Loading...
HomeMy WebLinkAbout20080499 Ver 3_More Info Received_20151111F EE7 / PILOT ENVIRONMENTAL INC November 11, 2015 U.S. Army Corps of Engineers Attn: Mr. David Bailey Raleigh Regulatory Field Office Wilmington District U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 North Carolina Division of Water Resources Attn: Ms. Sue Homewood Winston -Salem Regional Office - 401 Wetlands Unit 450 West Hanes Mill Road Winston Salem, North Carolina 27105 Reference: Response to USACE Public Notice Letter Individual 404/401 Permit — SAW- 2013 - 00556, DWR #08- 0499v3 Proposed Phase II Triad Business Park Access Old Greensboro Road Extension Kernersville, Guilford County, North Carolina PEI Project No. 1010 Dear Mr. Bailey and Ms. Homewood: Mr. Brian Hall, TDO Land Holdings, LLC, received a letter from the U.S. Army Corps of Engineers ( USACE) dated September 16, 2015 in response to the Individual 404/401 Permit Application for the proposed Old Greensboro Road Extension, to provide access to Phase II of Triad Business Park (TBP) in Kernersville, Guilford County, North Carolina. The letter indicates that our proposal was advertised by public notice dated August 4, 2015. Comments were received from the US Fish and Wildlife Service ( USFWS), North Carolina Wildlife Resources Commission ( NCWRC) and the North Carolina Division of Water Resources ( NCDWR). The USACE letter indicates that the USFWS has reviewed the proposed project and believes that the proposed project is not likely to adversely affect federally listed threatened and /or endangered species or their critical habitat. Therefore, the USFWS believes that Section 7 of the Endangered Species Act (ESA) has been satisfied for the project. Additionally, the USACE requested additional information. The purpose of this letter is to address the stated NCWRC concerns and USACE requests for additional information. Our responses are shown below. NRWRC Comment: Unnamed tributaries to the West Fork Deep River in the Cape Fear River Basin flow though the site. The U.S. Fish and Wildlife Service recently listed the Northern long - eared bat (Myotis septentrionalis) as threatened under the Endangered Species Act. The PO Box 128, Kernersville, NC 27285 www. Com PEI No. 1010 November 11, 2015 Northern long -eared bat may be present within or in the vicinity of the project site. Therefore, the project may impact this species and consultation with the U.S. Fish and Wildlife Service may be required. Response: We reviewed the U.S. Fish and Wildlife Service ( USFWS) Endangered and Threatened Species List for Guilford County. Northern long -eared bat is not listed as a species that potentially /probably inhabits Guilford County. Based on the USFWS List, it is unlikely that the Northern long -eared bat inhabits the site. Additionally, the USFWS has indicated that the proposed project is not likely to adversely affect federally listed species or their critical habitat. Comment: NCWRC — Recommendation #1 to #6 Response: The applicant acknowledges receipt of recommendations associated with lot development within phase II of TBP, as a result of 404/401 approval of the proposed road access. The applicant indicates that the NCWRC recommendations associated with lot development will be take into consideration upon 404/401 approval of the proposed road access. USACE Comment a: Permits for work within wetlands or other special aquatic sites are available only if the proposed work is the least environmentally damaging, practicable alternative. Please furnish information regarding any other alternatives, including upland alternatives, to the work for which you have applied and provide justification that your selected plan is the least damaging to water or wetland areas. is The application states that the on -site bridge alternative would cost $1 million more than the preferred alternative. However, the itemized preferred alternative cost analysis does not appear to take the cost of proposed compensatory mitigation (stream, wetland, and buffer) into account. Please re- evaluate and compare the total cost each alternative including the cost of proposed compensatory mitigation. Response: The proposed road width has been minimized (details included below). The applicant has revised the estimated construction costs with revised mitigation costs for the following alternatives: 1) No Build- Bridge; 2) On -Site Alternative 1A 3) On -Site Alternative 2A (Preferred Alternative); and, 4) On -Site Alternative 3A. Copies of the construction cost estimates are included as an attachment. The proposed on -site bridge alternative is approximately more than $1,700,000 more than the proposed alternative. ii: The Corps agrees with NCDWR that the applicant was sufficiently notified regarding permitting the project in phases and the resulting infrastructure investments in phase I would not preclude alternatives available to phase II of the project. Further, the Corps cannot include the applicant's sunk costs when determining the least environmentally damaging, practicable alternative per 40 CFR 230. As such, it is not appropriate to include prior infrastructure costs in the current alternatives analysis. PEI No. 1010 November 10, 2015 Response: The applicant remits previous "sunk" costs associated with phased development of the project in evaluation of Alternative 3A. However, as indicated in the previous evaluation, Alternative 3A still has a valuation reduction of approximately $800,000 to the preferred alternative as a result of oddly shaped lots that are poorly conducive to industrial development (i.e. lots 3, 5 and 11). iii: The Corps agrees with NCDWR that On -Site Alternative Crossing Location 3 should be revised to include retaining walls to minimize the impacts to streams and wetlands in order to provide a comparable alternative to On -Site Alternative Crossing Location 2. Response: The applicant has included the evaluation of retaining walls in Alternative 3A, comparable to Alternative 2A (preferred alternative). The result of analysis of both alternatives with retaining walls are similar impacts to streams, wetlands and /or buffer impacts as shown on the attached drawings and in the below table: Table 1- Impact Comparison of Alternatives 2A and 3A Crossing Designation Stream Impact (LF) Wetland Impact (Ac) Buffer Impact (SF) Alternative 2A 188 0.53 27,576 Alternative 3A 174 0.63 27,088 Therefore, based on similar impact to jurisdictional features, the applicant's selection of the preferred alternative is largely associated with economic differences between the alternatives; whereas the preferred alternative has the potential of approximately $800,000 higher value than alternative 3A. USACE Comment b: It is necessary for you to have taken all appropriate and practicable steps to minimize losses of Waters of the U.S., including wetlands. Please indicate all that you have done, especially regarding development and modification of plans and proposed construction techniques, to minimize adverse impacts. i. For the on -site alternatives, do the proposed crossings include two or three lanes? Please provide information on proposed lane widths. If more than two lanes are proposed, please modify your plans and impact estimates accordingly, or provide information justifying why a two lane design is not practicable. Response: The initial application proposed three lanes (two drive lanes and one turning lane) that would be 40 feet wide from curb to curb in the area of proposed impact, in accordance with the Town of Kernersville general requirements for industrial roads. However, the Town of Kernersville has agreed that removal of a turning lane and reduction of total curb to curb length from 40 to 30 feet (curb to curb) would be allowed for the project, only within the proposed area of impact to jurisdictional features. Therefore, the applicant has revised all previously provided alternatives, including the proposed preferred alternative to a 30 foot road width in efforts to further minimize impacts to jurisdictional features. It should be noted that the 30 foot road width, curb to curb, is below N.C. Department of Transportation standards, which are PEI No. 1010 November 10, 2015 also the standards utilized by the Town of Kernersville. Based on safety concerns associated with heavy industrial traffic, reduction of road width below 30 feet is not feasible. Thus, the road width has been minimized to the extent possible within the area of proposed impact to jurisdictional features while maintaining integrity of safe industrial travel. The attached civil exhibits and Table 2 (below) show the results of the road width reduction as it relates to proposed impacts for the project alternatives: Table 2: Proposed Impacts Due to Road Width Reduction in Area of Impact Alternative Crossing Designation Permanent Impacts Estimated Cost of Construction ($) Stream (LF) Wetlands (Ac) Riparian Buffer (SF) Zone 1 Zone 2 EXH -1A 545 0.51 40,433 23,143 3,312,636.13 *EXH -2A 188 1 .53 161832 10,744 2,744,621.88 EXH -3A 174 0.63 16,144 10,944 2,784,408.86 *Preferred Alternative Therefore, in efforts to further reduce and minimize impacts to streams, wetlands and buffers, the applicant proposes to permanently impact 188 linear feet of stream channel, 0.53 acres of wetlands and a cumulative total of 27,576 square feet of riparian surface water buffer. USACE Comment c: The MOA requires that appropriate and practicable mitigation will be required for all unavoidable adverse impacts remaining after the applicant has employed all appropriate and practicable minimization. Please indicate your plan to mitigate for the projected, unavoidable loss of waters or wetlands or provide information as to the absence of any such appropriate and practicable measures. is I have evaluated the compensatory mitigation plan included in your application, and have determined the details to be generally sufficient for our evaluation. However, all of the on -site alternatives require encroaching within the wetland conservation area required by Special Conditions 2 and 3 of the Nationwide Permit (NWP) 12, verified under Action ID: SAW -2008- 02029 on September 12, 2008. In addition to proposing to record an amendment to the conservation area boundaries with the Guilford County Register of Deeds, you must submit a plan to compensate for the proposed loss of compensatory mitigation pursuant to the authorization verified under SAW- 2008 - 02029. PEI No. 1010 November 10, 2015 Response: To compensate for mitigation, the below table outlines the applicant's updated mitigation proposal for unavoidable impact to jurisdictional features: Table 3: Proposed Mitigation and Required Credits Impact Feature Impact Amount Proposed Mitigation Ratio Required Credits Streams 188 LF 2.25:1 423 LF Wetlands 0.53 Ac 2.25:1 1.20 Ac Zone 1 Buffer 16,832 SF 3:1 50,496 SF Zone 2 Buffer 10,744 SF 1.5:1 16,116 SF In consideration of previous USACE approvals, associated with projects determined by the USACE to be single and complete and to account for proposed impact to the conservation easement outlined as a mitigation condition in USACE authorization of verification of SAW - 2008- 02029, the applicant proposes a 2.25:1 ratio for the proposed impacts to streams and wetlands. The amount of proposed impact to the conservation easement is approximately 3.22% of streams and 5.96% of wetlands that were previously protected by the conservation easement mitigation condition of USACE authorization SAW- 2008 - 02029. Based on the above compensatory mitigation proposal, the applicant is providing additional mitigation credits that equate to cumulative totals of approximately 25% of streams and 15% of wetlands protected within the previous conservation easement. Therefore, the applicant has proposed for losses within the previous conservation easement at a 5:1 ratio for streams and 3:1 ratio for wetlands. USACE Comment: Additionally, the following items must be resolved prior to continuing to process your permit request: 1) Item 18 of your permit application describes — and Appendix VII (Transportation Analysis) of your application package evaluates — extending Old Greensboro Road to South Bunker Hill Road. Further, the letters of support included in Appendix VII of your permit application are based on extending Old Greensboro Road to South Bunker Hill Road. However, all exhibits in Appendix II of your application package show proposed Old Greensboro Road terminating via cul -de -sac within the Triad Business Park property. Also, your written alternatives analyses do not specifically describe extending Old Greensboro Road to South Bunker Hill Road as a through road. Please clearly explain and /or correct this discrepancy. Response: The Transportation Analysis and letters of support have been updated to reflect the extension of Old Greensboro Road to terminate via cul -de -sac within Phase II of TBP. Copies of the Transportation Analysis and letters of support are included as attachments. Extension of Old Greensboro Road to South Bunker Hill Road is not being proposed by the applicant. USACE Comment 2): Item 19 of your permit application states the project purpose as providing safe and adequate industrial access to phase 11 of Triad Business Park. However, Appendix VII PEI No. 1010 November 10, 2015 (Transportation Analysis and letters of support) of your application package evaluates the benefits of extending Old Greensboro Road to South Bunker Hill Road as a through road. Note that the two purposes are not the same. For your stated purpose, the Transportation Analysis should instead focus on accessing undeveloped portions of Triad Business Park property via the preferred alternative versus accessing via existing roads in a way that would not require a CWA 404 permit. Response: The Transportation Analysis evaluates the need for the extension of Old Greensboro Road to serve Phase II of TBP. Specifically, this study evaluates the effects with and without the extension in place related to traffic operations, roadway capacity, travel time, and safety. The capacity analysis found that the construction of the extension results in improved level of service for offsite intersections. This is due to the fact that site traffic is able to remain onsite when traveling to /from the west instead of being routed around TBP and increasing traffic on offsite roadways. Less traffic on the offsite roadways results in improved level of service, delay, and safety for the affected intersections. Furthermore, the extension will decrease the truck traffic associated with the TBP on the offsite roadways and rail grade crossings. The extension will allow trucks traveling from the eastern portion of TBP to remain onsite when traveling west, avoid railroad crossings and interaction with traffic on Bunker Hill Road and Mountain Street, and provide a direct route to /from the newly constructed interchange at Macy Grove Road which has ample capacity. The extension will enhance internal operations by providing adequate access and allowing site traffic to remain onsite when traveling to destinations within the TBP. The absence of the extension results in additional travel time, distance, and emissions for site traffic traveling from the eastern portion of the park to destinations to the west. An additional distance of 1.25 miles and time of approximately six minutes is estimated. Analysis results show that approximately 480 PM peak hour trips would be subject to this additional travel time. Based on the results of the Transportation Analysis, the extension of Old Greensboro Road is recommended to provide adequate access to the remainder of the TBP, and enhance the safety and operation of the surrounding roadway network. USACE Comment 3): If the purpose of your project is instead a through road for vehicular traffic (general and industrial), please resubmit your permit application package such that all aspects are consistent with that purpose. Note that your alternatives analysis would likely change considerably, and would likely resemble a NCDOT -type road project. Response: The purpose and need of the application is to safely provide adequate industrial traffic access to Phase II of TBP. Discrepancies of the initial application have been updated to reflect the proposed action and need of the proposed action. USACE Comment 4): The Transportation Analysis (pg. 27) states that NCDOT TIP project U -2800 will create ideal access to Triad Business Park from 1 -40 Business, while the next nearest PEI No. 1010 November 10, 2015 interchange with 1 -40 is Sandy Ridge Road to the east which experiences capacity deficiencies. However, TIP U -4758 proposes improvements to Sandy Ridge Road with the northern terminus as its interchange with 1 -40. As such, the premise that the Sandy Ridge Road interchange is insufficient to handle the increase in truck traffic is not necessarily supported given proposed capacity improvements. Would access to Triad Business Park via the Off -site No Build alternative be practicable with improvements to the Sandy Ridge Road /1 -40 interchange? Response: The TIP 1 -5712 project involves improvements to the SR 1850 (Sandy Ridge Road) and 1 -40 Business interchange in Greensboro. This project is in the preliminary stages and only has a feasibility study complete at the moment. It is funded for 2019 with construction in 2020. The Sandy Ridge Road interchange is approximately 2.7 miles in travel distance to the eastern portion of TBP. This interchange currently experiences capacity deficiencies and is anticipated to worsen in future conditions as traffic volumes continue to grow. Improvements to this interchange are in the preliminary stages and are not planned until 2020. Furthermore, truck traffic associated with the site would need to travel past Colfax Elementary School when traveling to /from the interchange at Sandy Ridge Road. Ideally, heavy truck traffic should be separated from school bus and parent traffic. Thus, the Macy Grove Road interchange provides a more direct route to 1 -40 Business and diverts truck traffic away from Market Street and the school, especially during peak times of school arrival and dismissal times. The newly constructed 1 -40 Business interchange at Macy Grove Road provides an ideal access to the interstate for truck traffic traveling to and from the Triad Business Park. This new interchange has ample capacity and is in closest proximity to the site (approximately 1.5 miles in travel distance to the eastern portion of the development). The proposed extension will provide a more direct route to the interstate for TBP traffic to the newly constructed interchange at Macy Grove Road, and will alleviate offsite roadways and intersections by maintaining traffic onsite. USACE Comment 5): Please itemize all proposed impacts into stream and wetland impacts due to culvert /road fill (permanent loss of waters), rip rap dissipater pads (permanent impact, not a loss of waters), and temporary impacts for construction access, etc. Also, provide a concise restoration plan for all temporary impacts. Response: An itemized table of proposed impacts to stream and wetlands is shown below: Table 4. Itemized Permanent /Temporary Impacts to Streams and Wetlands Feature Permanent Impact Loss of Waters Permanent Impact No Loss of Waters Temporary Impact No Loss of Waters Stream (LF) 98 90 45 Wetlands (Ac) 0.53 0 0.10 Restoration of proposed temporary impact to streams and wetlands associated with construction is shown in the attached drawing DET -1. The applicant proposes to restore stream banks to natural grades and to use matting and live stakes to stabilize temporary disturbed PEI No. 1010 November 10, 2015 stream banks. Additionally, the applicant proposes to restore areas of temporary impact to wetlands by returning impacted wetland areas to similar grade and stabilizing the areas with native seed mixtures, live stakes and potted plants. Matting and /or mulching will be used in areas of temporary wetland impact where grades are conducive to excessive sediment run off. USACE Comment 6): Several items in the administrative records of previously permitted portions of Triad Business Park (SAW- 2008 -01894 and SAW- 2008 - 02092) document plans or commitments to avoid impacts to jurisdictional waters in the area of proposed access to phase 2 of the property, including: a. A "Preliminary Plat, Phase I, Triad Business Park ", dated April 14, 2008, showing access from Bunker Hill Road with cul -de -sac termini on each side of the wetland- stream complex; b. A letter titled "Exhibit B" of the Pre Construction Notice (PCN) dated July 18, 2008, signed by Mr. Arthur Samet, stating that "the intention of ... amending the protective covenants of Triad Business Park is to protect the balance of the jurisdictional waters from further impacts in the portion of Triad Business Park that is yet to be developed, informally known as Phase 2." c. A letter from Mr. Jeffrey Hatling, Community Development Director of the Town of Kernersville, dated July 21, 2008, stated that the elimination of a road crossing proposed for Triad Business Park would not be a major variance from that initially conceived for the Subdivision. This indicated to the Corps that the Triad Business Park could be completed without the proposed road crossing, that no additional impacts would be necessary, and that the three portions of Triad Business Park proposed could each be authorized via NWPs. See also the e -mail exchange between Mr. Andrew Williams of the Corps and Mr. Brian Hall of Samet Corporation dated October 4, 2011. d. Special Conditions 2 and 3 of the NWP 12 verification, dated September 12, 2008, required that remaining jurisdictional areas be preserved and maintained, as documented by Restrictive Covenants recorded in the Guilford County Register of Deeds, including the area proposed for impacts by on -site alternatives. Considering this information (6 a -d), clearly describe what changes have occurred at the site that now require the proposed crossing, when, in 2008, it was determined to be unnecessary. Response: Considering Items 6 a -d, please accept the below response as a summary of the key changes that have occurred at the site, which now necessitate the crossing, when, in 2008, it was determined to be unnecessary. PEI No. 1010 November 10, 2015 In 2008, the Corps issued a Nationwide permit for jurisdictional impacts inside of the TBP, for the benefit of the new FedEx Ground HUB and for the City of High Point's sewer extension project to serve both TBP and FedEx Ground. During that permitting process, the industrial park owner, TDO Land Holding LLC (TDO) limited future development in Triad Business Park by placing a conservation easement around all jurisdictional wetlands in the park, TDO committed to no future jurisdictional impacts in the park and TDO committed to eliminating a future road, stream /wetland crossing of Old Greensboro Road, as shown on the originally approved master plan. Since 2008 and the approval of that Nationwide permit there have been significant changes to the characteristics and surrounding industrial development opportunity of TBP. These changes are driving the need for TDO to request a permit to extend Old Greensboro Road to provide safe and adequate industrial access to Phase II of TBP. The changes include the increased need for large scale industrial sites in the Piedmont Triad Metropolitan Region and the demand for growing collaboration of planning efforts among the region's municipal and county governments for sustained economic development efforts, required to replace the jobs and tax base lost in the Piedmont Triad Region. This newly engaged regional planning and economic development effort has identified that sustainable economic development will require industrially served sites, with infrastructure in place as a main requirement for successful economic development in the Piedmont Triad Region of North Carolina. Prior to the permit submittal in 2008, much of the western portion of Guilford County was planned for industrial development. As part of the recent growth of the Piedmont Triad International Airport (PTIA), in accordance with FAA regulations, PTIA released its airport master plan update and strategic long range vision plan in September 2010 (attached and enclosed for your review). This master plan projects the airports growth for the next 30+ years. In this plan, the airport identified more than 2,200 acres of current industrial land in western Guilford County that will be required to be converted for airport use for the sustained growth PTIA aims to achieve. Phase II of TBP is adjacent to the projected growth plan for the airport and this plan by the airport has impacted TBP in a significant way. Over 2,200 acres of the closest, most competitive and comparable industrial land in our area is now clouded by the airport's master plan and threat of eminent take through the airport's anticipated growth and expansion. For any long term, large scale industrial client, locating a facility within the footprint of the airport's proposed growth footprint is not acceptable. This means the Piedmont Triad has seen a dramatic reduction in available industrially served sites, creating an increase in demand for large industrial sites, and placing an unexpected stress on available, safe and industrially served sites in the western portion of Guilford County that are necessary for job growth and economic development for our region. This was recently validated by Pepsi Bottling Ventures, LLC as they considered Phase II of TBP for a new bottling, sorting and distribution facility. During their site visit at TBP, they stated that Phase II of TBP was a suitable site for their industrial development, only if the site has the ability for their trucks to have direct access by way of proposed extension of Old Greensboro Road to access the Business -40 Macy Grove Interchange. Pepsi was unwilling to accept their trucks interfacing with Bunker Hill Road or a potential at -grade railroad crossing to obtain highway access based upon safety of their PEI No. 1010 November 10, 2015 drivers and industrial grade access for their trucks. It should be noted that Pepsi operates one of North Carolina's largest trucking operations. With limited other options for large scale industrial development in the immediate area, due in large part to PTIA's expansion plan, TDO now understands that it's critical that Phase II of TBP gain safe, industrial grade access to Old Greensboro Road to be a viable industrial site, providing opportunities for regional economic development growth for Kernersville, Guilford County, High Point and Forsyth County, each jurisdiction whom has a vested interest in creating jobs and building tax base in Phase II of TBP. With the need for economic development and job growth in our region, providing adequate infrastructure to attract new jobs is critical. Since 2000, the Greensboro -High Point MSA has lost more than 22,000 jobs, ranking 19th in the nation for job losses over that time span. With the expansion plan of the PTIA announced in 2010, negatively affecting the supply of available industrial sites by the airport, effectively laying claim to more than 2,200 industrial acres in the immediate vicinity, TDO must now work to prepare and develop safe, industrially served sites in order to attract new industry and job growth, working to replace all that's been lost over the past 15 years. This major change since 2008, the reduction of more than 2,200 acres of available industrial land supply in our community and the identified and increased municipal support behind regional economic development, the future of TBP has changed since the 2008 permit. To provide opportunity for our community, to replace the jobs lost, TDO must work to create additional safe, industrially served sites for the benefit of our community, in the form of jobs, economic sustainability and tax base growth. The central area of the Piedmont Triad Metropolitan Region is a dynamic economic development hub within the State of North Carolina. The economic dynamics of our area, and specifically the long range planning of the airport required by the FAA is causing significant changes to the land use planning for the TBP and the surrounding area. If there are questions regarding this request, or a need for further information, please contact us at (336) 708 -4997. Respectfully submitted, PILOT ENVIRONMENTAL, INC. Bradley S. Luckey Michael T. Brame Project Manager Principal 11111���� V;�OF tdaddesigngroup Architecture I Engineering I interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. Box 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 60 F,S\(j' N a ���PORq�F•;o'; SEAL ��11111 •,4tAN��� NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he a d CO) CO) W Z D a cc O a X W • • • ca O If 0 O Cn O U � o °o U 0 O c z O °> L L �>/ L LL ^Q W 0 Mk Date Description Revisions OVERALL EXHIBIT Date: AUGUST , 2014 Drawn: PGS 0heck: LAH Job Number: 14 -064 Sheet: EXH 1 2 3 4 5 6 o� s� 2 D5� s��t M RDU I I I0* EAST MOON ST 0 E+« y° SU O1D GREENSBORO RD pv SR 180 SITE I I E��' � � 1-40 6US,NESS e PyONC E o o R 0 SCA/WCA o VICINITY MAP ° (SCALE 1 : 2000) Area WC-6 PARCEL NO. 0168909 PIN: 6896502711 PARCEL NO. 0220635 2B N /F: TDO LAND HOLDING LLC PIN: 6896601860 DB 6363 PG 393 O N /F: SST PROPERTIES LLC DB 7563 PG 683 I PB 186 PG 102 2C 2A PB 175 PG 97 & 98 PA 1549 OLD GREENSBORO ROAD PB 185 PG 89 PB 186 PG 102 OLD GR Area PA — -- _ N85 °3 6'49 "E �i R�P� so' PUB w -- \�. \\ �` / WPA s10 °14ioo 126.18 S >o °70 * SB NSgGRo R`GN ?60 6p P PARCEL NO. 0168911 PIN: PIN: 6 89 569 581 9 \\ \� 525'21'10 "E N /F: SB JOHNSON II, LLC AND �� 76.64' NB JOHNSON II, LLC \\ N55 °0 "E DB 6786 PG 2506 \ -� -�- 163.63' PARCEL NO. 0168912 _ ::....:'' II / PIN: 6895495429 O \ N /F: FEDEX GROUND PACKAGE SYSEM, INC. DB 6939 PG 2918 PB 175 PG 97 & 98 \ OLD GREENSBORO ROAD O1554 PB 175 PG 97 & 98 , \ 1544 A OLD GREENSBORO ROAD , \\ ISCA \ \ \ \ �\ \\ \ \\ � EXHIBIT l D sc /wc :.::.: OLD GREENSBORO ROAD :;:::: " PROP. 80' R/W .:.:.:.:.::.. :.......... EXH /B/ T 2 :: \� OLD GREENSBORO ROAD PROP. 80' R/W ISD PB _�- \�'---------- -- -- - - EXHIBIT 3 /NDS I : WETLA _ OLD GREENSBORO ROAD _ PROP. 80' R/W :e S >g °»'30'E SC/WC 54 93. _ IRENE STACK I DB 4973 PG 1561 ::-::. > > > >:.:' 17 -94- 6946 - 1191 -65 ZONED: AG / C _ � C w L0 0 7 Are H r0 `4_ ro o Q Z N74 5g 0 01W C° i� 00 on 136.00, Z N_4 56,14 W S�\5\ 9 91p'0» 98,E r<v ��b LEGEND ® POND 17-77-77 1`77-7-71 OR WETLAND STREAM B B A A GfRAF 4 I C SCALE 200 0 we 200 400 111 1111111 1- 800 1 C IN FEET I Inch = 200 ft. 1 2 3 4 5 6 11111���� V;�OF tdaddesigngroup Architecture I Engineering I interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. Box 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 60 F,S\(j' N a ���PORq�F•;o'; SEAL ��11111 •,4tAN��� NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he a d CO) CO) W Z D a cc O a X W • • • ca O If 0 O Cn O U � o °o U 0 O c z O °> L L �>/ L LL ^Q W 0 Mk Date Description Revisions OVERALL EXHIBIT Date: AUGUST , 2014 Drawn: PGS 0heck: LAH Job Number: 14 -064 Sheet: EXH 11111���� V;�OF tdaddesigngroup Architecture I Engineering I interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. Box 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 60 FS�GN GR�Ii a pokgX SEAL ��11111 GINE��� • 4tAN��� NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he a d CO) CO) W Z D a cc O a X W • • • ca O If 0 O Cn O U � o °o U 0 O c z O °> L L �>/ L LL ^Q W 0 Mk Date Description Revisions OVERALL EXHIBIT 1A Date: AUGUST , 2014 Drawn: PCS Check: LAH Job Number: 14 -064 Sheet: EX m1A 1 2 3 4 5 6 o� s� 2 D5� s��t M RDU I I I0* EAST MOON ST 0 y° SU pv E+« O1D GREENSBORO RD SR 180 SITE \ I / E - 1-40 E G RD -, SCA /WCA VICINITY MAP ` I ° (SCALE 1 : 2000) Area A CCESS DRl VE I WC-6 PARCEL NO. 0168909 / /0' RIW PIN: 6896502711 PARCEL NO. 0220635 2B N /F: TDO LAND HOLDING LLC PIN: 6896601860 NPP ACOU /S /T /ON CO. DB 6363 PG 393 O N /F: SST PROPERTIES LLC I DB 449T PG 462 DB 7563 PG 683 I PB 186 PG 102 /T -94- 6946 - 1190 -59 ZA ZC ZONED. Hl PB 175 PG 97 & 98 PA 1549 OLD GREENSBORO ROAD PB 185 PG 89 PB 186 PG 102 OLD GR ENSBOR0 ROAD Area PA "E — NB5'36'49 0 R� P� / �NSgpRoF, 80' PU LIC RIGHT -OF -WAY — — — — S10 °19'41 "E / WPA 141.00' �- _ 126.18 S 3 0 °� O6' SB �3'S 0 oGRe �c R`cN 0� P PARCEL NO. 0168911 PIN: 6895695819 N /F: SB JOHNSON II, LLC AND \� \ .... �� S25 °21'1 0 "E 76.64' I NB JOHNSON II, LLC \ �� N55 °0 "E I DB 6786 PG 2506 \ 163.63' i / PARCEL N0. 0168912 PIN: 6895495429 O .:- •...' ' : _ N /F: FEDEX GROUND PACKAGE SYSEM, INC. DB 6939 PG 2918 i PB 175 PG 97 & 98 O1554 OLD GREENSBORO ROAD ` ,, PB175PG97 &98 ,, ISCA �\ 1544 A OLD GREENSBORO ROAD \ sc /wc t LOT No. 11 t ........... .... D 1 sc /wc / 9�� °S9 �� D I / OLD GREENSBORO ROAD PROP. 80' R/W �`. LOT No. l0 •��• w �+ -- LOT T No. 5 :.. a•.•. V) v) 2L SA /WA l� �\ �\ ISC / LOT No. 9 LOT No. 7 PHASE 2 PHASE l PB :;:: = LOT No. 6 LOT No. 8 .. -.... » »> i / �o , I WETLANDS .:. . _— : :om t e . : : 3 . .. ......... . .S >6. 1 7' p'E SC /WC _ — f : :: ...... : C 4 C Are H ro cD Q 808.01' w N7 4° o i\ oj o 136.00, N_4 56,14 Z ' W s/'4-,50, 9» E 9To 98, r<v ��b LEGEND ® POND 17-77-77 1`77-7-71 OR WETLAND STREAM B B A A GfRAF 4 I C SCALE 200 0 we 200 400 111 1111111 1- 800 1 C IN FEET I Inch = 200 ft. 1 2 3 4 5 6 11111���� V;�OF tdaddesigngroup Architecture I Engineering I interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. Box 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 60 FS�GN GR�Ii a pokgX SEAL ��11111 GINE��� • 4tAN��� NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he a d CO) CO) W Z D a cc O a X W • • • ca O If 0 O Cn O U � o °o U 0 O c z O °> L L �>/ L LL ^Q W 0 Mk Date Description Revisions OVERALL EXHIBIT 1A Date: AUGUST , 2014 Drawn: PCS Check: LAH Job Number: 14 -064 Sheet: EX m1A W W W 14,-__ _W___ /TEMPGkARY S - ' TREAM' SEE SHEET DET -1 IMPACT 25 LF AN FOR STREAM BANK ----- - - - - -- / RESTORATION ''- - / / i / CLASSR'B'QSTONE FABRIC € - W18 MIL POLYETHYLEN -------- - - - - -- I C ON FACE ----------------- -------- I \ \\ W W W W W W W / W ' - - -- \`,(9 /qJ.�\ -'W \ \\ WJ \�'� \�' ��O�J -•Y\ `yJO .�� W \ / W W .W� `Y' _��\ `W `+T_�,. \• -;1' \1,\\ W ��1'�= W W\ W \mil\ \ W W - � W W W'. 42.-Ap0 . W ,✓' W W W W� \z - \�\ \_y/ W \ INV. IN 900.48 /- AIL W W W W W \ / 64 ,,LF FiP W W W W W W W Z -�4�_ _T' JL W J5'x l0' E'KIER6Y DT SSI IAA TOWR W W W W W W W W W W W - -- -- _ r9��J W J' (9p \ QV /0I J W W /W W W/ W W W W� W vlr. -gym r/^ � _ ___ __ �� '• -. '•` ____ ,- W 4/�__ \ \ � 0 / W W / W W W W . _ _ _ _ _ _ - �� - / / _ _ _ _ _ " � -'- _ - (9 /(9/W W W W - \•� 61 COFFER DAM - - _ •� PERMANENT STREAM IMPACT = 38g LF \\ - - - - -- il; OAT 902 / ------------- - - - - -- - • ©. 2: - -------------------- - - - -`- . ` �, AL GRAPHIC SCALE 15809 40 0 10 40 e0 160 ., ` •�� G 1 N •,��1,4LAN N IN FEET OCTOBER 7, 2015 1 inch = 40 ft. VICINITY MAP A 1 North SCALE P = 2000' STREAM IBUFFER IMPACTS ZONE 1 = 21,368 SF ZONE 2 = 14,866 SF TEMP. STREAM IMPACTS = 25 LF PERM. STREAM IMPACTS = 389 LF TEMP. WETLAND IMPACTS = 0.08 AC. PERM. WETLAND IMPACTS = OBI AC. Triad Business Park Old Greensboro Road Extension Kernersville, NC STREAM AND WETLAND IMPACTS SS-1 40 I ' 0 +00 1+00 2 +00 GRAPHIC SCALE to 40 w IN FEET 1 inch = 40 ft. STREAM wm CROSSING VICINITY MAP A 1 North SCALE P = 2000' CONSTRUCTION IN EXISTING STREAM /.KEEP CLEARING AND EXCAVATION OF STREAM BANKS AND BED TO A MINIMUM. 2. INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF CONSTRUCTION AREA TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND CONTINUE PUMPING WHILE WORKING WI THI N STREAM LIMITS. J. INSTALL UPSTREAM COFFER DAM. CONSTRUCT DAMS WITH CLASS B STONE AND POLYETHYLENE FABRIC. COVER PIPE INLET WITH FABRIC AND SAND BAGS. 4. INSTALL DOWNSTREAM COFFER DAM TO PREVENT BACK FLOW INTO CONSTRUCTION AREA. 5. INSTALL TEMPORARY SILT FENCE AND SILT FENCE STONE OUTLETS ALONG TOP OF BANK ON EACH SIDE OF THE CONSTRUCTION AREA PER PLANS. 6. INSTALL DEWATERING BASIN OR SILT BAG AT TOP OF BANK. DEWATER CONSTRUCTION AREA BETWEEN COFFER DAMS USING THE BASIN OR SILT BAG. 7. INSTALL PIPE PER PLANS AND CONSTRUCT ENERGY DISSIPA TOR. 8. UPON COMPLETION OF CONSTRUCTION, REMOVE COFFER DAMS. 9. CONSTRUCT RETAINING WALLS AND FILL FOR DRIVEWAY. •a SEAL ms's 15809 OCTOBER 7, 2015 Triad Business Park Old Greensboro Road Extension Kernersville, NC STREAM AND WETLAND IMPACT SS -2 (EXH1) \ -`_ \, -- -------- - - - - -- ------- - - - - -- 121F. CP `� i y/, •� (NV. 1W,94-36" - - - - -! -' -- ' y/ y,' \� �•\ / I COFFER AAM / t I CLASS W/8 MIL'•PO � ------------- - - - - -- T FABRIC ON, F - - - - - -- 40 0 10 40 w 160 IN FEET I inch = 40 ft. ZONE ZONE; PERMANENT STREAM I IMPACT = 156 LF TEMPORARY STREAM IMPACT = 24 LF 1YLUX 1 SEE SHEET DET -I FOR STREAM BANK RESTORATION o o •a SEAL ms's 15809 •,�',94<AN N OCTOBER 7, 2015 VICINITY MAP / 1 North SCALE P = 2000' STREAM BUFFER IMPACTS ZONE 1 = 13,066 SF ZONE 2 = 6,21-1 SF TEMP. STREAM IMPACTS = 24 LF PERM. STREAM IMPACTS = 156 LF WETLAND IMPACTS = 0.0 AC, Triad Business Park Old Greensboro Road Extension Kernersville, NC STREAM AND WETLAND IMPACT SS -3 (EXH1) 40 I ' 0 +00 1+00 2 +00 GRAPHIC SCALE 10 40 w IN FEET 1 inch = 40 ft. STREAM 160 CROSSING � h, VICINITY MAP North SCALE 1" = 20001 CONSTRUCTION IN EXISTING STREAM /.KEEP CLEARING AND EXCAVATION OF STREAM BANKS AND BED TO A MINIMUM. 2. INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF CONSTRUCTION AREA TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND CONTINUE PUMPING WHILE WORKING WITHIN STREAM LIMITS. 1 INSTALL UPSTREAM COFFER DAM. CONSTRUCT DAMS WITH CLASS B STONE AND POLYETHYLENE FABRIC. COVER PIPE INLET WITH FABRIC AND SAND BAGS. 4.INSTALL DOWNSTREAM COFFER DAM TO PREVENT BACK FLOW INTO CONSTRUCTION AREA. 5. INSTALL TEMPORARY SILT FENCE AND SILT FENCE STONE OUTLETS ALONG TOP OF BANK ON EACH SIDE OF THE CONSTRUCTION AREA PER PLANS. 6. INSTALL DEWATERING BASIN OR SILT BAG AT TOP OF BANK. DEWATER CONSTRUCTION AREA BETWEEN COFFER DAMS USING THE BASIN OR SILT BAG. 7. INSTALL PIPE PER PLANS AND CONSTRUCT ENERGY DISSIPATOR. B. UPON COMPLETION OF CONSTRUCTION, REMOVE COFFER DAMS. 9. CONSTRUCT RETAINING WALLS AND FILL FOR DRIVEWAY. •a SEAL ms's 15809 •,�',9<LAN N JUNE 10, 2015 Triad Business Park Old Greensboro Road Extension Kernersville, NC STREAM AND WETLAND IMPACT SS -4 (EXH1) 11111���� V;�OF tdaddesigngroup Architecture I Engineering I interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. Box 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 60 a �3PORq�F,3'; SEAL .,moo �Q•, ��11111 GINE��� NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he a d CO) CO) W Z D a cc O a X W • • • ca O If 0 O Cn O U � o �o U 0 O c z O > L L �>/ L LL ^Q W 0 Mk Date Description Revisions OVERALL EXHIBIT 2A Date: AUGUST , 2014 Drawn: PCS Check: LAH Job Number: 14 -064 Sheet: EX m2A 1 2 3 4 5 6 o� s� 2 D5� s��t M RDU I I I0* EAST MOON ST 0 y° SU pv E+« O1D GREENSBORO RD SR 180 SITE \ I / E - 1-40 E G RD -, SCA /WCA VICINITY MAP ` I ° (SCALE 1 : 2000) Area WC -6 PARCEL NO. 0168909 PIN: 6896502711 PARCEL NO. 0220635 2B N /F: TDO LAND HOLDING LLC PIN: 6896601860 DB 6363 PG 393 O N /F: SST PROPERTIES LLC DB 7563 PG 683 I PB 186 PG 102 2C 2A PB 175 PG 97 & 98 PA 1549 OLD GREENSBORO ROAD PB 185 PG 89 PB 186 PG 102 t OLD GREENSBORO ROAD Area PA "E — ORO RGPO 80' PUBLIC RIGHT -OF -WAY WPA S10 *1 '41" �_ NB5 °36'49 _ ST O. STO. 366' SB /off/ / e GRE�c�Rg 0 , 6e� 0 6p P ( PARCEL N0. 0168911 PIN: 6895695819 N /F: SB JOHNSON II, LLC AND S25' 76.6 4' ' 76.6 I NB JOHNSON II, LLC E / I DB 6786 PG 2506 \ \ 11 63.63' I / PARCEL NO. 0168912 3 PIN: 6895495429 ( N /F: FEDEX GROUND PACKAGE SYSEM, INC. L7 DB 6939 PG 2918 PB 175 PG 97 & 98 \ I 1554 OLD GREENSBORO ROAD ::::::::::::::: 4 PB 175 PG 97 & 98 `� ISCA 1544 A OLD GREENSBORO ROAD L 0 T No. 11 ' t �. t D I t SC /WC o s N �\ LOT No. /0 LOT No. 5 =t = OLD GREE SBORO ROAD t PROP. 80' R/W t, \� I SD :::: =:.... . ISC PHASE / PHASE 2 LOT No. 7 PB LOT No. 6 • :. ..:.:.:.:.:.:.:. — — 0 j t = LOT No. 9 .' —_ :e S76-17, 30'E :.. ..: :: .......:.:.. : ::: : :: ::: ::: ::: :: SC/WC - - .. LOT No. 8 -:t : :: ....... C C Are H cD Q 808.07' N> 4" w o o 00, N>4 X36 56,74 Z ' W s/'4-,50, 9» 9T0 98,E r<v ��b LEGEND ® POND OR WETLAND STREAM B B A A GfRAF 4 I C SCALE 200 0 we 200 400 111 1111111 1— 800 1 C IN FEET I Inch = 200 ft. 1 2 3 4 5 6 11111���� V;�OF tdaddesigngroup Architecture I Engineering I interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. Box 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 60 a �3PORq�F,3'; SEAL .,moo �Q•, ��11111 GINE��� NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he a d CO) CO) W Z D a cc O a X W • • • ca O If 0 O Cn O U � o �o U 0 O c z O > L L �>/ L LL ^Q W 0 Mk Date Description Revisions OVERALL EXHIBIT 2A Date: AUGUST , 2014 Drawn: PCS Check: LAH Job Number: 14 -064 Sheet: EX m2A 1 1191 \` W\ �•` \• \\ \` \\, COFFER DAM'' CLASS''8'STONE 'W W W W W W W W W W W �' W W W W, `\ \\ \\ \\ ` \'•, ------------------------------ WIt MIL POLYETHYLENE W W \� ; ' \ \ \ \ :• FABRIC. "OIV FACE. "" ,. PERMANENT STREAM W W W W W W W W W W W W W W W IMPACT = 188 LF W W W W W W W W W W W W W W J( W W W W W W W \ \ W W W W W W �1 \ \\ \� \` \ \ \ \` ` \ \�„ W =(71O \--- "_ -� /x - - - -" �``A`\•k\ `\Y \` 1(` �\ �^ W W Y W W W W /Jl, , `\ 906J ` \\ `\ W \\ W\ W W W W W W W W \ \W \\ `\ W W\ W\ W\ W / W W W,41 __- I / \ \ \ \ \,�` ` \\ W` `•� W` \` \`�\ W W W \�W W W W` \;` \` \ \; W \W`9yJ \ \W W W W W W/ � ;Y _________ ` �\ QA/ `\ V \ S. W\ W`\ W `W W W W W W \ \ /•� W W W W \ \ W W W Q2j \W \� V• �� . W \\ � �W �� W W \W \ W W W W --- -- \ \ \Y\ �\ `A •D'\ W W`� \ \W� \W W W W W �I( W W �`�V W W I V. ILY- 'V7E�4 - - W Y W W W.•- W W W W �. W \ ¢' SEE­ -SHEET DET -1 FOR STREAM - BANK Y W • "W W W W rI W ,•,.�- W W o _�\ '/ RESTORATION y COfE& bAy QQ2 ' \ TEMPORARY STREAM 110 L 4" PI IMPACT = 45 LF y 45 7W .6% , � WS W W W W IW W ; W �;' y �'' •' I NV OUT-8 x / W W W W W W W 6 OT / / y 0) 40': \ \ \ �/ �Jr '/� �/� `\ \ \` \ 1 \ `\ � ,11111111// /� y W -' -' ` \ ' ` ` \ N CARP I/ . \\ , \\ \\ \ \ \` �` \` • a SEAL ciCAL '4R 15809 40 0 10 40 80 V00 IN FEET OCTOBER 7, 2015 1 inch = 40 ft. VICINITY MAP A hill North SCALE P = 2000' STREAM BUFFER IMPACTS ZONE 1 = 16,832 SF ZONE 2 = 10,144 SP TEMP. STREAM IMPACTS = 45 LF PERM. STREAM IMPACTS = 166 LF TEMP. WETLAND IMPACTS = 0.10 AC. PERM. WETLAND IMPACTS = 0.53 AC. Triad Business Park Old Greensboro Road Extension Kernersville, NC STREAM AND WETLAND IMPACTS W/RETAI N I N G WALL SS-1 40 l' 0 +00 1+00 2 +00 GRAPHIC SCALE m IV 4m 80 IN FEET I Inch = 40 ft. STREAM The CROSSING � � VICINITY MAP North SCALE I" = 2000' CONSTRUCTION IN EXISTING STREAM /.KEEP CLEARING AND EXCAVATION OF STREAM BANKS AND BED TO A MINIMUM. 2. INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF CONSTRUCTION AREA TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND CONTINUE PUMPING WHILE WORKING WI THI N STREAM LIMITS. 3. INSTALL UPSTREAM COFFER DAM. CONSTRUCT DAMS WITH CLASS B STONE AND POLYETHYLENE FABRIC. COVER PIPE INLET WITH FABRIC AND SAND BAGS. 4.INSTALL DOWNSTREAM COFFER DAM TO PREVENT BACK FLOW INTO CONSTRUCTION AREA. 5. INSTALL TEMPORARY SILT FENCE AND SILT FENCE STONE OUTLETS ALONG TOP OF BANK ON EACH SIDE OF THE CONSTRUCTION AREA PER PLANS. 6. INSTALL DEWATERING BASIN OR SILT BAG AT TOP OF BANK. DEWATER CONSTRUCTION AREA BETWEEN COFFER DAMS USING THE BASIN OR SILT BAG. 7. INSTALL PIPE PER PLANS AND CONSTRUCT ENERGY DISSIPATOR. 8. UPON COMPLETION OF CONSTRUCTION, REMOVE COFFER DAMS. 9. CONSTRUCT RETAINING WALLS AND FILL FOR DRIVEWAY. 'a SEAL ms's 15809 JUNE 10, 2015 Triad Business Park Old Greensboro Road Extension Kernersville, NC STREAM AND WETLAN D I M PACTS W/RETAI N I N G WALL SS -2 (EXH2) uwmmmmmv i'mommommommomm Mrs knml, Emmummummommomm IMMISMIMEMENIME as_4, s rO ffi, as ®®®®®M®E®MI® GRAPHIC SCALE m IV 4m 80 IN FEET I Inch = 40 ft. STREAM The CROSSING � � VICINITY MAP North SCALE I" = 2000' CONSTRUCTION IN EXISTING STREAM /.KEEP CLEARING AND EXCAVATION OF STREAM BANKS AND BED TO A MINIMUM. 2. INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF CONSTRUCTION AREA TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND CONTINUE PUMPING WHILE WORKING WI THI N STREAM LIMITS. 3. INSTALL UPSTREAM COFFER DAM. CONSTRUCT DAMS WITH CLASS B STONE AND POLYETHYLENE FABRIC. COVER PIPE INLET WITH FABRIC AND SAND BAGS. 4.INSTALL DOWNSTREAM COFFER DAM TO PREVENT BACK FLOW INTO CONSTRUCTION AREA. 5. INSTALL TEMPORARY SILT FENCE AND SILT FENCE STONE OUTLETS ALONG TOP OF BANK ON EACH SIDE OF THE CONSTRUCTION AREA PER PLANS. 6. INSTALL DEWATERING BASIN OR SILT BAG AT TOP OF BANK. DEWATER CONSTRUCTION AREA BETWEEN COFFER DAMS USING THE BASIN OR SILT BAG. 7. INSTALL PIPE PER PLANS AND CONSTRUCT ENERGY DISSIPATOR. 8. UPON COMPLETION OF CONSTRUCTION, REMOVE COFFER DAMS. 9. CONSTRUCT RETAINING WALLS AND FILL FOR DRIVEWAY. 'a SEAL ms's 15809 JUNE 10, 2015 Triad Business Park Old Greensboro Road Extension Kernersville, NC STREAM AND WETLAN D I M PACTS W/RETAI N I N G WALL SS -2 (EXH2) 11111���� V;�OF tdaddesigngroup Architecture I Engineering I interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. BOX 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 60 N a ORq�F SEAL ��11111 GINE��� • 4tANV NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he a d CO) CO) W Z D a cc O a X W • • • ca O If 0 O Cn O U � o �o U 0 O c z O °> L L �>/ L LL ^Q W 0 Mk Date Description Revisions OVERALL EXHIBIT 3A Date: AUGUST , 2014 Drawn: PCS Check: LAH Job Number: 14 -064 Sheet: EX m3A 1 2 3 4 5 6 o� s� 2 D5� s��t M RDU I I I0* EAST MOON ST 0 y° SU pv E+« O1D GREENSBORO RD SR 180 SITE \ I / E - 1-40 E G RD -, SCA /WCA VICINITY MAP ` I ° (SCALE 1 : 2000) Area WC-6 PARCEL NO. 0168909 PIN: 6896502711 PARCEL NO. 0220635 2B N /F: TDO LAND HOLDING LLC PIN: 6896601860 DB 6363 PG 393 O N /F: SST PROPERTIES LLC DB 7563 PG 683 I PB 186 PG 102 2C 2A PB 175 PG 97 & 98 PA 1549 OLD GREENSBORO ROAD PB 185 PG 89 PB 186 PG 102 OLD GR _ Area PA NB5 °36'49 ",E — -- �i (D Q 80' PUB W / WPA s10 °19'41 "E 141.00' �' 126.18 s >o•�3 06' SB 36,E O�Q GP 6 �G R�GN 6p ( PARCEL NO. 0168911 \� PIN: 6895695819 \ N /F: SB JOHNSON II, LLC AND � � . S25 °21'1 0 "E 76.64' I NB JOHNSON II, LLC \ � "E DB 6786 PG 2506 \ X\ 163.6 163.63' I / PARCEL N0. 0168912 PIN: 6895495429 ( O LOT No. 11 N /F: FEDEX GROUND PACKAGE SYSEM,INC. ° I DB 6939 PG 2918 PB 175 PG 97 & 98 \ O1554 I OLD GREENSBORO ROAD .... ...... ... PB175PG97 &98 ,, ISCA 1544 A OLD GREENSBORO ROAD SC /WC 1 �� qr�o L O T No. 9 D I SC /WC D \ : . a•.•. Q� Q a :. •. :.::::::::::::::::: 1� . :' LOT No. 8 ISD LOT No. /0 PHASE l PB PHASE 2 :: :: .......... LOT No. 5 - - -- -___ G' \\ --- I —' - - - - -- LOT No. 7 I : WETLANDS OLD GREENSBORO ROA �— PROP. 80' RIW : :-tom e :::: =.. > :: :: :: :: : :: :: >- = = S>6° >'3p sc /wc .— LOT No. 6 C ` C I Are H CD Q N> 808.07' 4° w o i\ QJ o 136.00, N>4 Z r ' -- S >\5- 9» 9TH 98,E r<v ��b LEGEND ® POND 17-77-77 1`77-7-71 OR WETLAND STREAM B B A A GfRAF 4 I C SCALE 200 0 we 200 400 111 1111111 1- 800 1 C IN FEET I inch = 200 ft. 1 2 3 4 5 6 11111���� V;�OF tdaddesigngroup Architecture I Engineering I interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. BOX 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 60 N a ORq�F SEAL ��11111 GINE��� • 4tANV NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he a d CO) CO) W Z D a cc O a X W • • • ca O If 0 O Cn O U � o �o U 0 O c z O °> L L �>/ L LL ^Q W 0 Mk Date Description Revisions OVERALL EXHIBIT 3A Date: AUGUST , 2014 Drawn: PCS Check: LAH Job Number: 14 -064 Sheet: EX m3A TEMPOR4RY STREAM IMPACT I 26 LF k 1\ W PERMANtNT STREAM i - - — - "" "i T IMPACT = 174 LF \� 9)={/- =�i " \, A, � / CO I FER M W W W W. � W % •e V CLAS,S'" ' STONE W J W ! W n V / -y / W18AIL POLYETHYLENE LO I' \ - _ _/ ERR W W W W W \ -' N__ \ ----- ----- ------ - - - -1-- s9-� - ?=' IC ON FACE 4 _ _ _ _ \_ A •\ 9 _ _____ -\ . \_ `'N, \\ �I V. IN�B'93.60 W W W W _` _ W W W W W W W El .w (912) °° \\`\ ' - - -- W W W W �W W `{'•' , \ \ \ 8 IfE \ W W W W \ W W•• W W D \ ` \\ �/ \ i- `Y •\ W, W \W W W W W W ,' J•\W W W J\ �, \V � ` \`\ W \ � ,4' W W W W W W ,•' W W W W W \ ` T W QEW T -.W FOR W ST EAM BAN KW �S-t-E- H NV� 9 3 / RtSTO W W W W W W W W J W W �I• \ \ W W W W J4• \ `\ W\ J� \\/' /� W W W W • W W W W W \ F \ W v[ W W W W \W ,•W W \ \, \\ ''� -_ --- tC�p /+\yW W W p \\`� \\ J' 3�5'X IV�NERG1 SI TOR W W W W ` \W \ \W a \V W \\ W W \ \\ J�. W W W W W W W IW W W W W W W W W W W W/ ` \W \ W �A V� \ \W \ \W W ,\ xO(J}/ \ \ W W W W W W J// _W W\ \ \ r 09. \ \ 0) \ W W W W/ W W W W W W W W• W W W W \ W \ W \\; \\ W W\\ W i W W W W W W W W W W ,' W W W W W W W \\ ^ \ \W ^^\\ \\ \i1\ \ 1. +10 O� W V W W W W W W W W' W W W W W W W W �i$,�� ,CVO ♦\`\ \ \♦ "\ i W W W /a' W W W W W W W'• W W W W W W W W W W W W W W W W W W W W W W W W , W � W `I',`\ W W W W W W W W W W W W W 2J\ ��° � /hO ,' �\ • 41 41 W iSIRA H SCALE 40 0 10 40 w 160 IN FEET I inch = 40 ft. VICINITY MAP lob, North SCALE P = 2000' STREAM BUFFER IMPACTS ZONE 1 = 16,144 SP ZONE 2 = 10,944 SF TEMP. STREAM IMPACT = 26 LP PERM. STREAM IMPACT = 114 LP TEMP. WETLAND IMPACT = 0.196 AC. PERM. WETLAND IMPACT = 0.63 AC. Triad Business Park Old Greensboro Road Extension L-\N OARo j 11, Kernersville, NC ' F E SS/ I • ° PERMANENT STREAM •a SEAL ms's 15809 ��:�� AND WETLAND IMPACT .,GIN' NN 114LAN N OCTOBER 7, 2015 SS-1 E 910 0 + Q 1+00 2 +00 STREAM GRAPHIC 6GALE 40 0 10 40 w 160 IN FEET I Inch = 40 ft. CROSSING � h, VICINITY MAP North SCALE P = 2000' CONSTRUCTION IN EXISTING STREAM L KEEP CLEARING AND EXCAVATION OF STREAM BANKS AND BED TO A MINIMUM. 2. INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF CONSTRUCTION AREA TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND CONTINUE PUMPING WHILE WORKING WI THI N STREAM LIMITS. 3. INSTALL UPSTREAM COFFER DAM. CONSTRUCT DAMS WITH CLASS B STONE AND POLYETHYLENE FABRIC. COVER PIPE INLET WITH FABRIC AND SAND BAGS. 4. INSTALL DOWNSTREAM COFFER DAM TO PREVENT BACK FLOW INTO CONSTRUCTION AREA. 5. INSTALL TEMPORARY SILT FENCE AND SILT FENCE STONE OUTLETS ALONG TOP OF BANK ON EACH SIDE OF THE CONSTRUCTION AREA PER PLANS. 6. INSTALL DEWATERING BASIN OR SILT BAG AT TOP OF BANK. DEWATER CONSTRUCTION AREA BETWEEN COFFER DAMS USING THE BASIN OR SILT BAG. 7. INSTALL PIPE PER PLANS AND CONSTRUCT ENERGY DISSIPA TOR. 8. UPON COMPLETION OF CONSTRUCTION, REMOVE COFFER DAMS. 9. CONSTRUCT RETAINING WALLS AND FILL FOR DRIVEWAY. •a SEAL ms's 15809 OCTOBER 7, 2015 Triad Business Park Old Greensboro Road Extension Kernersville, NC PERMANENT STREAM AND WETLAND IMPACT SS -2 (EXH3) He'd? T161604 LIMA- STREAM GRAPHIC 6GALE 40 0 10 40 w 160 IN FEET I Inch = 40 ft. CROSSING � h, VICINITY MAP North SCALE P = 2000' CONSTRUCTION IN EXISTING STREAM L KEEP CLEARING AND EXCAVATION OF STREAM BANKS AND BED TO A MINIMUM. 2. INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF CONSTRUCTION AREA TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND CONTINUE PUMPING WHILE WORKING WI THI N STREAM LIMITS. 3. INSTALL UPSTREAM COFFER DAM. CONSTRUCT DAMS WITH CLASS B STONE AND POLYETHYLENE FABRIC. COVER PIPE INLET WITH FABRIC AND SAND BAGS. 4. INSTALL DOWNSTREAM COFFER DAM TO PREVENT BACK FLOW INTO CONSTRUCTION AREA. 5. INSTALL TEMPORARY SILT FENCE AND SILT FENCE STONE OUTLETS ALONG TOP OF BANK ON EACH SIDE OF THE CONSTRUCTION AREA PER PLANS. 6. INSTALL DEWATERING BASIN OR SILT BAG AT TOP OF BANK. DEWATER CONSTRUCTION AREA BETWEEN COFFER DAMS USING THE BASIN OR SILT BAG. 7. INSTALL PIPE PER PLANS AND CONSTRUCT ENERGY DISSIPA TOR. 8. UPON COMPLETION OF CONSTRUCTION, REMOVE COFFER DAMS. 9. CONSTRUCT RETAINING WALLS AND FILL FOR DRIVEWAY. •a SEAL ms's 15809 OCTOBER 7, 2015 Triad Business Park Old Greensboro Road Extension Kernersville, NC PERMANENT STREAM AND WETLAND IMPACT SS -2 (EXH3) AREA I EL. 1665 AREA 2 EL. 169.13 W w `s a: > •r ANCHOR STAKE, I' OC NATURAL FIBER LIVE STAKES, MATTING SEE DET. FOR SPACING 12" DIA COIR FIBER ROLL 1/2 DIAL y BANKFULL ELEVATION 0 0 FOLD EDGE UNDER FABRIC 6" GROUND BACKFILL AS REQUIRED p j� REQUIRED O OF LOG WITH THE $OIL NOTE NATURAL FIBER MATTING SHALL EXTEND INTO c44AMEL To COVER ONE-TWIRP AND/OR - OPO O ��rk TO ENSURE FULL CONTACT ggN eggam --11'-2 "x2 "x36" WOOD STAKE NOTE I. STAKE SHALL BE EVENLY SPACED ALONG THE FIBER ROLLS (2' TO 3' APART). 2. STAKES SHALL BE DRIVEN FLUSH WITH THE FIBER ROLL, 3. TOP FIBER ROLLS SHALL NOT HORIZONTALLY EXTEND BEYOND THE END OF THE LOWER ROLL. 4. COIR FIBER ROLLS SHALL BE BIOLOGS BY BON TERRA AMERICA OR EQUIVALENT. S. NATURAL FIBER MATTING SHALL BE CM MATS BY BON TERRA OR EQUIVALENT. DOUBLE COIR FIBER ROLL TOE STABILIZATION WITH LIVE STAKES. DETAIL A /DET —I SQUARE CUT BUDS (FACING LIVE CUTTING (I" TO 2" DIAP ANGLE CUT 3c LIVE STAKES RANDOMLY SPACED ON 2' CENTERS - 2"x2 "x36" BLACK WILLOW LIVE STAKE WOOD STAKE FOR COIR LOG ANCHOR 3/4" S/S" =T1 v M v 0 3/S" THICK 12" ECO ANCHOR STAKE FOLD EDGE UNDER FABRIC 6" AND ANCHOR WITH STAKES I' OC I' TYP. I' MINIMUM UPSTREAM OF DOWNSTREAM OVERLAP WITH FABRIC ON TOP FABRIC 0 0 0 0 0 0 0 0 0 0 0 0 0 I o 0 0 — — — — — — — — — — — — — — — 0 0 — 0 0 — / 0 0 0 0 0 0 0 0 01 0 0 0 0 0 0 0 0 1 _-.•0 0 0 0 0 0 10 0 0 0 W ANCHOR TAKE I 0 0 0 0 0 1 0 O 1 U 0 0 �, 0 0 0 0 0 0 01 0 3 0 a 1 1 1 0 1 0 10 1Vj 0 0 0 0 0 0 0 0 ® 10 0 LL STREAM FLOW FIBER ROLL TOE PROTECTION NOTE I. MATTING SHALL BE ROLLED PARALLEL OR PERPENDICULAR ALONG STREAMBANK. 2. MATTING SHALL EXTEND BELOW THE TOE PROTECTION TO 1/3 CHANNEL WIDTH AND A MINIMUM OF ONE FOOT OVER TOP OF BANK. IF MORE THAN ONE ROLL IS REQUIRED, MID -BANK OVERLAP SHOULD BE A MINIMUM OF ONE FOOT AND SECURELY FASTENED WITH ANCHOR STAKES. 3. LIVE STAKES SHALL BE BLACK WILLOW. NO SCALE LIVE STAKES WITH NATURAL FIBER MATTING DETAIL 5/DET -1 NO SCALE SARO`��'�9'': 'a SEAL �'s 15809 <<AN I�'c\ %0 JUNE 10, 2015 Triad Business Park Old Greensboro Road Extension Kernersville, NC STREAM AND WETLAND IMPACTS DET -1 Schematic Design Estimate Summary- TBP Road Extension Exhibit 2 Br-Av- Recap - With Taxes and Insurance ,Indirect Costs are Spread Group 1: Divisions Estimator Group 2: Minor lternCode Groups Project Size : 0 SF Description Quantity UM TotalCost 01 - General trades Design Pre - Construction Services Project Management and Coordination Construction progress documentation Quality control Temporary utilities Construction facilities Construction aids Project identification Cleaning Closeout submittals * Total 01 - General trades 02 - Sitework Site demolition Site clearing Grading Erosion and sedimentation control Water distribution Sanitary sewers Storm drainage Flexible pavement Curbs and gutters Sidewalks Fences and gates Retaining walls Bridge Structure Lawns and grass "Total 02 - Sitework 21 - Contingency Other construction * Total 21 - Contingency Total Estimate 64,635.44 17,972.96 130,274.18 6,389.01 42,593.37 3,194.50 13,257.19 2,129.67 661.53 7,458.74 288,566.58 7,217.98 34,607.12 222,859.02 194,420.38 170,554.52 440,504.93 11,035.00 SY 639,270.11 65,873.31 58,024.95 21,464.40 2,129,668.70 47,917.55 4,032,382.96 159,725.15 159,725.15 4,480,674.70 109 039 TBP Exhibit 2 B Bridge 10.9.15.est Page 1 10/30/2015 05:01 PM MSAMET CORPMknoN Road Extension 1A ersville, NC dule Of Values k Scope Item eral Trades Samet Proj. No. 09 -039 November 9, 2015 ign Included Below $ 64,635.44 Construction Services Included Below $ 17,972.96 ect Management and Coordination Included Below $ 130,274.18 struction progress documentation Included Below $ 6,389.01 lity Control Included Below $ 42,593.37 iporary Utilities Included Below $ 3,194.50 struction facilities Included Below $ 13,257.19 struction aids Included Below $ 2,129.67 act identification Included Below $ 661.53 ming Included Below $ 7,458.74 ;eout submittals Included Below I General trades Included Below $ 288,566.59 Sitework Mitigation fees Site demolition Site clearing Grading Erosion and sedimentation control Nater distribution Sanitary sewers Storm drainage Flexible pavement 14596.00 SY Curbs and gutters Sidewalks Fences and gates and grass Sitework Other Construction Total 21 - Contingency Total Building Cost with Site Improvements Included Below Included Below Included Below Included Below Included Below Included Below Included Below Included Below Included Below Included Below Included Below Included Below Included Below Included Below Included Below Included Below $ 422,371.24 $ 7,217.98 $ 43,189.68 $ 268,245.83 $ 201,796.76 $ 207,243.38 $ 504,808.15 $ 844,789.74 $ 89,978.50 $ 71,982.80 $ 21,464.40 $ 100,014.57 $ 53,241.72 $ 2,836,344.75 S 187,724.79 S 187,724.79 $ 3,312,636.13 MSAMET CORPMknoN Road Extension 2A ersville, NC dule Of Values k Scope Item eral Trades Construction Services ect Management and Coordination struction progress documentation lity Control iporary Utilities struction facilities struction aids act identification submittals I General trades Sitework Mitigation fees Site demolition Site clearing Grading Erosion and sedimentation control Nater distribution Sanitary sewers Storm drainage Flexible pavement 12146.00 SY Curbs and gutters Sidewalks Fences and gates and grass Sitework Other Construction Total 21 - Contingency Total Building Cost with Site Improvements Samet Proj. No. 09 -039 November 9, 2015 Included Below $ 64,635.44 Included Below $ 17,972.96 Included Below $ 130,274.18 Included Below $ 6,389.01 Included Below $ 42,593.37 Included Below $ 3,194.50 Included Below $ 13,257.19 Included Below $ 2,129.67 Included Below $ 661.53 Included Below $ 7,458.74 Included Below Included Below Included Below $ 288,566.59 Included 247,404.16 Below $ Included Below $ 7,217.98 Included Below $ 34,607.12 Included Below $ 220,729.35 Included Below $ 194,420.38 Included Below $ 170,554.52 Included Below Included Below $ 418,176.42 Included Below $ 703,390.38 Included Below $ 72,528.53 Included Below $ 58,024.95 Included Below $ 21,464.40 Included Below $ 113,138.65 Included Below $ 47,917.55 Included Below $ 2,309,574.39 Included $ 176,380.91 Below S 176,380.91 $ 2,774,521.89 MSAMET CORPMknoN Road Extension 3A ersville, NC dule Of Values k Scope Item eral Trades Construction Services ect Management and Coordination struction progress documentation lity Control iporary Utilities struction facilities struction aids act identification submittals I General trades Sitework Mitigation fees Site demolition Site clearing Grading Erosion and sedimentation control Nater distribution Sanitary sewers Storm drainage Flexible pavement 12226.00 SY Curbs and gutters Sidewalks Fences and gates and grass Sitework Other Construction Total 21 - Contingency Total Building Cost with Site Improvements Samet Proj. No. 09 -039 November 9, 2015 Included Below $ 64,635.44 Included Below $ 17,972.96 Included Below $ 130,274.18 Included Below $ 6,389.01 Included Below $ 42,593.37 Included Below $ 3,194.50 Included Below $ 13,257.19 Included Below $ 2,129.67 Included Below $ 661.53 Included Below $ 7,458.74 Included Below $ 61,078.90 Included Below $ 288,566.59 Included Below $ 246,303.84 Included Below $ 7,217.98 Included Below $ 36,545.11 Included Below $ 230,590.88 Included Below $ 174,575.33 Included Below $ 207,243.38 Included Below Included Below $ 419,603.30 Included Below $ 708,007.51 Included Below $ 76,348.62 Included Below $ 61,078.90 Included Below $ 21,464.40 Included Below $ 57,926.99 Included Below $ 53,241.72 Included Below $ 2,300,147.96 Included Below S 175,694.10 S 175.694.10 $ 2,764,408.65 0 DAVENPORT Transportation Analysis Triad Business Park Old Greensboro Road Extension Assessment Guilford County, NC Prepared for Samet Corporation Original: September 5, 2014 Revised: October 9, 2015 Analysis by: 'Mary Mogan. P.E. Dionne Brown, P.E. •7 /7777771felfllf! Drafting /Graphics by: Mary Morgan. P.E. *.• �� CA��� •,,r Dionne Brown. P.E. +`•'�c���ss1i SEAL 039 Reviewed by: Frank Amenya, P.E., PTOE y� I ; P. 4Jr r "i '° a oC V Is Sealed by: Mara Morgan. P.E. 91 M 4M This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document. including binding, is 100% recyclable. This document, together with the ooncepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. k4w) DAVENPORT Triad Business Park — Old Greensboro Road Extension Assessment Guilford County, NC Prepared for Samet Corporation Updated October 9, 2015 Executive Summary This study provides an update to the Transportation Analysis dated 9/5/2014 completed by DAVENPORT. This study was conducted to provide an evaluation of the potential Extension of Old Greensboro Road in the Triad Business Park. Old Greensboro Road currently runs through the western side of the park and currently terminates west of a stream near the center of the site. The proposed Extension of Old Greensboro Road will extend the road to the east. This study was updated to reflect the Extension ending in a cul -de -sac within the site to serve the eastern lots. Additionally, construction of the Macy Grove Road interchange is now complete and this analysis has been updated with observed traffic counts at the interchange and along Macy Grove Road. The Triad Business Park is located off Mountain Street and Bunker Hill Road in Guilford County, NC. The park contains over 300 acres with 14 industrial lots. DAVENPORT previously prepared a Transportation Impact Analysis (TIA) for the site in 2007 and provided recommendations for interim (Phase 1) and full build conditions. A portion of the western side of the park is developed and the remainder of the park is currently undeveloped. Access is currently provided by Old Greensboro Road and also by Business Park Drive which intersects with Mountain Street. DAVENPORT was retained to determine the effects with and without the Extension in place related to traffic operations, roadway capacity, travel time, and safety. The following intersections were included in the study: • Market Street /Mountain Street at Bunker Hill Road • Bunker Hill Road at Proposed Access • Mountain Street at Business Park Drive /Triad Park Entrance • Old Greensboro Road at Business Park Drive • Macy Grove Road at Old Greensboro Road • 1 -40 Business Eastbound Ramps at Macy Grove Road • 1 -40 Business Westbound Ramps at Macy Grove Road • Mountain Street at Macy Grove Road Ramps To determine the impacts of the potential Extension of Old Greensboro Road, the above - mentioned intersections were analyzed for the following two scenarios: • Future Build Conditions without the Old Greensboro Road Extension • Future Build Conditions with the Old Greensboro Road Extension Assuming an absorption rate of 15 acres per year, a buildout year of 2028 was utilized for this analysis. This analysis was carried out based on North Carolina Department of Transportation (NCDOT) typical standards. Information regarding the property was provided by the developer, Samet Corporation. 10/9/15 13 -054 Old Greensboro Road Extension Assessment — Executive Summary �J DAVENPORT Need for the Old Greensboro Road Extension This section discusses the effects of the Old Greensboro Road Extension and its impacts on roadway capacity, travel time, and safety. Capacity of Roadway Network As shown in the capacity analysis results, the surrounding roadway network is anticipated to be at or near capacity in future build conditions. With the Extension of Old Greensboro Road, site traffic will be able to remain onsite using the Extension when traveling to and from the west (see Exhibit A). Without the Old Greensboro Road Extension, site traffic will have to travel on Bunker Hill Road then to Mountain Street to reach destinations to the west. Therefore, the Extension helps relieve congestion on offsite roadways and intersections by keeping the Triad Business Park traffic onsite. This results in improved level of service for the following intersections: • Market Street / Mountain Street at Bunker Hill Road (LOS F to LOS B) • Mountain Street at Business Park Drive /Triad Park Entrance (LOS E to LOS D) • Mountain Street at Macy Grove Road Ramps (LOS E to LOS A) Additionally, the newly constructed 1 -40 Business interchange at Macy Grove Road provides an ideal access to the interstate for truck traffic traveling to and from the Triad Business Park. This new interchange has ample capacity and is in closest proximity to the site (approximately 1.5 miles in travel distance to the eastern portion of the development). The next nearest interchange with 1 -40 Business is located at Sandy Ridge Road, east of the site approximately 2.7 miles in travel distance to the eastern portion of the development. This interchange currently experiences capacity deficiencies and is anticipated to worsen in future conditions as traffic volumes continue to grow. As previously discussed, improvements to this interchange are not planned until 2020. Furthermore, truck traffic associated with the site would need to travel past Colfax Elementary School when traveling to /from the interchange at Sandy Ridge Road. Ideally, heavy truck traffic should be separated from school bus and parent traffic. Thus, the Macy Grove Road interchange provides a more direct route to 1 -40 Business and diverts truck traffic away from Market Street and the school, especially during peak times of school arrival and dismissal times. Therefore, the Extension will provide a more direct access to the interstate for Triad Business Park traffic to the newly constructed interchange at Macy Grove Road with ample capacity, and alleviate offsite roadways and intersections by maintaining the traffic onsite. 10/9/15 13 -054 Old Greensboro Road Extension Assessment — Executive Summary ii �J DAVENPORT Travel Time As shown in Exhibit A, site traffic traveling to /from the west from the eastern portion of the Triad Business Park will be routed around the site without the Old Greensboro Road Extension. This results in additional travel distance, travel time and emissions for affected site traffic. Site traffic will travel an additional distance of approximately 1.25 miles without the Extension and based on SimTraffic model results, will have approximately six minutes of additional travel time. Analysis results show that approximately 480 PM peak hour trips would be subject to this additional travel time, distance, and emissions. Furthermore, since offsite intersections will experience increased traffic without the Extension, this will increase the delay, travel time, and emissions at affected intersections for both site traffic and background traffic. Safety — General The frequency of accidents generally increases with the amount of vehicle -miles traveled. By reducing the travel time and distance of site traffic, this will tend to reduce the frequency and probability of accidents offsite. Also, the safety of an intersection can be improved with better level of service and operation. As discussed, the Extension of Old Greensboro Road is anticipated to improve the operation of several offsite intersections. The improved operation will enhance the safety of these intersections. In addition, the Extension will decrease the offsite truck traffic associated with the Triad Business Park. The Extension will allow trucks traveling from the eastern portion of the Park to remain onsite when traveling west, and avoid interaction with traffic on Bunker Hill Road and Mountain Street. 10/9/15 13 -054 Old Greensboro Road Extension Assessment — Executive Summary iii k4w) DAVENPORT Safety — Highway -Rail Grade Crossings The Old Greensboro Road Extension would allow for truck traffic to avoid the highway - rail grade crossing on Bunker Hill Road. This crossing is located just south of the intersection at Market Street / Mountain Street. The control devices at this crossing consist of active flashing red lights and gates and a railroad crossing sign (Crossbuck, R15 -1) is provided at the crossing. In addition, advance warning signs (W10 -1) and grade crossing pavement markings are provided. As discussed in the Methodology section of this report, 60% of site traffic was assumed to travel to /from the new 1 -40 Business interchange on Macy Grove Road. With the Extension in place, site traffic traveling to /from the new interchange on Macy Grove Road will be able to access the site directly from Old Greensboro Road and not travel through any at grade crossings. Without the Extension, affected site traffic will be rerouted around the site and through the grade crossing on Bunker Hill Road to reach these destinations. Consequently, the construction of the Old Greensboro Road Extension will enhance the safety of the grade crossing on Bunker Hill Road by reducing the volume of experienced truck traffic. Moreover, the Extension will result in reduced traffic on all of the grade crossings in the area; this is due to the creation of a route from the new interchange on Macy Grove Road for site traffic via Old Greensboro Road without any rail crossings. 10/9/15 13 -054 Old Greensboro Road Extension Assessment — Executive Summary iv �J DAVENPORT Implications to the Triad Business Park & Kernersville Area As outlined in this report, the construction of the Old Greensboro Road Extension will enhance the operation and safety of the surrounding roadway network. This will inherently benefit the operations within the Park by providing safer and more efficient travel to and from the site. The Extension also allows site traffic to remain onsite when traveling to and from destinations within the Triad Business Park itself. This will enhance internal operations while relieving offsite congestion. The Extension will provide adequate access to the future eastern portion of the Triad Business Park. Without the Extension, the majority of site traffic from the eastern portion of the Park will have to travel through the intersection of Market Street / Mountain Street at Bunker Hill Road. This intersection is anticipated to operate at an unacceptable level of service under this scenario (more information can be found in the Capacity Analysis section of this report). This is expected even with the recent improvements of TIP R- 2611. As previously discussed, the lack of the Extension will also result in increased travel time and delay for affected site traffic. Therefore, the future construction of the remainder of the Triad Business Park is encumbered without the Extension of Old Greensboro Road. The Triad Business Park has the ability to serve the Kernersville area with job growth, increased tax base, and overall economic development. As previously discussed, the construction of the Old Greensboro Road Extension will enhance the surrounding area with improved roadway capacity, operation, and safety. Therefore, the Extension will serve as a benefit to the Kernersville area. 10/9/15 13 -054 Old Greensboro Road Extension Assessment — Executive Summary v �J DAVENPORT Recommendations The Extension of Old Greensboro Road is recommended to enhance the operation of the surrounding roadway network by reducing offsite traffic and keeping site traffic within the site. The Extension will provide adequate access to the future eastern portion of the Triad Business Park and enhance onsite operations. Lastly, the Extension is anticipated to benefit the surrounding area with improved traffic operations and safety while also supporting future economic growth. The recommended cross section for the Extension is three lanes — one through lane in each direction and a two -way left turn lane. The intersection of Old Greensboro Road at Business Park Drive should be further evaluated for improvements as the Triad Business Park continues development of lots and if Old Greensboro Road Extension is implemented. The recommended improvements are depicted in Figure 9 of the report. 10/9/15 13 -054 Old Greensboro Road Extension Assessment — Executive Summary vi �J DAVENPORT Summary and Conclusion The Triad Business Park is located off Mountain Street and Bunker Hill Road in Guilford County, NC. The park contains over 300 acres with 14 industrial lots and DAVENPORT previously prepared a Transportation Impact Analysis (TIA) for the site in 2007. A portion of the western side of the park is developed and the remainder of the park is currently undeveloped. Access is currently provided by Old Greensboro Road and also by Business Park Drive which intersects with Mountain Street. Old Greensboro Road runs through the western side of the park and currently terminates west of a stream near the center of the site. This study was conducted to provide an evaluation of the potential Extension of Old Greensboro Road in the Triad Business Park to connect to the eastern lots and terminate with a cul -de -sac. Specifically, this study evaluates the effects with and without the Extension in place related to traffic operations, roadway capacity, travel time, and safety. Two scenarios were considered in this analysis: Future Build Conditions without the Old Greensboro Road Extension; and Future Build Conditions with the Old Greensboro Road Extension. The capacity analysis of this study found that the construction of the Extension results in improved level of service for the following offsite intersections: • Market Street / Mountain Street at Bunker Hill Road (LOS F to LOS B) • Mountain Street at Business Park Drive /Triad Park Entrance (LOS E to LOS D) • Mountain Street at Macy Grove Road Ramps (LOS E to LOS A) This is due to the fact that site traffic is able to remain onsite when traveling to /from the west instead of being routed around the site and increasing traffic on offsite roadways. Less traffic on the offsite roadways results in improved level of service, delay, and safety for the affected intersections. Furthermore, the Extension will decrease the truck traffic associated with the Triad Business Park on offsite roadways and rail grade crossings. The Extension will allow trucks traveling from the eastern portion of the Park to remain onsite when traveling west, avoid rail crossings and interaction with traffic on Bunker Hill Road and Mountain Street, and provide a direct route to /from the newly constructed interchange at Macy Grove Road with ample capacity. The absence of the Extension results in additional travel time, distance, and emissions for site traffic traveling from the eastern portion of the park to destinations to the west. An additional distance of 1.25 miles and time of approximately six minutes is estimated. Analysis results show that approximately 480 PM peak hour trips would be subject to this additional travel time. Also, the Extension will enhance internal operations by providing adequate access and allowing site traffic to remain onsite when traveling to destinations within the Triad Business Park. Based on the results of this study, the Extension of Old Greensboro Road is recommended to provide adequate access to the remainder of the Triad Business Park, 10/9/15 13 -054 Old Greensboro Road Extension Assessment — Executive Summary vii �J DAVENPORT and enhance the safety and operation of the surrounding roadway network. The recommended cross section for the Extension is three lanes — one through lane in each direction and a two -way left turn lane. The intersection of Old Greensboro Road at Business Park Drive should be further evaluated for improvements as the Triad Business Park continues development of lots, particularly if the Old Greensboro Road Extension is constructed. In conclusion, this study has reviewed the impacts of the proposed Old Greensboro Road Extension, and has determined that its construction is necessary in order to provide improved access to the remainder of the Triad Business Park and improved operation and safety of the surrounding roadway network. 10/9/15 13 -054 Old Greensboro Road Extension Assessment — Executive Summary viii ��) DAVENPORT Triad Business Park — Old Greensboro Road Extension Assessment Guilford County, NC Prepared for Samet Corporation Updated October 9, 2015 Table of Contents 1.0 Introduction .............................................................................. ............................... 3 Figure1 — Site Plan ...................................................................... ............................... 4 Figure2A — Site Location ............................................................. ............................... 5 Figure2B — Vicinity Map ............................................................... ............................... 6 2.0 Existing Conditions ................................................................. ............................... 7 2.1 Inventory ................................................................................. ............................... 7 2.2 Existing Traffic Volumes ......................................................... ............................... 7 Figure 3 — Existing Lane Geometry .............................................. ............................... 8 Figure 4 — 2014 Existing Traffic Volumes ..................................... ............................... 9 3.0 Approved Developments and Committed Improvements .. ............................... 10 3.1 Approved Developments ....................................................... ............................... 10 3.2 Committed Improvements ..................................................... ............................... 11 3.2.1 TIP U -4734 Macy Grove Road Extension ...................... ............................... 11 3.2.2 TIP 1 -5712 Sandy Ridge Road Interchange ................... ............................... 11 4.0 Methodology .......................................................................... ............................... 12 4.1 Base Assumptions and Standards ........................................ ............................... 12 4.2 Trip Generation ..................................................................... ............................... 13 4.3 Trip Distribution ..................................................................... ............................... 14 4.4 Future No -Build Traffic .......................................................... ............................... 14 4.5 Future Build Traffic ................................................................ ............................... 14 Exhibit A — Site Traffic Rerouting with & Without Extension ....... ............................... 15 Figure 5A — Project Trip Distribution without the Extension ........ ............................... 16 Figure 5B — Project Trip Distribution with the Extension ............. ............................... 17 Figure 6 — 2028 Future No -Build Volumes .................................. ............................... 18 Figure 7A — Site Trips without the Extension .............................. ............................... 19 Figure 7B — Site Trips with the Extension ................................... ............................... 20 Figure 8A — 2028 Future Build Volumes without the Extension .. ............................... 21 Figure 8B — 2028 Future Build Volumes with the Extension ....... ............................... 22 5.0 Capacity Analysis .................................................................. ............................... 23 5.1 Level of Service Evaluation Criteria ...................................... ............................... 23 5.2 Discussion of Results ............................................................ ............................... 24 5.3 Level of Service Summary .................................................... ............................... 26 6.0 Need for the Old Greensboro Road Extension ................... ............................... 27 6.1 Capacity of Roadway Network .............................................. ............................... 27 6.2 Travel Time ........................................................................... ............................... 28 6.3 Safety — General ................................................................... ............................... 28 6.4 Safety — Highway -Rail Grade Crossings ............................... ............................... 29 6.5 Implications to the Triad Business Park & Kernersville Area ............................... 30 7.0 Recommendations ................................................................ ............................... 30 Figure 9 — Recommended Roadway Improvements ................... ............................... 31 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment DAVENPORT 9.0 Summary and Conclusion .................................................... ............................... 32 Appendix....................................................................................... ............................... 34 TripGeneration ........................................................................... ............................... 35 Level of Service Analysis ............................................................ ............................... 36 TrafficVolume Data .................................................................... ............................... 45 ApprovedDevelopment .............................................................. ............................... 46 TIPInformation ........................................................................... ............................... 47 SupportingDocumentation ......................................................... ............................... 48 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment ��) DAVENPORT Triad Business Park — Old Greensboro Road Extension Assessment Guilford County, NC Prepared for Samet Corporation Updated October 9, 2015 1.0 Introduction This study provides an update to the Transportation Analysis dated 9/5/2014 completed by DAVENPORT. This study was conducted to provide an evaluation of the potential Extension of Old Greensboro Road in the Triad Business Park. Old Greensboro Road currently runs through the western side of the park and currently terminates west of a stream near the center of the site. The proposed Extension of Old Greensboro Road will extend the road to the east. This study was updated to reflect the Extension ending in a cul -de -sac within the site to serve the eastern lots. Additionally, construction of the Macy Grove Road interchange is now complete and this analysis has been updated with observed traffic counts at the interchange and along Macy Grove Road. The Triad Business Park is located off Mountain Street and Bunker Hill Road in Guilford County, NC. Figure 1 provides a site plan and Figures 2A and 2B provide site location and vicinity maps, respectively. The park contains over 300 acres with 14 industrial lots. DAVENPORT previously prepared a Transportation Impact Analysis (TIA) for the site in 2007 and provided recommendations for interim (Phase 1) and full build conditions. A portion of the western side of the park is developed and the remainder of the park is currently undeveloped. Access is currently provided by Old Greensboro Road and also by Business Park Drive which intersects with Mountain Street. DAVENPORT was retained to determine the effects with and without the Extension in place related to traffic operations, roadway capacity, travel time, and safety. The following intersections were included in the study: • Market Street /Mountain Street at Bunker Hill Road • Bunker Hill Road at Proposed Access • Mountain Street at Business Park Drive /Triad Park Entrance • Old Greensboro Road at Business Park Drive • Macy Grove Road at Old Greensboro Road • 1 -40 Business Eastbound Ramps at Macy Grove Road • 1 -40 Business Westbound Ramps at Macy Grove Road • Mountain Street at Macy Grove Road Ramps To determine the impacts of the potential Extension of Old Greensboro Road, the above - mentioned intersections were analyzed for the following two scenarios: • Future Build Conditions without the Old Greensboro Road Extension • Future Build Conditions with the Old Greensboro Road Extension Assuming an absorption rate of 15 acres per year, a buildout year of 2028 was utilized for this analysis. This analysis was carried out based on North Carolina Department of Transportation (NCDOT) typical standards. Information regarding the property was provided by the developer, Samet Corporation. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 3 1111�l� *;�M'F tdaddesigngroup Architecture I Engineering I Interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. Box 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 LN a �3POR4�F SEAL •ff$$ I N��. N/ "'tAN N �� NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he 19 a d W z 7` D a �c O N a NINO X W • • ca i� O L Cn LV , C O CU U � o 2 'S U C- Z U) O '> L L �>� L LL Y ^0_ W 0 Mk Date Description Revisions OVERALL EXHIBIT 2A Date: AUGUST , 2014 Drawn: FCS Check: LAH Job Number: 14 -064 Sheet EX m2A 1 2 3 4 5 6 o� s� 2 D s��t M *C ROU I I I ON EAST MOON ST 0 y° SU pv E+« OLD GREENSBORO RD SR lace SITE \ I / E - 1-40 E G RD -, SCA /WCA VICINITY MAP ` I ° (SCALE 1 : 2000) Area WC -6 PARCEL NO. 0168909 PIN: 6896502711 PARCEL NO. 0220635 2B N /F: TDO LAND HOLDING LLC PIN: 6896601860 DB 6363 PG 393 � O N /F: SST PROPERTIES LLC DB 7563 PG 683 I PB 186 PG 102 2c 2A PB 175 PG 97 & 98 PA 1549 OLD GREENSBORO ROAD PB 185 PG 89 PB 186 PG 102 t OLD GREENSBORO ROAD Area PA "E — OR0 R0 PO 80' ( PUBLIC RIGHT -OF -WAY — — — — WPA S10 °1 '41" �_ N85 °36'49 126.18 0. 06' 366' SB /off/ / e GRE�c�Rg 0 , 6e� 0 6p P ( PARCEL N0. 0168911 PIN: 6895695819 N /F: SB JOHNSON II, LLC AND 525'21'10 "E 76.64' I NB JOHNSON II, LLC E / I DB 6786 PG 2506 1163.63' I / PARCEL NO. 0168912 3 PIN: 6895495429 ( � N /F: FEDEX GROUND PACKAGE SYSEM, INC. DB 6939 PG 2918 PB 175 PG 97 & 98 I 1554 OLD GREENSBORO ROAD 4 t, PB175PG97 &98 `� ISCA ............. 1544 A OLD GREENSBORO ROAD LOT No. 11 ' t t ,�\ D I t SC /WC 9r� o D s N �\ LOT No. /0 LOT No. 5 =t = OLD GREENSBORO ROAD t PROP. 80' R/W I SD ISC PHASE / PHASE 2 LOT No. 7 PB LOT No. 6 - -- .....:.:.:.:.:.:.: / 0 j t = LOT No. 9 .' —_ .' :e 6 °� >'3o'E :=:=: 1 :: :: :: :: :: ::: ::::: :: : ::: : : S SC /WC — — .. LOT No. 8 -:t ................... C C Are H ro Q N> 808.07' 4° w o i\ C6 o 136.00, N74 56,14 Z ' W S >,5\'09» 91p 98,E r<v ��b LEGEND ® POND 17-77-77 1`77-7-71 OR WETLAND STREAM B B A A GfR,4i=�4 f C SC,4L E 200 0 we 200 400 800 C IN FEET I Inch = 200 ft. 1 2 3 4 5 6 1111�l� *;�M'F tdaddesigngroup Architecture I Engineering I Interior Design Triad Design Group, P.C. 4807 -C Koger Boulevard Greensboro, NC 27407 Telephone 336- 218 -8282 Facsimile 336- 218 -8010 www.triad- designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C -1108 SAMET CORPORATION P.O. Box 8050 Greensboro, NC 27419 (336) 544 -2600 FAX: (336) 544 -2638 LN a �3POR4�F SEAL •ff$$ I N��. N/ "'tAN N �� NOT FOR CONSTRUCTION PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. he 19 a d W z 7` D a �c O N a NINO X W • • ca i� O L Cn LV , C O CU U � o 2 'S U C- Z U) O '> L L �>� L LL Y ^0_ W 0 Mk Date Description Revisions OVERALL EXHIBIT 2A Date: AUGUST , 2014 Drawn: FCS Check: LAH Job Number: 14 -064 Sheet EX m2A 0 FIGURE 2A SITE LOCATION MAP SITE INDICATOR I FIGURE 2B STUDY INTERSECTIONS VICINITY MAP EXISTING PROPOSED DAVENPORT 2.0 Existing Conditions 2.1 Inventory A field investigation was conducted by DAVENPORT staff to determine the existing roadway conditions in the study area. Table 2.1 contains the results of this effort. Figure 3 illustrates the existing lane geometry. 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by DAVENPORT staff, including the newly opened Macy Grove Road interchange. Table 2.2 contains the dates these counts were conducted. Figure 4 shows existing AM and PM peak hour volumes. More information can be found in the Traffic Volume Data section of the appendix. Table 2.2 - Traffic Volume Data Table 2.1 - Street Inventory Market Street /Mountain Street at Bunker Hill Road 8/5/2014 DAVENPORT Facility Name Route Typical Cross Pavement Speed Maintained 1� # Section Width Limit By Mountain Street / SR 2 -lane undivided Approx. 24 feet 45 MPH NCDOT Market Street 1008 DAVENPORT Road Mountain Street at Macy Grove Road Ramps SIR DAVENPORT Bunker Hill Road 2-lane undivided Approx. 20 feet 35 MPH NCDOT Old Greensboro SR 2 -lane undivided Approx. 22 feet 45 MPH NCDOT Road 1846 2 -lane divided Business Park Drive 1994 2 -lane w/ TWLTL Approx. 50 feet Not posted NCDOT at site Macy Grove Road 1860 2 -lane undivided Approx. 22 feet 45 MPH NCDOT 1 -40 Business 421 8 -lane divided Approx. 96 65 MPH NCDOT feet 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by DAVENPORT staff, including the newly opened Macy Grove Road interchange. Table 2.2 contains the dates these counts were conducted. Figure 4 shows existing AM and PM peak hour volumes. More information can be found in the Traffic Volume Data section of the appendix. Table 2.2 - Traffic Volume Data LCount Location Date Taken By Market Street /Mountain Street at Bunker Hill Road 8/5/2014 DAVENPORT Mountain Street at Business Park Drive /Triad Park 10/7/2015 DAVENPORT Entrance Old Greensboro Road at Business Park Drive 8/5/2014 DAVENPORT Macy Grove Road at Old Greensboro Road 10/6/2015 DAVENPORT 1 -40 Business Eastbound Ramps at Macy Grove 10/7/2015 DAVENPORT Road 1 -40 Business Westbound Ramps at Macy Grove 10/7/2015 DAVENPORT Road Mountain Street at Macy Grove Road Ramps 10/7/2015 DAVENPORT 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 7 A rU7NSIGNALIZED N INTERSECTION - RIGHT IN / RIGHT OUT ROUNDABOUT d a L 300' T N) p wo ROADWAY o cn _ r L %-1001 oo' 50 --a- r 300' --a- TRAFFIC MOVEMENT .� � � 1 0 r 225' Mountain Street 0 Market Street BLACK = EXISTING 75' 0 J 0 GREEN = COMMITTED �t 200' ' t, `'ROPOSED +4 r 350'—r `T' �� �i 1 oo 75' 200' 0 0 N -600' M ) N CA d 111 � 550' r � it 0 Old Greensboro Road ~ 0 J J Ti r 200' 1 r 0 0 W a � Q�ID ro 0 0 C 350' a r 4j 11 r 400' 0 r 350' 0 0 C: FIGURE 3 hT � I -40 Business EXISTING LANE -n GEOMETRY r `r 1 1 ~ TRIAD BUSINESS PARK - PROPOSED CONNECTOR ROAD 0 0 This document, together with the concepts and designs presented herein, is PROJECT NUMBER 13 -054 intended only for the specific purpose and client for which it was prepared. Reuse 700' 1 of, or improper reliance on, this document by others without written authorization i ro and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. NOT TO SCALE `` N Jw o cn t. 78/78 148 / 405 r 1/1 124 / 165 1 t 285/205--* I CO o N J cn � rn N N Ul � CO 4 co (O �jl L 15/21 r 177/219 Old Greensboro Road J W N J v C7 ci O O L 91 / 91 4 -0/5 r 54/40 t N N W N A co N N � N � W O O O I d U CL 330 / 222 RIAD BUSINESS PARK - PROPOSED � � N 23/30 V " `11`4 4- 187/511 r 135 /110 0 /0�► 0 INTERSECTION 0 0 W 6/30 a U 330 / 222 RIAD BUSINESS PARK - PROPOSED LSIGNALIZED J INTERSECTION 6 pp �� 0 /0�► 11* INTERSECTION v W < N co O rn 'V d intended only for the specific purpose and client for which it was prepared. Reuse W F L 4/6 —mi.- TRAFFIC MOVEMENT Mountain Street 0 Market Street 0 X1 /0 J BLACK = EXISTING 8/22--* x228 / 155 �J GREEN = COMMITTED BLUF ` PROPOSED shall be a violation of the agreement between DAVENPORT and the client. NOT TO SCALE 2/4� J r 1 -40 Business W x 0 O 01 C U RIAD BUSINESS PARK - PROPOSED LSIGNALIZED J INTERSECTION . UNSIGNALIZED 0 /0�► 11* INTERSECTION • RIGHT IN / RIGHT OUT 106 / 26 --t N) N This document, together with the concepts and designs presented herein, is ROUNDABOUT L 27/114 intended only for the specific purpose and client for which it was prepared. Reuse ROADWAY 227 / 793 r 5/25 —mi.- TRAFFIC MOVEMENT Mountain Street 0 Market Street 0 17/86 1 0 433 / 273 � h 1 1 BLACK = EXISTING 8/22--* J rn GREEN = COMMITTED BLUF ` PROPOSED shall be a violation of the agreement between DAVENPORT and the client. NOT TO SCALE _ AM /PM PEAKS W x 0 O 01 C U RIAD BUSINESS PARK - PROPOSED 34 / 154 1 CONNECTOR ROAD 0 /0�► 11* 106 / 26 --t A a This document, together with the concepts and designs presented herein, is PROJECT NUMBER 13 -054 cn w intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization po rn and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. NOT TO SCALE DAVENPORT 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. There are two (2) developments in the vicinity of the project to be included in the analysis. The Kernersville Medical Center and the VA Healthcare Center are located on Kernersville Medical Parkway in Kernersville, NC. An update to the traffic analysis for this development was last provided by Little John Engineering Associates in 2014. The site consists of a hospital, VA Clinic, medical offices, and the Blue Diamond Site which proposes retail, office, and industrial uses. Currently, the hospital has been constructed and is in operation. Therefore, potential trips from the VA Clinic, medical offices, and Blue Diamond Site were estimated and distributed onto the study area roadways. Another development in the area is the Carrollton Mixed Use Development. The proposed Carrollton Mixed -Use Development is located on the southwest quadrant of NC 66 and Old Salem Road in Kernersville, North Carolina. The transportation impact analysis was last updated by DAVENPORT in 2013 for this development. The proposed development will ultimately consist of retail, residential, and a commercial /business park. The development has a trip generation potential of 1,236 net trips in the AM peak and 1,673 net trips in the PM peak. Given this development's location, the background growth rate applied to existing volumes was assumed to account for traffic associated with this development. More information related to the approved developments can be found in the Supporting Documentation section of the appendix. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 10 �J DAVENPORT 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT, a local municipality, or a developer in the area, but not yet constructed. 3.2.1 TIP U -4734 Macy Grove Road Extension TIP U -4734 proposes to extend Macy Grove Road north of Mountain Street to NC 150 (North Main Street). This project is currently unfunded for construction and therefore not considered in this analysis. 3.2.2 TIP 1 -5712 Sandy Ridge Road Interchange This project involves improvements to the SR 1850 (Sandy Ridge Road) and 1 -40 Business interchange in Greensboro. This project is in the preliminary stages and only has a feasibility study complete at the moment. It is funded for 2019 with construction in 2020. More information can be found in the supporting documentation of the Appendix. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 11 ��) DAVENPORT 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. The following table contains a summary of the base assumptions: Table 4.1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 2.0% per year for all roadways Analysis Software Synch ro/Si mTraffic Version 8 Sidra Intersection Version 5.1 Base Signal Timing /Phasing Provided by NCDOT Lane widths 12 feet Truck percentages 3% 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 12 �J DAVENPORT 4.2 Trip Generation As indicated earlier, the Triad Business Park consists of over 300 acres comprised of 14 lots. Table 4.2 provides a summary of the developed and remaining acreage per lot. Lot Table 4.2 - Development Summary Develope (acres Remaining (acres) Lot 1 Lot 2 Lot 3 Lot 4 Lot 5 Lot 6 • : • Lot 7 Lot 8 Lot 9 i Lot 10 Lot 11 Lot 12 Lot 13 Lot 14 6 Total J 341.12 A&M 140.74 AM • . 200.38 Consistent with the TIA prepared by DAVENPORT in 2007, site densities for each lot were determined by using densities of square footage per acre at a comparable industrial park (Union Cross Industrial Park, Forsyth County — 5,960 square feet per acre). TripGen 2013 software, based on the 91" edition of ITE Trip Generation Manual, was used to project trips for this development. Table 6.3 presents the results. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 13 �M) DAVENPORT 4.3 Trip Distribution Site trips for the remainder of the Triad Business Park development were distributed based on the existing traffic patterns and engineering judgment. The directional distributions for site trips are as follows: • 35% to and from the east on 1 -40 Business • 25% to and from the west on 1 -40 Business • 15% to and from the west on Mountain Street • 10% to and from the east on Market Street • 10% to and from the south on Bunker Hill Road • 5% to and from the north on Bunker Hill Road With the Extension in place, all site traffic entering and exiting from Macy Grove Road and the new 1 -40 Business interchange to the west will be able to access the site by using Old Greensboro Road. Without the Extension in place, site traffic on the east side of the Triad Business Park will have to travel around the site via Bunker Hill Road, to Mountain Street, then finally to the new roundabout to access Macy Grove Road. Exhibit A provides a depiction of the routing of site traffic with and without the Extension. The project trip distribution is shown in Figure 5A for the scenario without the Old Greensboro Road Extension and Figure 5B for the scenario with the Extension 4.4 Future No -Build Traffic The 2028 future no build traffic volumes were computed by applying a 2.0% compounded annual growth rate to the existing traffic volumes. More information can be found in the Traffic Volume Data section of the appendix. Figure 6 shows the 2017 future no build traffic volumes for AM and PM peaks. 4.5 Future Build Traffic The 2028 build -out traffic volume was obtained by summing the 2028 future no build volumes and site trips due to the proposed development. Site trips without the Extension are shown in Figure 7A and with the Extension in Figure 7B. The 2028 future build volumes are shown for the scenarios with and without the Old Greensboro Road Extension in Figures 8A and 8B, respectively. More information can be found in the Traffic Volume Data section of the appendix. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 14 I EXHIBIT A ROUTE WITHOUT EXTENSION SITE TRAFFIC REROUTING WITH & ROUTE WITH EXTENSION WITHOUT EXTENSION PROPOSED EXTENSION N .Q 0 Z 1 `45% OUT `► — 15% OUT 15 %INS► J, 0 O C 1 r 15% OUT Old Greensboro Road A � 8 8 0 0 Z Z v O C C O N N W U1 (11 0 0 00 C C 35% IN 25% IN 1 d a v m 50% OUT r� 10% IN 50% IN O h r 5% IN 10% IN 1 Market o 0 5% OUT W � ' o o' �J LA. O 0 O N TRAFFIC MOVEMENT U [n a o N M _ Z Z d x L �► 20% OUT 4-15% OUT J J r r 10% IN 1 -40 Business Mountain Street o 4-5% IN z r 5% IN 00 1 Market 5% OUT 1 O Street 5% OUT h 1* 50% IN o 0 �J O 0 C C cn 0 Z 55% OUT 1 10% OUT --4 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and * ** NOT TO SCALE * ** shall be a violation of the agreement between DAVENPORT and the client. W c 7 m 2 M O W C ti O Z O SIGNALIZED 0 INTERSECTION . UNSIGNALIZED INTERSECTION - RIGHT IN / RIGHT OUT �J ROUNDABOUT ROADWAY —pi.- TRAFFIC MOVEMENT BLACK = EXISTING GREEN = COMMITTED ORIGIN NODE FIGURE PROJECT TRIP DISTRIBUTION WITHOUT EXTENSION TRIAD BUSINESS PARK - PROPOSED CONNECTOR ROAD PROJECT NUMBER 13 -054 A 7e7uj N NTERSECTION RIGHT IN / RIGHT OUT c 1!'� r5'%I. m ROUNDABOUT x cn o 4-10% IN ROADWAY r 25% IN Mountain Street � 00 Market , TRAFFIC MOVEMENT 15% IN h 1-40 5% OUT 1 0 Street 15% IN �--► h BLACK = EXISTING � 01 10 %OUTS GREEN = COMMITTED o° 8' 10% OUT � L 0 0 0 o M - Z w ORIGIN o l d NODE r 60% OUT T L 40% OUT 0 Old Greensboro Road X60% OUT 0 J J 0 r+ � r 55% IN �► 0 0 Z m 0 W C O N N W U1 (11 0 0 M 00 m � � 4 *---35% C IN O O 0 8 a z I -40 Business FIGURE PROJECT TRIP DISTRIBUTION 0 c -� EXTENSION O TRIAD BUSINESS PARK - PROPOSED O 25% IN 1 0 CONNECTOR ROAD This document, together with the concepts and designs presented herein, is PROJECT NUMBER 13 -054 intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and * ** NOT TO SCALE * ** shall be a violation of the agreement between DAVENPORT and the client. N N A N 120/103 195 / 628 r 1/1 223 / 270 1 t 376/274--* I It o w W � N � � N a1 N 'j l L 20/28 r 234/289 Old Greensboro Road o ip wo A N O w A � >v A ci O (D L 120 / 120 4 -0/7 r 307 / 263 ') t co w V _ N N W C71U1 I L. I -40 Business I I 45/203 1 Toot CONNECTOR ROAD LSIGNALIZED J INTERSECTION lr 258/140--t . UNSIGNALIZED This document, together with the concepts and designs presented herein, is PROJECT NUMBER 13 -054 tw INTERSECTION cn a, of, or improper reliance on, this document by others without written authorization RIGHT IN / • and adaptation by DAVENPORT shall be without liability to DAVENPORT and RIGHT OUT Co CL 1!'� y co W -4 ROUNDABOUT w w x %- 30 40 N a L 36 / 150 iv °' C° ° / N 385 / 784 ROADWAY 1 *� 296/674 � ' 178 / 145 r 7/33 0 Mountain Street 0 Market Street —mi.- TRAFFIC MOVEMENT 8 / 40 1 452 / 293 0 22 / 113 1 0 626 / 403 t h 1 BLACK = EXISTING 8 / 13 pp No 11 / 29 -1, �2 N GREEN = COMMITTED BLUE- PROPOSED Co y N AM /PM PEAKS .9 co d co F L 5/8 ,� X10 /0 J J 4r218 / 265 1 r W M 3/5� F 2 0 O 01 C I -40 Business I I RIAD BUSINESS PARK - PROPOSED 45/203 1 Toot CONNECTOR ROAD 0/02: lr 258/140--t N N This document, together with the concepts and designs presented herein, is PROJECT NUMBER 13 -054 tw intended only for the specific purpose and client for which it was prepared. Reuse cn a, of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and Co shall be a violation of the agreement between DAVENPORT and the client. NOT TO SCALE N cn N 00 �f t- 71/614 0 0 T2 24 / 205 r 0/0 0/01 t 174/28w►I o 0 0 0 /0� 0 0 0 V 00 L 0/0 r 24 / 205 Old Greensboro Road d CL v d 0 0 o x L 0/0 0 o O 4- 79 / 682 1 k, 0 r 116/19 0/0j O N ir. O C' On N A W _ 116/19 \ N A W v O J INTERSECTION 1 fll :29:1 G1 CL iii c 0 m co 0 0 /0M-E!I� A cT O cT 0 /0-4 o 0 Wn v 0 0 L 407/65 r 0/0j r 58/9 +-0 /0 116/19 00 Market Street r 0/0 d CL v d 0 0 o x L 0/0 0 o O 4- 79 / 682 1 k, 0 r 116/19 0/0j O N SIGNALIZED O O C' On 0 INTERSECTION 116/19 o p v O J INTERSECTION 1 N < N N :29:1 0 / 47 1 0 m co F 0 /0M-E!I� �J It► 0 /0-4 o 0 J 0 0 d CL v d 0 0 o x L 0/0 0 o O 4- 79 / 682 1 k, 0 r 116/19 0/0j o SIGNALIZED O 581 / 93 0 INTERSECTION 116/19 . UNSIGNALIZED INTERSECTION V N < N N - RIGHT IN / cT ? 0 M d RIGHT OUT m co F L 32/273 �J It► L 0/0 4---24/205 J 4-- 58 / 9 ROADWAY r 0/0j r 58/9 r 116/19 00 1 -40 Business This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. Mountain Street * ** NOT TO SCALE * ** W C 7 i 2 M 0 W C SIGNALIZED O 0 INTERSECTION . UNSIGNALIZED INTERSECTION - RIGHT IN / RIGHT OUT �J ROUNDABOUT W O O L 0/0 0 0 0 4-- 58 / 9 ROADWAY r 58/9 00 Market Street —Pi TRAFFIC MOVEMENT 8 / 68 1 O 8/68 1 h 1 %� BLACK = EXISTING 581 / 93 o GREEN = COMMITTED -4 �0 rnCo co w W AM PM PEAKS 0 O O 87 / 750 16 / 136 O O * ** NOT TO SCALE * ** W C 7 i 2 M 0 W C X, m � n CL c 0 A M O (T n v L 407/65 +-0 /0 r 0/0 O N O o A O v 4 O J 1 0 SIGNALIZED 0 291/47) 0 0 INTERSECTION ° N 0 /0-4 o 0 0 0 . UNSIGNALIZED INTERSECTION RIGHT IN / RIGHT OUT r24/ CL v 1!'� ROUNDABOUT 0 0 o 0 0 0 1 O O L. 0/0 o O o ° ° ✓ 0/0 4� 0 / 0 cO ° ° 0/ 19 ROADWAY 0 291 / 47 Mountain Street 0 Market Street � TRAFFIC MOVEMENT 0 0 0/0 t 0 � � 0 0 ti t 1. 8 /68 J o ti t % BLACK = EXISTING 174/28 O p p 174 / 28 —w�* pp a ° 0 16 / 136 -� O o GREEN = COMMITTED 0/ 0 O O O N N p W p 0 p M O M cT m Ao H AM / PM PEAKS L 0/0 V d 0 o r 95/818 _ m con F L 63/546 00 Old Greensboro Road 4 It► 4-95 / 81 8 J — ° i r' r o /oJ r O 639 / 102 o 4 X, m � n CL c 0 A M O (T n v L 407/65 +-0 /0 r 0/0 1 -40 Business This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. * ** NOT TO SCALE * ** W c _ 2 M 0 W C O N O o O v 4 O J 1 0 291/47) 0 0 /0M-Ell� 0 /0-4 o 0 0 0 1 -40 Business This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. * ** NOT TO SCALE * ** W c _ 2 M 0 W C N a w cn cn Co 1 -40 Business This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. Mountain Street SIGNALIZED O ° �4 M w N m O N N� I d C INTERSECTION 191/717 1 W 0 336 / 250 1 �L 30/ 40 � 2 3 19 / 8 i L 36 / 150 258 / 140 k' 4-375 / 1 356 0 294 / 164 ROADWAY r 65/42 0 Market Street 223/270 1 t 8/ 40 1 1033 / 386 0 550/302 �► I BLACK = EXISTING 592/122--* o N GREEN = COMMITTED v o_ rn V 00 O O 124/32 W w °nN 1/3 O O O 0 M N N A cn O L 20 / 28 N w m N N N d W 00 6 r 258 / 494 co 0) F L 37 / 281 00 Old Greensboro Road �% ► 34 / J5 J _ 0 1 `218 / 265 1 Nil r w 119/24 N W O _ co N co W � fll G1 iii CL c cn N � C, ° L 527/185 vw +-0/7 1J j k r 307 / 263 a w cn cn Co 1 -40 Business This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. Mountain Street SIGNALIZED O ° �4 M w O N N� I rn rn INTERSECTION 6] N_ 1 0 336 / 250 1 0 ROUNDABOUT 0 /0� L 36 / 150 258 / 140 N N a w cn cn Co 1 -40 Business This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. Mountain Street * ** NOT TO SCALE * ** W C 7 i 2 M 0 W . SIGNALIZED O 0 INTERSECTION . UNSIGNALIZED INTERSECTION - RIGHT IN / RIGHT OUT o ROUNDABOUT L 36 / 150 N 443 / 793 ROADWAY r 65/42 00 Market Street —Pi TRAFFIC MOVEMENT 30/181 1 0 634 /471 h BLACK = EXISTING 592/122--* o N GREEN = COMMITTED rn V 00 O O ° AM PM PEAKS 0 O O 87 70 h 6 O O * ** NOT TO SCALE * ** W C 7 i 2 M 0 W . N N ? N t- 120 /103 0 o N +...- 219 /833 r 1/1 223 / 270 � j c 550 / 302 o 1/3� 0 0 0 co A C.0 o 0) o OD jt. 20/28 r 329/1107 Old Greensboro Road o�w o A A w fll G1 iii CL c 0 cn N � C, ° L 527/185 vw 4-0/7 1J j r 307 / 263 � �4 M w O N N� rn rn I 6] N_ 1 t1-41. 336 / 250 0 /0258 / 140 a w cn cn C O d CL w w ` `30/40 O ° 4 j 0 4- 296 / 674 0 r � �4 M w O N N� rn rn I 6] N_ 1 t1-41. 336 / 250 0 /0258 / 140 a w cn cn C O d CL w w ` `30/40 O ° 4 j 0 4- 296 / 674 0 r a w cn cn C O L 8/401 452 / 293 182/41 v 7 co N 0) N Cn � � � j � N W N l d rn m W F L 68 / 554 W 4-105/818 l J x218 / 265 1 r 642 / 107 1 -40 Business This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. Mountain Street O \ O 60i N � 30 / 181 1 L 642 / 539 27/165'7 * ** NOT TO SCALE * ** SIGNALIZED O INTERSECTION 0 . UNSIGNALIZED INTERSECTION - RIGHT IN / RIGHT OUT �J ROUNDABOUT L 36 / 150 4-- 501 / 803 ROADWAY r 7/33 Market Street —Pi TRAFFIC MOVEMENT i i h 1 �► BLACK = EXISTING w N GREEN = COMMITTED N W co V AM /PM PEAKS W C 7 i 2 M 0 W . d CL w w ` `30/40 O ° 4 j 0 4- 296 / 674 0 r 8/401 452 / 293 182/41 v 7 co N 0) N Cn � � � j � N W N l d rn m W F L 68 / 554 W 4-105/818 l J x218 / 265 1 r 642 / 107 1 -40 Business This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. Mountain Street O \ O 60i N � 30 / 181 1 L 642 / 539 27/165'7 * ** NOT TO SCALE * ** SIGNALIZED O INTERSECTION 0 . UNSIGNALIZED INTERSECTION - RIGHT IN / RIGHT OUT �J ROUNDABOUT L 36 / 150 4-- 501 / 803 ROADWAY r 7/33 Market Street —Pi TRAFFIC MOVEMENT i i h 1 �► BLACK = EXISTING w N GREEN = COMMITTED N W co V AM /PM PEAKS W C 7 i 2 M 0 W . 1 -40 Business This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. Mountain Street O \ O 60i N � 30 / 181 1 L 642 / 539 27/165'7 * ** NOT TO SCALE * ** SIGNALIZED O INTERSECTION 0 . UNSIGNALIZED INTERSECTION - RIGHT IN / RIGHT OUT �J ROUNDABOUT L 36 / 150 4-- 501 / 803 ROADWAY r 7/33 Market Street —Pi TRAFFIC MOVEMENT i i h 1 �► BLACK = EXISTING w N GREEN = COMMITTED N W co V AM /PM PEAKS W C 7 i 2 M 0 W . W C 7 i 2 M 0 W . 0 DAVENPORT 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board's Highway Capacity Manual (HCM) utilizes a term "level of service" to measure how traffic operates in intersections and on roadway segments. There are currently six levels of service ranging from A to F. Level of service "A" represents the best conditions and Level of Service "F" represents the worst. Synchro Traffic Modeling software was used to determine the level of service for studied intersections. Note for unsignalized intersection analysis, the level of service noted is for the worst approach of the intersection. This is typically the left turn movement for the side street approach, due to the number of opposing movements. All worksheet reports from the analyses can be found in the Appendix. Table Capacity Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec) A <- 10 A <- 10 B >10and < -20 B >10and <_15 C >20 ands 35 C >15and <_25 D >35and <_55 D >25and <_35 E >55and <_80 E >35and <_50 F > 80 F > 50 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 23 ��) DAVENPORT 5.2 Discussion of Results The results of the capacity analysis are discussed by intersection below: Market Street / Mountain Street at Bunker Hill Road This signalized intersection is anticipated to operate at LOS C in the AM peak and LOS F in the PM peak in future conditions without the Extension of Old Greensboro Road. With the Extension in place, the LOS is expected to improve to LOS B during the AM and PM peaks. Bunker Hill Road at Proposed Access The proposed access on Bunker Hill Road was assumed to have the recommended improvements in place from the prior 2007 study which include signalization, a southbound right turn lane, and separate right and left turn egress lanes. With these improvements, LOS A is anticipated during the AM peak and LOS B during the PM peak in the scenario without the Extension. Mountain Street at Business Park Drive /Triad Park Entrance Without the Old Greensboro Road Extension, LOS D is anticipated during the AM peak and LOS E during the PM peak in future build conditions. With the Extension in place, the intersection is anticipated to be improved to LOS B during the AM peak and LOS D during the PM peak. Old Greensboro Road at Business Park Drive The southbound approach of this unsignalized intersection is anticipated to operate at LOS C during the AM and PM peaks without the Old Greensboro Road Extension. With the Extension in place, site traffic will have the opportunity to remain onsite and travel through this intersection to reach Macy Grove Road and the new 1 -40 Business interchange. While this will relieve congestion and delay on offsite roadways, this intersection will experience increased traffic and delay with the Extension in place and operate at LOS F during the AM and PM peaks, respectively. As the Triad Business Park continues development of lots and if Old Greensboro Road Extension is implemented, this intersection can be further evaluated for improvements to improve the LOS and accommodate future traffic volumes. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 24 �J DAVENPORT Macy Grove Road at Old Greensboro Road This intersection will be signalized and three - legged in future conditions. LOS C is anticipated during the AM and PM peaks for the scenario without the Extension. Increased traffic on the minor road (Old Greensboro Road) is anticipated with the Extension in place and the intersection is estimated to operate at LOS D and F during the AM and PM peaks, respectively. If the Extension is constructed, the signal timing at this intersection could be optimized to better accommodate future traffic volumes. 1 -40 Business Eastbound Ramps at Macy Grove Road In the scenario without the Old Greensboro Road Extension, LOS C is anticipated during the AM and PM peaks. This is anticipated to remain unchanged in the scenario with the Extension in place. 1 -40 Business Westbound Ramps at Macy Grove Road For both scenarios with and without the Old Greensboro Road Extension, LOS C or better is anticipated during the AM and PM peaks. Mountain Street at Macy Grove Road Ramps This new intersection is a roundabout and serves as the junction between Mountain Street and Macy Grove Road. In the scenario without the Extension, LOS E is anticipated in the AM and PM peaks. With the Extension in place, less traffic is anticipated at this intersection and the LOS improves to LOS A during the AM peak. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 25 DAVENPORT 5.3 Level of Service Summary Table 5.2 summarizes the level of service analysis at the study intersections. Intersections that improve with the construction of the Old Greensboro Road Extension are shaded in yellow. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 26 DAVENPORT 6.0 Need for the Old Greensboro Road Extension This section discusses the effects of the Old Greensboro Road Extension and its impacts on roadway capacity, travel time, and safety. 6.1 Capacity of Roadway Network As shown in the capacity analysis results, the surrounding roadway network is anticipated to be at or near capacity in future build conditions. With the Extension of Old Greensboro Road, site traffic will be able to remain onsite using the Extension when traveling to and from the west (see Exhibit A). Without the Old Greensboro Road Extension, site traffic will have to travel on Bunker Hill Road then to Mountain Street to reach destinations to the west. Therefore, the Extension helps relieve congestion on offsite roadways and intersections by keeping the Triad Business Park traffic onsite. This results in improved level of service for the following intersections: • Market Street / Mountain Street at Bunker Hill Road (LOS F to LOS B) • Mountain Street at Business Park Drive /Triad Park Entrance (LOS E to LOS D) • Mountain Street at Macy Grove Road Ramps (LOS E to LOS A) Additionally, the newly constructed 1 -40 Business interchange at Macy Grove Road provides an ideal access to the interstate for truck traffic traveling to and from the Triad Business Park. This new interchange has ample capacity and is in closest proximity to the site (approximately 1.5 miles in travel distance to the eastern portion of the development). The next nearest interchange with 1 -40 Business is located at Sandy Ridge Road, east of the site approximately 2.7 miles in travel distance to the eastern portion of the development. This interchange currently experiences capacity deficiencies and is anticipated to worsen in future conditions as traffic volumes continue to grow. As previously discussed, improvements to this interchange are not planned until 2020. Furthermore, truck traffic associated with the site would need to travel past Colfax Elementary School when traveling to /from the interchange at Sandy Ridge Road. Ideally, heavy truck traffic should be separated from school bus and parent traffic. Thus, the Macy Grove Road interchange provides a more direct route to 1 -40 Business and diverts truck traffic away from Market Street and the school, especially during peak times of school arrival and dismissal times. Therefore, the Extension will provide a more direct access to the interstate for Triad Business Park traffic to the newly constructed interchange at Macy Grove Road with ample capacity, and alleviate offsite roadways and intersections by maintaining the traffic onsite. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 27 DAVENPORT 6.2 Travel Time As shown in Exhibit A, site traffic traveling to /from the west from the eastern portion of the Triad Business Park will be routed around the site without the Old Greensboro Road Extension. This results in additional travel distance, travel time and emissions for affected site traffic. Site traffic will travel an additional distance of approximately 1.25 miles without the Extension and based on SimTraffic model results, will have approximately six minutes of additional travel time. Analysis results show that approximately 480 PM peak hour trips would be subject to this additional travel time, distance, and emissions. Furthermore, since offsite intersections will experience increased traffic without the Extension, this will increase the delay, travel time, and emissions at affected intersections for both site traffic and background traffic. 6.3 Safety — General The frequency of accidents generally increases with the amount of vehicle -miles traveled. By reducing the travel time and distance of site traffic, this will tend to reduce the frequency and probability of accidents offsite. Also, the safety of an intersection can be improved with better level of service and operation. As discussed, the Extension of Old Greensboro Road is anticipated to improve the operation of several offsite intersections. The improved operation will enhance the safety of these intersections. In addition, the Extension will decrease the offsite truck traffic associated with the Triad Business Park. The Extension will allow trucks traveling from the eastern portion of the Park to remain onsite when traveling west, and avoid interaction with traffic on Bunker Hill Road and Mountain Street. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 28 ��) DAVENPORT 6.4 Safety — Highway -Rail Grade Crossings The Old Greensboro Road Extension would allow for truck traffic to avoid the highway - rail grade crossing on Bunker Hill Road. This crossing is located just south of the intersection at Market Street / Mountain Street. The control devices at this crossing consist of active flashing red lights and gates and a railroad crossing sign (Crossbuck, R15 -1) is provided at the crossing. In addition, advance warning signs (W10 -1) and grade crossing pavement markings are provided. As discussed in the Methodology section of this report, 60% of site traffic was assumed to travel to /from the new 1 -40 Business interchange on Macy Grove Road. With the Extension in place, site traffic traveling to /from the new interchange on Macy Grove Road will be able to access the site directly from Old Greensboro Road and not travel through any at grade crossings. Without the Extension, affected site traffic will be rerouted around the site and through the grade crossing on Bunker Hill Road to reach these destinations. Consequently, the construction of the Old Greensboro Road Extension will enhance the safety of the grade crossing on Bunker Hill Road by reducing the volume of experienced truck traffic. Moreover, the Extension will result in reduced traffic on all of the grade crossings in the area; this is due to the creation of a route from the new interchange on Macy Grove Road for site traffic via Old Greensboro Road without any rail crossings. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 29 DAVENPORT 6.5 Implications to the Triad Business Park & Kernersville Area As outlined in this report, the construction of the Old Greensboro Road Extension will enhance the operation and safety of the surrounding roadway network. This will inherently benefit the operations within the Park by providing safer and more efficient travel to and from the site. The Extension also allows site traffic to remain onsite when traveling to and from destinations within the Triad Business Park itself. This will enhance internal operations while relieving offsite congestion. The Extension will provide adequate access to the future eastern portion of the Triad Business Park. Without the Extension, the majority of site traffic from the eastern portion of the Park will have to travel through the intersection of Market Street / Mountain Street at Bunker Hill Road. This intersection is anticipated to operate at an unacceptable level of service under this scenario (more information can be found in the Capacity Analysis section of this report). This is expected even with the recent improvements of TIP R -2611. As previously discussed, the lack of the Extension will also result in increased travel time and delay for affected site traffic. Therefore, the future construction of the remainder of the Triad Business Park is encumbered without the Extension of Old Greensboro Road. The Triad Business Park has the ability to serve the Kernersville area with job growth, increased tax base, and overall economic development. As previously discussed, the construction of the Old Greensboro Road Extension will enhance the surrounding area with improved roadway capacity, operation, and safety. Therefore, the Extension will serve as a benefit to the Kernersville area. 7.0 Recommendations The Extension of Old Greensboro Road is recommended to enhance the operation of the surrounding roadway network by reducing offsite traffic and keeping site traffic within the site. The Extension will provide adequate access to the future eastern portion of the Triad Business Park and enhance onsite operations. Lastly, the Extension is anticipated to benefit the surrounding area with improved traffic operations and safety while also supporting future economic growth. The recommended cross section for the Extension is three lanes — one through lane in each direction and a two -way left turn lane. The intersection of Old Greensboro Road at Business Park Drive should be further evaluated for improvements as the Triad Business Park continues development of lots and if Old Greensboro Road Extension is implemented. The recommended improvements are depicted in Figure 9. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 30 A rU7NSIGNALIZED N INTERSECTION - RIGHT IN / RIGHT OUT ROUNDABOUT d a L 300' T N) p wo ROADWAY o cn _ r %-1001 ,00' L 50 --a- r 300' --a- TRAFFIC MOVEMENT .� � � 1 0 r 225' Mountain Street 0 Market Street BLACK = EXISTING 75' 0 J 0 GREEN = COMMITTED �t 200' ' t, `'ROPOSED +4 r 350'—r `T' �� �i 1 oD 75' 200' 0 0 N -600' < M ) N N d 111 � 550' r � it 0 Old Greensboro Road ~ QO J J J 200' J r r Evaluate for necessary 0 0 improvements x 0 development and 0 a O • . Greensboro Road 'o p0 rD F ID s -n L 350' o 1 1 r 400' lu 0 r 350' O 0 t `1 1 c FIGURE 9 1 -40 Business RECOMMENDED -n IC IMPROVEMENTS r r 1 1 ~ TRIAD BUSINESS PARK - PROPOSED CONNECTOR ROAD 0 0 This document, together with the concepts and designs presented herein, is PROJECT NUMBER 13 -054 intended only for the specific purpose and client for which it was prepared. Reuse 700' 1 of, or improper reliance on, this document by others without written authorization i ro and adaptation by DAVENPORT shall be without liability to DAVENPORT and • NOT TO SCALE shall be a violation of the agreement between DAVENPORT and the client. " `` DAVENPORT 9.0 Summary and Conclusion The Triad Business Park is located off Mountain Street and Bunker Hill Road in Guilford County, NC. The park contains over 300 acres with 14 industrial lots and DAVENPORT previously prepared a Transportation Impact Analysis (TIA) for the site in 2007. A portion of the western side of the park is developed and the remainder of the park is currently undeveloped. Access is currently provided by Old Greensboro Road and also by Business Park Drive which intersects with Mountain Street. Old Greensboro Road runs through the western side of the park and currently terminates west of a stream near the center of the site. This study was conducted to provide an evaluation of the potential Extension of Old Greensboro Road in the Triad Business Park to connect to the eastern lots and terminate with a cul -de -sac. Specifically, this study evaluates the effects with and without the Extension in place related to traffic operations, roadway capacity, travel time, and safety. Two scenarios were considered in this analysis: Future Build Conditions without the Old Greensboro Road Extension; and Future Build Conditions with the Old Greensboro Road Extension. The capacity analysis of this study found that the construction of the Extension results in improved level of service for the following offsite intersections: Market Street / Mountain Street at Bunker Hill Road (LOS F to LOS B) Mountain Street at Business Park Drive /Triad Park Entrance (LOS E to LOS D) Mountain Street at Macy Grove Road Ramps (LOS E to LOS A) This is due to the fact that site traffic is able to remain onsite when traveling to /from the west instead of being routed around the site and increasing traffic on offsite roadways. Less traffic on the offsite roadways results in improved level of service, delay, and safety for the affected intersections. Furthermore, the Extension will decrease the truck traffic associated with the Triad Business Park on offsite roadways and rail grade crossings. The Extension will allow trucks traveling from the eastern portion of the Park to remain onsite when traveling west, avoid rail crossings and interaction with traffic on Bunker Hill Road and Mountain Street, and provide a direct route to /from the newly constructed interchange at Macy Grove Road with ample capacity. The absence of the Extension results in additional travel time, distance, and emissions for site traffic traveling from the eastern portion of the park to destinations to the west. An additional distance of 1.25 miles and time of approximately six minutes is estimated. Analysis results show that approximately 480 PM peak hour trips would be subject to this additional travel time. Also, the Extension will enhance internal operations by providing adequate access and allowing site traffic to remain onsite when traveling to destinations within the Triad Business Park. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 32 DAVENPORT Based on the results of this study, the Extension of Old Greensboro Road is recommended to provide adequate access to the remainder of the Triad Business Park, and enhance the safety and operation of the surrounding roadway network. The recommended cross section for the Extension is three lanes — one through lane in each direction and a two -way left turn lane. The intersection of Old Greensboro Road at Business Park Drive should be further evaluated for improvements as the Triad Business Park continues development of lots, particularly if the Old Greensboro Road Extension is constructed. In conclusion, this study has reviewed the impacts of the proposed Old Greensboro Road Extension, and has determined that its construction is necessary in order to provide improved access to the remainder of the Triad Business Park and improved operation and safety of the surrounding roadway network. 10/9/15 13 -054 Triad Business Park — Old Greensboro Road Extension Assessment 33 KERNERSVILLE FIRE RESCUE Fire Marshal's Office gin., Post Office Drawer 728 • Kernersville, North Carolina 27285 -0728 October 28, 2015 Mr. Jeff Hatling Director of Community Development Town of Kernersville Mr. Hatling: This letter shall serve as a statement in support of the effort to establish a stream crossing and continue Old Greensboro Road from its current dead -end to serve the eastern portion of the Triad Business Park and potentially connect to Bunker Hill Road. Without a crossing, the eastern portion of the business park is essentially cut -off from the western portion and emergency response times are extended beyond nationally recognized standards. In order to respond to the eastern portion of the park without a stream crossing, fire apparatus will be forced to travel W. Market Street outside the city limits to Bunker Hill Road as opposed to traveling a continuous route on Old Greensboro Road and remaining within current Kernersville city limits. This is a more direct route and would enable the fire department units to respond within appropriate time frames and provide emergency medical and /or emergency fire services as needed. Extended response times effect the Insurance Services Office ratings of the fire department and have a negative effect on insurance rates in the areas of extended response times. It is my opinion that the stream crossing will enable our department to better serve the occupancies within the eastern portion of the park thereby providing timely emergency services; protecting lives and reducing property loss. The proposed crossing is within the best interest of public safety. Please contact me if you need further information or have any questions. Respectfully, Bruce Hennequin Fire Marshal Kernersville Fire Rescue Telephone 336- 996 -6791 . Fax 336- 996 -4298 Kernersville Police Department Scott A. Cunningham Chief of Police June 25, 2015 Mr. Jeff Hatling Director, Community Development Town of Kernersville Mr. Hatling, Post Office Box 728 Kernersville, NC 27285 Phone: 336.996.2390 Far: 336.992.5470 I am writing in support of the project to establish a roadway across the stream near the current dead -end of Old Greensboro Road. Continuing the roadway across the stream will have immediate and definite benefits for the citizens regarding public safety. The proposed road continuance, which requires the stream to be crossed, will provide better access into Phase 2 of Triad Business Park and potentially South Bunker Hill Road. It will allow for more frequent and efficient patrols by personnel of the Kernersville Police Department (KPD). Officers will have quicker response times to Phase 2 of Triad Business Park and to the Macy Grove/421 Interchange area. This would enhance general service to the Park, As Chief of the Kernersville Police Department, I am interested in and will support any and all efforts to increase the safety of Our community and our citizens. I believe this roadway expansion and stream crossing is essential and beneficial. Please feel free to contact me if I can be of further assistance in this or any other public safety matter. Respectfully, A Scott A. Cunningham Chief of Police Kernersville Police Department 134 E. Mountain Street e Kernersville, North Carolina, 27244 www.toknc.co n ;A Nationally Accredited Law Enforcement Agency will allow PTAA to clearly identify future airport development needs to the various federal, state and local transportation and land use planning agencies that will be affected by the airport's growth. 6.4 PHASED LAND ACQUISITION AND AIRPORT DEVELOPMENT PROGRAM This Airport Master Plan Update anticipates that PTAA will acquire additional land for aviation -related airport development purposes in three phases. This multi -phase land acquisition program may potentially occur over the next several decades as land is needed for airport growth and to accommodate new airport tenants. Although strategically envisioned and planned as three distinct and separate phases of land acquisition, it is clearly recognized that real-world dynamics will influence the timing, methodology and financial considerations regarding when and how additional land would be acquired by PTAA. These factors may include, but would not be limited to, the availability of needed land offered by a willing seller, the price of land, the availability of funding required to purchase land, Interim- or Long -Term income generation potential of land under consideration for purchase and the need for land under consideration for purchase to directly support aviation - related activities. Thus, PTAA might find itself acquiring land within the next 10 years that was not anticipated for purchase in the Airport Master Plan Update until a later time period (i.e., Phase 2 or Phase 3), because of unforeseen circumstances, opportunities or a common sense decision to undertake such actions. Accordingly, because this Airport Master Plan Update cannot accurately predict when these circumstances might occur, the timeline for such land acquisition, as recommended, should be considered a guide rather than a rule. 6.4.1 PROPOSED PHASED AIRPORT LAND ACQUISITION PROGRAM The proposed multi -phase acquisition of approximately 2,300 acres of land that will be required to accommodate future strategic (30-50 year) airport development needs is depicted in Figure 6-3. At the completion of the phased land acquisition program, the total airport land area would be approximately 6,200+ acres. 