Loading...
HomeMy WebLinkAbout20240444 Ver 1_Site Plan_20240320No Full Pond/ Lak (At AA POWNOMW V*ftr4x j Psi, A. � 9' r K o e) Pln s r a ib iWtheAt 1b1�01lit� All Loeop� won d" 3. lip rep car till to be 11a� abO th+s Full Pondl'Normol Wyk �d � Lm"On of rto rep or flU to be Ply! b*QW VII lull Po NncrrW 4. won t+fi av�y pr+�p�d �ru � !� yin 4. Lo mUo afi C'ttM such v boll�dlnA rvttm grog WWI& d etc. S. V �n or dredging below the yu11 Pond, lvarmx! W Wr U W On of � t1 coalWr FCAM:SWp hai di S. Describe the existing land use or rondition of the site at the tirne of this application (resident1w, undeveloped, etc.): 6. Describe proposed work (include discussion as to how hardening of shDreline has been avoided, or Why It is necessary): #' WIMO kletk( p /�ie .: V .. J , l 1 _ .r - i 1 t�r7l.+ A, /—..1.�— l aLs 7. Mil work be conducted from land? From water? LV $. Total anwat of Impacts below the normai pool lake level / Normal Water Level Permanent impacts (including all excavation, backf li, rip rap, retaining walls, etc.) n square feet: Temporary Impacts In square feet: 9_ Total amount of impacts above the normal pool take level / Normal Water Leal and 50feet land- wa rd Permanent impacts (lnciudirpg hack fall, excavation, rip rap, reftiningwalls, etc.) In square feet: 4'�� Temporary impacts ((temporary dearinstructlon corriW In square feet io. Please descri se the vegetation aWve the normaI pool sake revel/ Normal Water Leval and 50feet landward to be impacted (number of tiers, for Instance): 11. Signature i4c r By signing below, I, as the proyect proponent, ctrrtifir to the following: The project proponent heenefry certifies that all Information contalrwcl herein is true, accurate, and complete to the hest of +ny knowledge and belief The project proponent hereDy requests that the certifying authority review and take action on this C A 401 certification request within the applicable reasonable period of time it`s Signature" 11M MCAC r, =ii41 Date Agent's signature is valid only ifOn authort�,r im letter from the Owner fS provided. 1.2. Please approxlmate!y sketch the following information on this plan and provide db"Wtgkw f*r each item» a, All proposed vegetation clearing b. Location of rip rap or fill to be piaaad above the Full Pond/ Normal Water level eievatior, c. Location of rip rap or fill to be paced bebwtho Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc, a. Location of any excavation or dredging below the Full Pondj Normal. Water Level eievaltion "�''�� 'C'M�Jllifrt�rpiaMlwi�otr�.rr r1Ki�L0r"R1iL�MIWe� sll ti.rei orb iMwR � wa�tf'a.its,..l wswi.� � c r+.�rrr aArl�si+. M No Full Pond/ Lak (At AA POWNOMW V*ftr4x j Psi, A. � 9' r K o e) Pln s r a ib iWtheAt 1b1�01lit� All Loeop� won d" 3. lip rep car till to be 11a� abO th+s Full Pondl'Normol Wyk �d � Lm"On of rto rep or flU to be Ply! b*QW VII lull Po NncrrW 4. won t+fi av�y pr+�p�d �ru � !� yin 4. Lo mUo afi C'ttM such v boll�dlnA rvttm grog WWI& d etc. S. V �n or dredging below the yu11 Pond, lvarmx! W Wr U W On of � t1 coalWr FCAM:SWp hai di ad y iA. � WII�tFi�I�'lll d .�I y 1 An Ai f. Wr. .� � � ..,��',✓ b JAY W A A F te.�.�,I,.,t. t' r;.},,,�.;' ,.t.,,}.,,�.,.�..y.,.�.,.t.4'•, y........... ....... i... ._..... ..... 