HomeMy WebLinkAboutNC0041386_Compliance Inspection Report_20240318ROY COOPER
Ca errtor
ELIZABETH S. BISER
Secretary
RICHARD E. PCIl , JR.
Director
Robert Peele
NC Department of Commerce
PO Box 549
Wanchese, NC 27981-0549
� 1.a SfATF q,
� awM ✓�`
NORTH CAROLINA
Environmental Quality
March 18, 2024
SUBJECT: Compliance Inspection Report
Wanchese Marine Industrial Park WWTP
NPDES WW Permit No. NCO041386
Dare County
Dear Permittel
The North Carolina Division of Water Resources conducted an inspection of the Wanchese Marine
Industrial Park WWTP on 3/14/2024. This inspection was conducted to verify that the facility is
operating in compliance with the conditions and limitations specified in NPDES WW Permit No.
NC0041386. The findings and comments noted during this inspection are provided in the enclosed copy
of the inspection report entitled "Compliance Inspection Report".
If you should have any questions, please do not hesitate to contact Robbie Bullock with the Water
Quality Regional Operations Section in the Washington Regional Office at 252-946-6481 or via email at
robert.e.bullock@deq.nc.gov.
ATTACHMENTS
Cc: Laserfiche
Sincerely,
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Washington Regional Office
Division of Water Resources, NCDEQ
mlora„D �� North Carocna Department afElrvlrammental Qaallty I DWAon ofwaterP sources
Washington VNg mlOFt3ce 1943Washinglon3gvarc Mall I Washington, North Carolina 27M
252.9464481
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO041386 111 121 24/03/14 I17 18 I C I 19 Ls_] 20E
211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I n,J I I I 71 I 74 79 I I I I I I I80
701� I 711 L
LJ L
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
11:00AM 24/03/14
20/07/01
Wanchese Marine Industrial Park WWTP
615 Harbor Rd
Exit Time/Date
Permit Expiration Date
Wanchese NC 27981
12:15PM 24/03/14
22/12/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Michelle Darie Pharr/ORC/252-305-2744/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Robert Peele,PO Box 549 Wanchese NC 279810549H252-473-5867/2524736139
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar 0 Records/Reports
Self -Monitoring Progran 0 Facility Site Review
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Robert B Tankard DWR/WARD WQ/252-946-6481 Ext.233/ 3/18/2024
Robert E Bullock DWR/WARO WQ/252-948-3843/
//
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Plow T"" NC DEQ DWR/WQRos 252-948-3921 3/18/2024
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO041386 I11 12I 24/03/14 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
The facility started receiving influent flow around the middle of February 2024.
The current permit was set to expire on December 31, 2022. A renewal application has been
submitted and the existing permit will remain effective until a new permit is issued.
On the day of inspection a bypass valve around the UV disinfection system was open which allowed
wastewater to potentially be discharged without disinfection. The bypass valve was removed on
3/17/2024.
The effluent flow meter had not been calibrated within the past year. The ORC stated that a
calibration was scheduled for the end of March 2024.
NPDES Permit Standard Conditions Part II. Section D Monitoring and Records, 3 Flow Measurements
- Devices selected shall be capable of measuring flows with a maximum deviation of less than 10%
from the true discharge rates throughout the range of expected discharge volumes. Flow
measurement devices shall be accurately calibrated at a minimum of once per year and maintained to
ensure that the accuracy of the measurements is consistent with the accepted capability of that type
of device.
Page#
Permit: NCO041386
Inspection Date: 03/14/2024
Owner -Facility: Wanchese Marine Industrial Park WWTP
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Yes No NA NE
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
El
El
El
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
Comment: Michelle Pharr is the ORC with David Pharr and Jonathan Pharr as backup ORC's.
Discharge Monitoring Reports or sample results were not available for review since the
facility started operation in the middle of February 2024.