6.4.2 PROPOSED AIRPORT LAND ACQUISITION PHASE 1 (0-10 YEARS Proposed land acquisition within Phase 1 includes 243 acres, much of which is located northwest of Bryan Boulevard in proximity to the airport's new Runway 5L/23R, and a proposed future Taxiway G located parallel and northwest of that runway. Acquisition of this land is necessary in the Near -Term to ensure the highest and best use of the new runway and airport property that is not currently used for aviation -related purposes. That is, the airport must have adequate land in proximity to the runway to accommodate tenants who will make use of the runway. Phase 1 envisions purchasing additional land along Regional Road and West Market Street, which is near the southwest end of the Runway 5L/23R and west of the Runway 14/32. This property will allow infill development of an area that is already largely occupied by airport cargo, maintenance and general aviation uses. An additional parcel on the southeast side of the current airport property will fill out an area in close proximity to Honda Aviation Company's headquarters and manufacturing campus, which is in turn adjacent to the existing 10,001 -foot Runway 5R/23L. The proposed multi -phased airport acquisition program is depicted in Figure 6-4. J:\Greensboro Master Plan Update\MPU REPORT\Section 06- Strategic AMP lmp\Section6.doc 6-6 Airport Master Plan Update and Strategic Long -Range Visioning Plan Piedmont Triad International Airport /i\\\`/// \ T °< o• POTENTIAL ° o FUTURE RIDE Q=<.�NTERCHANGE PL�PSpN� o' o�<------------ I POTENTIA FUTURE_ NTERSTATE 7HIGHWAY 68� IKi R HANGE _° II -- \ r T RIDG_RD. PLEA M _ SAN E73 `ZA zi I• 68 -- ------------ -------- _= �a — \ �. . POTENTIAL /I' -- V �.\ ✓ii �� ��A� 1 FUTURE INTERCHANGE \ '�'� - —jL ° � �\ `� A I A •.� `ems. � /�/�)��� ip � o ♦ � `. II � + ;! O" ��: � � i ii� _�,.• \_ � – -� ./� iii ii �.+� � �,..- �' � / g°:/I > ° i IAS � � '�i�,�� _ _ _ _ �-ewo.�,.���� M • �' � �«/ �_ - T4--_ \V�------ -------------------- ;-A ° 11 � + I i � ill i 1 _, •-. . x-.-,� � i�" �� �. AIRPORT PARK�� �'` I T I I i i Y' i -- i • o q � iii c= � �l 1 I %.�. Gy J� moo PTI DR.� ,/ � ^✓� _ ^� /�JE= .wo .m . F h -- ------- -- --= - T ;Ile-, � o - 1 �y ° 0 o .. °ate ovia, LN 0 d ' III j �� I . ��VII >• � : r � A 000 O - _-- - - ----- ---- ----- << . DAL'F U , 0 RD � uo " I 0 CHIMNEY ROCK RD. � � o 1� 0 � D� a� 0 D 73 4 O �y vo s � � ♦�� ♦� ♦ ' . J, eRYgN oP E FIGURE I LEGEND o 40 . ��VII >• � : r � A 000 O - _-- - - ----- ---- ----- << . DAL'F U , 0 RD � uo " I 0 CHIMNEY ROCK RD. � � o 1� 0 � D� a� 0 D 73 4 O �y vo s � � ♦�� ♦� ♦ ' . J, eRYgN oP E FIGURE I LEGEND ---- EXISTING AIRPORT PROPERTY LINE — FUTURE AIRPORT PROPERTY LINE O EXISTING AIRFIELD PAVEMENT Q d Q - EXISTING AIRFIELD BUILDING cc a cu - FUTURE AIRFIELD BUILDING/EXPANSION a FUTURE AIRFIELD PAVEMENT J - ULTIMATE AIRFIELD CAPABILITY Z Z N OEXISTING 00 d AIRPORT PROPERTY (3,940± AC.) CC ~ LAND ACQUISITION (PHASE 1 - 243± AC.) L Q N W Z w LAND ACQUISITION d (PHASE 2 - 629± AC.) LAND ACQUISITION W C (PHASE 3 - 1,404± AC.) Z a Q ABANDONED OR RELOCATEDEm PUBLIC RIGHT-OF-WAYS (231 AC.) 2000 0 2000 GRAPHIC SCALE IN FEET ^" . ��VII >• � : r � A 000 O - _-- - - ----- ---- ----- << . DAL'F U , 0 RD � uo " I 0 CHIMNEY ROCK RD. � � o 1� 0 � D� a� 0 D 73 4 O �y vo s � � ♦�� ♦� ♦ ' . J, eRYgN oP E FIGURE I ll - --- i LEGEND EXISTING AIRPORT PROPERTY LINE FUTURE AIRPORT PROPERTY LINE POTENTIAL FUTURE // °04 EXISTING AIRFIELD PAVEMENT INTERSTATTFF�73/HIGHWAY 68 INTERCHANGE EXISTING AIRFIELD BUILDING ° Q o p• ° ° \.6 --- --- �� a� FUTURE AIRFIELD BUILDING/EXPANSION a FUTURE AIRFIELD PAVEMENT Q = ------ ULTIMATE ULTIMATE AIRFIELD CAPABILITY Z Z ` ,SANT RIDGE RD ,�,,o ° II. ° o EXISTING 0 o a AIRPORT PROPERTY (3,940± AC.) LAND ACQUISITION N o Q (PHASE 1 - 243± AC.) LLJ Q o Z 73 o o o O o Q. 2000 0 2000 a ' j� I o •® GRAPHIC SCALE IN FEET � , •v '•v IIS. .,� ��� � E° : .. I]Ia ® / .\ � � .� •:✓II III \� ����: � � b�_ o ♦ ''•^,.>, I .•. .�' �` jltt, V �� gR _ I II ✓,—� / _- -- III ,� ' ••'� ..d• o � d �O •t c_ .off.° * ,/ /• . - —— -- -- r t % �•.1, !' • i dVi �, i� L -1, - AIRPORT PARKWI=IIS --_�� o ee°.` l••�•:vo °«°t �. rF —°'J OC, ,''\ 11 J V Ii�I ASO "� • .°i o�° '°� °° °,. ° ° ° �� PTI DR. �� ��� / 9 m -�. :O -t� . .-; ' .'+� •`���°• V W �P2 i ,_'"`� - - --- �I Y a � \�� �� � � � � °� ��• ° ° ...°•moo: 10 o �� ► � � � DOI��I > >.� -- -11[--- _ IIII _ << °� � � d . � I II L ■ o � � ° 1° •� O Z y\� { ' � _ � III III I o � � •/ O Oi o Z I� I f_ i - s� r - � 44"� llf �► o - i - \ 0ol Wixom - - ���� _- --- - - - -- 'L e — — DAR RD wl( 1 O u ril— J)G FIGURE 6-4 6.4.3 PROPOSED AIRPORT LAND USE PHASE 1 (0-10 YEARS Land uses to be developed within Phase 1 will be aviation -related and located immediately adjacent to the airfield. These land areas will be developed to best accommodate new airport tenants and their associated activities that may include, but would not be limited to: corporate general aviation or air cargo activities within the airport's southwest quadrant west of Runway 14/32 and along West Market Street, and aircraft manufacturing and maintenance east of Runway 5R/23L along Radar Road, Chimney Rock Road and west of Runway 5L/23R east of Bryan Boulevard. It is envisioned that land areas west of Runway 5L/23R and east of Runway 5R/23L will be developed to accommodate larger sized leased parcels. Aviation -related land uses along West Market Street are anticipated to be developed on a smaller scale, but with the built-in flexibility to accommodate a variety of facility layouts, shapes or sizes to best suit individual tenant operational and facility development needs. Land areas that do not have direct access to the airfield will be developed as demand dictates to accommodate aviation -related land uses. Aviation -related land uses within the airport's northwest quadrant will require the development of a cross -field taxiway system to provide access to the existing three -runway system. The cross -field taxiway system would traverse land areas currently occupied by the airport surveillance radar, Bryan Boulevard, the Pleasant Ridge Golf Course, multiple buildings and the future 1-73 right -of way corridor. To develop the northwest quadrant to its highest and best aviation -related use, it is recognized that realignment or removal of portions of Bryan Boulevard would be required and would most likely not occur until the 1-73 right -of way has been fully developed and in operation. The land areas immediately adjacent to the future parallel Taxiway G and the cross -field taxiway would most likely be developed first to support aviation -related activities that require direct access to the airfield. Other land uses within the northwest quadrant may also be later developed to support aviation -related activities or, by proximity, provide allied aviation support activities and services. Other land uses on the airport would be expanded to their fullest geographical extent and developed to their respective highest and best use. The general aviation land uses would be expanded west of Runway 14/32 and within the existing mid -field area. Passenger terminal expansion would include the addition of a third (south) concourse similar in design and size to those that exist today. The air cargo development area currently occupied by FedEx would be expanded southward to the safety area setback limits of the cross -field taxiway system. The aviation -related land uses located southeast of Runway 5R/23L would be developed to accommodate activities similar to those in use today (Maintenance, Repair and Overhaul (MRO) and aircraft manufacturing) and would most likely utilize larger parcels and/or leased areas. The proposed land use development that would most likely occur within Phase 1 (0-10 year period) is depicted in Figure 6-5. 6.4.4 PROPOSED AIRPORT FACILITY DEVELOPMENT PHASE 1 (0-10 YEARS Planned airfield facility improvements that may occur within Phase 1 include, but would not be limited to the following: • Extension of Runway 5R/23L and associated parallel taxiways in the northeast direction, • Construction of a high-speed exit taxiway for Runway 5R/23L, • Parallel Taxiway G along the northwest side of Runway 5L/23R, J:\Greensboro Master Plan Update\MPU REPORT\Section 06- Strategic AMP Imp\Section6.doc 6-7 Airport Master Plan Update and Strategic Long -Range Visioning Plan Piedmont Triad International Airport • A new cross -field taxiway to serve the area currently occupied by the Pleasant Ridge Golf Course, and • A new cross -field Taxiway F to provide bi-directional taxi operation immediately southwest of the FedEx complex. 6.4.5 PROPOSED LAND ACQUISITION PHASE 2 (BEYOND 10 YEARS) Phase 2 would most likely occur sometime within the 11 to 30 year timeframe and would include approximately 629+ acres comprising three geographic areas located immediately west of North Regional Road and east of NC 68; northwest of Pleasant Ridge Road; and west of Old Oak Ridge Road. The proposed Phase 2 land acquisition program is depicted in Figure 6-6. 6.4.6 PROPOSE AIRPORT LAND USE PHASE 2 (BEYOND 10 YEARS Land uses proposed to be developed within Phase 2 will be aviation -related and have direct access to the existing three -runway airfield system via the development of multiple cross -field taxiways. The highest and best use of these land uses is based upon the assumption that major changes to the local roadways system has occurred that would include: the relocation or closure of Bryan Boulevard; relocation of the airport surveillance radar; major re -grading and leveling of topographical relief features and the completion of the 1-73 corridor. It is further assumed that the Pleasant Ridge Golf Course would be closed and all other previously developed buildings and/or structures have reached or exceeded their respective useful lives and have been closed, removed or abandoned. The land areas immediately adjacent to the future parallel Taxiway G and the multiple cross -field taxiways would be developed to support aviation -related activities that require direct access to the airfield. Other land uses within the airport's northwest quadrant may also include other aviation -related development that, by proximity orfunction, provides allied aviation -related support activities and services. The proposed continued land use development that would most likely occur with the Phase 2 is depicted in Figure 6-7. 6.4.7 PROPOSED AIRPORT FACILITY DEVELOPMENT PHASE 2 (BEYOND 10 YEARS) Planned airfield facility improvements that might possibly occur within Phase 2 include, but would not be limited to the following: • Improvement to Taxiway M, • Extension of Taxiway J to the south, • Extension of Runway 14/32 and associated parallel taxiways to the southeast, and • Construction of a second cross -field taxiway connecting Runway 5L/23R to newly acquired land areas currently located northwest of Bryan Boulevard. 6.4.8 PROPOSED ULTIMATEAIRPORT LAND ACQUISITION PHASE 3 (BEYOND 30 YEARS The strategic vision for the growth of the airport over the 30- to 50 -year timeframe includes the potential development of a third widely -spaced parallel runway (having a minimum runway centerline -to -runway J:\Greensboro Master Plan Update\MPU REPORT\Section 06- Strategic AMP Imp\Section6.doc 6-8 Airport Master Plan Update and Strategic Long -Range Visioning Plan Piedmont Triad International Airport m / ----- �� LEGEND �, o —EXISTING AIRPORT PROPERTY LINE ® EXISTING AIRFIELD BUILDING POTENTIAL/FUTURE FUTURE AIRFIELD BUILDING/EXPANSION INTERSTA 7 HIGHWAY 68 � � °, °° IN ANGE / ° d AIRFIELD/RPZ TERMINAL AREA _—_" nn f�� oa ° ° TERMINAL SUPPORT/RAC RIDGE RD ° a•° Ej GENERAL AVIATION 7 c�`2, •, ° \ ' \ - PLEASANT--- —` AVIATION RELATED /\ a _ AVIATION SUPPORT RESERVED FOR FUTURE AVIATION RELATED vv®""73 v 3 �a CARGO OPERATIONS Q D ��, vv ; Ivv o�, i;.• L� INSTITUTIONAL/COMMERCIAL "C_ �� �v •°"_� .� ; d ENVIRONMENTALLY SENSITIVE/PROTECTED UNCLASSIFIED \. i _-_ \�\\�� Q�a /'/-IIr m s• _ . 2000 0 2000 0 �- - c_� \y`e •���' GRAPHIC SCALE IN FEET .s � / - ��' O- III \\ I \ \ tl e ••',�lJ•_ -------------- 73 I \ r. 20� � ---JI-.-__7YIRP�F'tTl_P.�FFtf�47AV`.-- -- ( Ii111 ,. OCO. � �� ' As+�+�,' O s•. �; ,�`rre• PO'' u � III �� � � '�� �• • . ° j P � o . e'io� � .. �P. ®� $ ,/� �'� \ �I 11 rf = l 1 QC• f , I• P .Z, , e , , • o _`f/ DR. — — m � � ',o �� i� ; . ��•�� ; � P I 1 III I II I f` _ a � �Z .; • i : s .. � • , p,.•. �L _r �/ • -� � �- I _I :' ILII II I� _ •� � eP e 1. Ll F�l ' a0 71 �• _ D - s ' '0eAV QZD 3 840 CD • • o �; ! s� ♦ ♦ ♦ ,tip °,� s ®�.' ° V♦ Z OC J W o0 r a' �0 a •- WW N 04 0= as 0 a FIGURE 6-5 0 ------- LEGEND EXISTING AIRPORT PROPERTY LINE FUTURE AIRPORT PROPERTY LINE O POTENTIALTURF EXISTING AIRFIELD PAVEMENT d e, o -� INTERSTATE -,3 HIGHWAY 68 / °4 INTERCHANGE / �° V EXISTING AIRFIELD BUILDING ca FUTURE AIRFIELD BUILDING/EXPANSION 'CI °� o �ENTIAL �- ° o �� I �0 J M �6�TURE % �— gip. RIOG --\ n FUTURE AIRFIELD PAVEMENT a = IN RCHANGE Nom/ j P PN _ ULTIMATE AIRFIELD CAPABILITY Z Z � i>.. I \\ \ — PLEASANCE=R� __ ° ° L° " �. EXISTING O 0 d AIRPORT PROPERTY (4,198± AC.) C '- L � N LAND ACQUISITION (PHASE 2 - 629± AC.) Lu ABANDONED OR RELOCATED Z �:�\- PUBLIC RIGHT-OF-WAY (105± AC.) d 73 �� �J W O Q 2000 0 2000 rI �, �` 0 r .• �a GRAPHIC SCALE IN FEET SIR= iii J L \ I/ Iii �i r' �' ©ai' •' POTENTIAL � r /"�� ', ,'i � i i OAC �AVAY � �•�; FUTUREINTERCHA w o ♦ I \ � � - � - - i LVO a h " ''�� - � �_' � . •' e �� `lR o � I � / � II I '.— 7 — i 'I I � �e.1f' •� i�if �I ,.Y V ry I I- 7<O-• __ T, I I � `-� � li ---� �� • •• a e'e,se vo , e AIRPORT PARK '' ����0 e ♦� oe ri e ' o �` • °:ate. '� �O � 09 Q° « ees ens , „•�,le � . e.' .d 9•� � � iI ° �, � PTI DR. 7 - � ao �� �� %�� ,e ��.• OG ,i e 8 s ��m - i `i �� �� e ° ° ° ��•e•• o z 0 .a — --- .0 �rx r . I I►� �� I o. - ju i DAR( _ � p..I. p� IIffIIIIIIffII OOP/ 0 �IIg 4 Q r p zl r, CHIMNEY ROCK RD. / a o � I � % • N J LV N �a 00. w R FIGURE 6-6 a m 4 I I �''x.11 / POTENTIAL t =i III III A \ 1 FUTURE \ INTERCHANGE 0 II roll II v y — — -------------------------------- IVA T h J - — -- Ills III f i I\ ,0 T _ PT DR. �J-{ - i it J H 3e �P Ll F Tig Jill ------------ 1-I11 �I, • , II �� / I v CHIMNEY ROCK RD. _R �� 011L -- o Q s \ o ° 73 • • • �• �•• mac^ '� '' S7101 � ��Q�®;� ��I(�°`4C �� � `� �• I`= �` • 0 N LEGEND — EXISTING AIRPORT PROPERTY LINE - EXISTING AIRFIELD BUILDING - FUTURE AIRFIELD BUILDING/EXPANSION AIRFIELD/RPZ TERMINAL AREA TERMINAL SUPPORT/RAC GENERAL AVIATION - AVIATION RELATED AVIATION SUPPORT CARGO ® OPERATIONS INSTITUTIONAL/COMMERCIAL ENVIRONMENTALLY SENSITIVE/PROTECTED UNCLASSIFIED 2000 0 2000 GRAPHIC SCALE IN FEET ��\ �,� gym• . � a V { '` _ •�.�.�' •,• 1 ISVi �I� a ems' �� / • �� �1 1 Oe 7 s C �, e• a®o a �t �mo-�mmi®mro�mmmr�®mm�� � r a 73 , eRygN a 0 �n W a O a FIGURE 6-7 i� POTENTIAL UTURE INTERSTATE 73/HIGHWAY 68 INTERCHANGE / ao pTENTIAL I� { FUTURE ERFHANGF' . �"�.� G 9P�� RID40 \ \ pLEP \ \ I I �''x.11 / POTENTIAL t =i III III A \ 1 FUTURE \ INTERCHANGE 0 II roll II v y — — -------------------------------- IVA T h J - — -- Ills III f i I\ ,0 T _ PT DR. �J-{ - i it J H 3e �P Ll F Tig Jill ------------ 1-I11 �I, • , II �� / I v CHIMNEY ROCK RD. _R �� 011L -- o Q s \ o ° 73 • • • �• �•• mac^ '� '' S7101 � ��Q�®;� ��I(�°`4C �� � `� �• I`= �` • 0 N LEGEND — EXISTING AIRPORT PROPERTY LINE - EXISTING AIRFIELD BUILDING - FUTURE AIRFIELD BUILDING/EXPANSION AIRFIELD/RPZ TERMINAL AREA TERMINAL SUPPORT/RAC GENERAL AVIATION - AVIATION RELATED AVIATION SUPPORT CARGO ® OPERATIONS INSTITUTIONAL/COMMERCIAL ENVIRONMENTALLY SENSITIVE/PROTECTED UNCLASSIFIED 2000 0 2000 GRAPHIC SCALE IN FEET ��\ �,� gym• . � a V { '` _ •�.�.�' •,• 1 ISVi �I� a ems' �� / • �� �1 1 Oe 7 s C �, e• a®o a �t �mo-�mmi®mro�mmmr�®mm�� � r a 73 , eRygN a 0 �n W a O a FIGURE 6-7 centerline separation of 4,300 feet) that would be constructed northwest of Runway 5L/23R. The long-range planning vision also anticipates a possible third parallel runway that would be interconnected to the existing system of three runways via multiple cross -field taxiways previously developed within Phase 2. This third runway would be developed as demand dictates. Potential operational demand for a third runway may be driven by the need for additional airfield capacity due to increased aviation activity at the airport overtime, or in response to the specific operational needs to provide an additional, yet independently -operated parallel runway. Such runway development may be based upon the need to support extensive or concentrated development of interconnected air cargo transport facilities, manufacturing systems or other aviation -related facility development envisioned as part of the Piedmont Triad Aerotropolis Plan. To accommodate the potential development of a third runway, NC 68 would be relocated to the west with an interchange at 1-73. It is estimated that land acquisition within Phase 3 may include approximately 1,400+ acres. The proposed phased airport land acquisition program is depicted in Figure 6-8. 6.4.9 PROPOSED ULTIMATEAIRPORT LAND USE PHASE 3 (BEYOND 30 YEARS Land uses proposed to be developed within Phase 3 will be aviation -related and have direct access to the proposed third parallel runway and the existing three -runway airfield system via the development of multiple cross -field taxiways. The land areas immediately adjacent to the future parallel runway and cross -field taxiways would most likely be developed first to support aviation -related activities that require direct access to the airfield. Other land uses within the northwest quadrant may also be aviation -related, or by proximity, provide allied services in direct support of other aviation -related activities and services. The proposed land use development that would most likely occur with the Phase 3 is depicted in Figure 6-9. 6.4.10 PROPOSED ULTIMATEAIRPORT FACILITY DEVELOPMENT PHASE 3 (BEYOND 30 YEARS) Planned airfield facility improvements that may occur within Phase include, but would not be limited to the following: • Construction of two additional high-speed exit taxiways for Runway 5R/23L, • Reconstruction and extension of Runway 14/32 and associated parallel taxiways to the northwest, • Extension of Runway 5L/23R and associated parallel taxiways to the southwest, • A new cross -field Taxiway from Taxiway G to land areas in the northwest quadrant, and • Construction of a third parallel runway. J:\Greensboro Master Plan Update\MPU REPORT\Section 06- Strategic AMP Imp\Section6.doc 6-9 Airport Master Plan Update and Strategic Long -Range Visioning Plan Piedmont Triad International Airport