Loading...
HomeMy WebLinkAbout20231689 Ver 1_More Info Received_20240215Baker, Caroline D From: Trone, Rick <rtrone@withersravenel.com> Sent: Thursday, February 15, 2024 3:52 PM To: Thomas, Zachary T Cc: George.L.Phillips@usace.army.mil Subject: [External] RE: Town of Fuquay-Varina Southern Oaks Sewer Project - DWR#20231689 Request for Additional Information Attachments: FV Southern Oaks Sewer NCDWR RFAI Response Cover Letter and Attache ments..pdf Importance: High CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Zach, Please find attached our response to your RFAI received on February 7, 2024. Lyle and Zach, if you need this submitted via LF forms as well please let me know. Impacts have reduced slightly in two areas. Thanks, 00 Rick Trone 00 ENVIRONMENTAL SCIENTIST III t:919.469.3340 d:919.538.8184 Cary, INC WITH ERSRAVEN EL.COM From: Thomas, Zachary T <zachary.thomas@deq.nc.gov> Sent: Wednesday, February 7, 2024 5:23 PM To: Trone, Rick <rtrone@withersravenel.com> Cc: George.L.PhiIlips@usace.army.mil Subject: [EXTERNAL] Town of Fuquay-Varina Southern Oaks Sewer Project - DWR#20231689 Request for Additional Information CAUTION: This email originated from outside of WithersRavenel. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Rick, I have reviewed the 401 application for the Town of Fuquay-Varina Southern Oaks Sewer Project project and additional information is required to complete my review. Please respond to the items below within 30 days. This application will be considered "on hold" until DWR receives a complete response to the items below: • Impact W4 appears to have a discrepancy between the PCN table and the impact map (Exhibit 8). Please confirm that the impact associated with W4 is for 0.001 acres of temporary construction access, is to be restored, and is not permanent conversion. 1 • Stream 12 is described as Intermittent. On Exhibit 5, it is unclear if this stream channel is temporarily impacted by the crossing being installed at Impact S6 (highlighted in yellow below). Please confirm and update impact totals if reauired. �• r b TEMOOR.ARV YWGTLArVO ir.• PACT .y TEMPORARY Cof,esTRUCTrON ACCE5E 36&32 SF1'0.841. AC F'x11,T 1t44 T 6 OF kJAr rK .„ ,... . J!- CORRIDOR, TYP. .. .t ' .+ • T •_ � � { � - i :, '-,�,_ 'yam y .. i W ET LAND . �- + • . IN'TERWFFTENT IMRAC'i •n TE+ POa n.k'•' STREAM IW PACT ST6iLr 4N 1 SE1NEk C r, 0, r4 rr, rETH CREEEN 31 LF (111; "..+-:0QZ7 A5C.) STREAM F'LC>W To BY BYPASSED STREfi,W FLVW BYVA55 DETAIL -:44 EXHIBaT 16. r4W • Conditions of the 401 require that, "Any construction corridor that is parallel to a stream or open water shall not be closer than 10 feet to the top of bank or ordinary high-water mark (15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c))". There are several proposed locations (Ex: Exhibit 14) of the 40 ft construction corridor that appear to be at or within 10 feet of the top of bank. Please explain how this condition will be met with the proposed easements or reduce/redesign these areas so that it will meet this condition. • While statements were provided in the application for why HDD/jack and bore installation methods were not feasible options for this project, the Division has significant concerns regarding open cut installation methods in large stream systems. It is staff's experience that open cut installation methods within large streams are extremely difficult to construct and maintain in a manner that ensures compliance with water quality standards. Please provide very specific construction details for Stream 1, including proposed dewatering methodology, expectation of encountering rock and methodology for removal of rock, expected construction timeline, and additional measures proposed to ensure water quality protection during construction. If you have any questions, please let me know. Thank you, Zach Thomas Environmental Program Consultant, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 791-4255 zachary.thomas@deg.nc.gov Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Q zm E Emoil correspondence to and from this address is subject to the North Carolina Public Records Low and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.