111 t u d ,j} � H}NON OIN`J mor 0 J moo' o {Y) u oDD've>• i w + ' `' `' o� N ro m � �- � o z z r o� - J- o o do 0 m i S9 SSA Z W CQ 00 0 / ¢ 5 w EXS6S }NG ft0A 264 .43 8y.£ ��N ! '- ¢ w I1J I— 00 1303 m 550-32E g�,g� �S M60_�Z % .om ` 0 C) TO CO. R0. t0' S10_32E 6A 0 - �6s6 %69.83 u 2 n J oz J i AyV} 2 o m zo z wz �� i 00 OZ'M W Z` u o ._,V E Hw-Dos It w 1Z'£8I r�f1f}x a Z I I'D � 2 -S lt} = W \ w z FS• .9 W. �� MSO_�.� ' Q j 10 U 0 9 O t-O2� w W 9 � agP ti ` _ a.,14, lv � J O � s o W M1 w 4 p O m �J � W ,-• 'd' � V3 rc M K O0o•ED 1 T I CO J m L z W + -• W N � O O ¢ m Z �• J J o Z v W o U <ON WON W <N� WOO t6N NN.-N0 -•OC o106JNI` m V C W O Z22 � N22VNi < m£ NN �(nZN Y N�ZZ m Nmm O �'Imm NO O Nmm oO00N J ZZ Vsm Jm W Jzz J 2z J z J zz z z .� z � zz J � J mm -1 2zZZ2 � ZZZ Z i.T Rat:. _ 1 P1 F N WCI- _ .�.� PARM ID: Port ftoerty Own&:. s`[V { Q!d property &,vr s of the abow noted property, do hereby sudwrize (C *DC&7 (Name of cons ng ) .. ,a a ri;pmd fabce 1 acti)rs rrece for the proCessi &nuance grad of tom= E18MIK' rO' L—Oitfi5cffdon aM " and ad stwdaxs: and speda# oxidkkm alladmd. P-MOPmtv Ow,) r'5 ry dress (if different then praQert+y aboive): r Vv'n l' a%* the above kiwmgjan submiid In thIs aWkaton k true and accurate to it* n CAT, ABA MPARAN 3'JFFEFt fyp'CtFl YlO FORM1A Project Owner: f ontrw The approval is for the purpose and design described in your application. Impacts not indicated in the application Is a vkolation of the Buffer Rule. Site specific work should be provided in the application. [i5A NCAC 02;1 .05M and LISA WAC 029 .0243(8)) Trees are not alkmed to be removed from Zane 1 of the Buffer (within 30 ft of the Bail pond eievatlor ), unless appro,M. E Xeption, these treesthat are severely undermined along the Immediate shoreline can be removed. MlnImial shaping ano saopii-rg along the immediate shoreline is aflowed. [35A NCAC 02B .0243(6)] P Rnrhing, grading in the nuffer is not allowed. Fxcessive disturbance of ground cover. j'15A NCAC 02B .0243 (6)] Lracnes, imp-tr. sous patios, impervious walkways, etc. are not allowed Inthe buffer unless spgcifecally approved by the Dtvls:or,. Trre, c "-c 11,711tatiun an slat for decks. (15A NCAC 029 M43(4) and (6)] Work to be cone uc'ted from ;and must indicate an 6LC.ss dnd indicate any trees that are to be removed. The worts corridor should be described. The approved access corridor shall be restored. Staging spoil, construction mr.arial must I)e o,itside the ouffer. [15.A NCAC 02H -0502 and 15A NCAC 02S .0243 (4), (6), (8)) 5tormwater caii�icpc ae )ipeu or channeled for direct discharge to the lake. All constructed stormwater nischaarges m aLi ce at the natural elevation and dlscharged prior to entering the buffer directed as diffuse or &; aet flow ,,; i-eroslve ,velocities to the lake. [15A NCAC 025.0243(5), (6)) r j�"lf Y,MJ hereby state that I have been informed of the Catawba Riparian Su" f.�:r=, .-AV ,1voeK conducted in the buffer, not speclficaily stated in the application and approved by the Nvisior. of Water Resources (DWR), is a violation and subject to enforcement. Due diligence wU9 be ULea arch rJ1a4 c",e'xrs rU.-don W1,11 be built within substantial compliance and intent of the 401 Water Quaiity Certification and guf"les, the approved n(s) and specification(sj, and other supporting drta�taerlals. f Date: