0.005 (acres) 2g. Total Temporary Wetland Impact 0.681 2g. Total Wetland Impact 0.764 21. Comments: 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.083 F 3a. Reason for impact (?) 3b.lmpact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* 3f. Type of 3g. S. width 3h. Impact Jurisdiction * length S1 Sidecasting of material Temporary Excavation SS Perennial Both 15 52 Average (reel) (linear feet) g2 Sidecasting of material Temporary Excavation S7 Perennial Both 56 Averege (feet) (linear feet) S3 Sidecasting of material Temporary Excavation S9 Perennial Both 8 165 Average (feet) (linear feet) S4 Sidecasting of material Temporary Excavation S10 Intermittent Both 31 Averege (feet) (linear feet) S5 Sidecasting of material Temporary Excavation S12 Perennial Both 15 54 Average (feet) (linear feet) S6 Sidecasting of material Temporary Excavation S17 Intermittent Both 38 Averege (feet) (linear feet) g7 Sidecasting of material Temporary Excavation S18 Perennial Both 52 51 Averege (feet) (linear feet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 0 3i. Total stream and ditch impacts: 447 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 447 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Please see the accompanying PCN cover letter package. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Please see the accompanying PCN cover letter package. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Because the project will not result in permanent stream impacts and affected streams will be restored upon completion of the work, compensatory stream mitigation should not be required. Although the project will not result in a loss of Waters of the U.S., the project will result in conversion of 0.083 acre of forested wetlands to herbaceous wetlands. Because the conversion impact will not exceed 0.10 acre, mitigation is not required. rO V F. Stormwater Management and Diffuse Flow Plan (required by DWR) O 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: This project is not located in an area subject to the NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. This project entails the installation of a utility line within an area that is primarily developed/developing. It is not anticipated that this project will result in additional development at this time. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5d. Is another Federal agency involved?* Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC and NCNHP databases 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NCSHPO HPOWEB 2.0 GIS database 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: This project entails the installation of a utility line that may cross several FEMA-designated 100-year floodplains. Because the project will result in temporary impacts within floodplains and the disturbances will be restored to pre -disturbance conditions, it is unlikely that base flood elevations will be impacted by the project. 8c. What source(s) did you use to make the floodplain determination?" FEMA Flood Map Service Center Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document 2024.0319M-071 PCN.pdf 72.41MB File must be PDF or KMZ Comments Please see the accompanying PCN cover letter package. Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Rebeckah Sims Signature Date 3/20/2024 �"J