Permit
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Yes No NA NE
■ ❑ ❑ ❑
Page# 3
Permit: NCO041386 Owner -Facility:
Inspection Date: 03/14/2024 Inspection Type:
Wanchese Marine Industrial Park WWTP
Compliance Evaluation
Permit
Yes
No
NA
NE
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The current permit was set to expire on December 31, 2022. A renewal application has
been submitted and the existing permit will remain effective until a new permit is issued.
Bar Screens
Yes
No
NA
NE
Type of bar screen
a.Manual
❑
b.Mechanical
❑
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment:
Aeration Basins
Yes
No
NA
NE
Mode of operation
Type of aeration system
Diffused
Is the basin free of dead spots?
0
❑
❑
❑
Are surface aerators and mixers operational?
❑
❑
0
❑
Are the diffusers operational?
■
❑
❑
❑
Is the foam the proper color for the treatment process?
■
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0
❑
❑
❑
Is the DO level acceptable?
0
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
■
❑
❑
❑
Comment: On the day of inspection the Dissolved Oxygen in the aeration tank was 7 mg/I
Pumps-RAS-WAS
Are pumps in place?
Are pumps operational?
Are there adequate spare parts and supplies on site?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Page# 4
Permit: NCO041386 Owner -Facility: Wanchese Marine Industrial Park WWTP
Inspection Date: 03/14/2024 Inspection Type: Compliance Evaluation
Pumps-RAS-WAS Yes No NA NE
Comment:
Secondary Clarifier
Yes
No
NA
NE
Is the clarifier free of black and odorous wastewater?
❑
❑
0
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
❑
❑
0
❑
Are weirs level?
❑
❑
0
❑
Is the site free of weir blockage?
❑
❑
0
❑
Is the site free of evidence of short-circuiting?
❑
❑
0
❑
Is scum removal adequate?
❑
❑
0
❑
Is the site free of excessive floating sludge?
❑
❑
0
❑
Is the drive unit operational?
❑
❑
0
❑
Is the return rate acceptable (low turbulence)?
❑
❑
0
❑
Is the overflow clear of excessive solids/pin floc?
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth)
❑
❑
0
❑
Comment: The facility uses a Membrane Bioreactor filter (MBR) instead of a Clarifier.
Disinfection - UV
Yes
No
NA
NE
Are extra UV bulbs available on site?
0
❑
❑
❑
Are UV bulbs clean?
❑
❑
❑
Is UV intensity adequate?
■
❑
❑
❑
Is transmittance at or above designed level?
0
❑
❑
❑
Is there a backup system on site?
0
❑
❑
❑
Is effluent clear and free of solids?
0
❑
❑
❑
Comment: Two UV disinfection systems are installed with one unit operational at any given time.
On the day of inspection a bypass valve around the UV disinfection system was open
which allowed wastewater to potentially be discharged without disinfection. The bypass
valve was removed on 3/17/2024.
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
■ ❑ ❑ ❑
❑ ■ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
Page# 5
Permit: NCO041386
Inspection Date: 03/14/2024
Flow Measurement - Effluent
Owner -Facility: Wanchese Marine Industrial Park WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: The effluent flow meter had not been calibrated within the past year. The ORC stated
that a calibration was scheduled for the end of March 2024.
NPDES Permit Standard Conditions Part II. Section D Monitoring and Records, 3 Flow
Measurements - Devices selected shall be capable of measuring flows with a maximum
deviation of less than 10% from the true discharge rates throughout the range of
expected discharge volumes. Flow measurement devices shall be accurately calibrated
at a minimum of once per year and maintained to ensure that the accuracy of the
measurements is consistent with the accepted capability of that type of device.
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? ❑ ❑ 0 ❑
Is sample collected below all treatment units?
0
❑
❑
❑
Is proper volume collected?
❑
❑
❑
■
Is the tubing clean?
❑
❑
0
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
❑
❑
❑
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
❑
❑
❑
representative)?
Comment: Grab samples are taken as required in the NPDES permit.
Page# 6