SW5211201_As-Built - Certification_20240319
• Post-Construction Stormwater Management Permit No. SW5211201 AS-BUILT DESIGNER'S CERTIFICATION FOR WET DETENTION POND PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1053, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormweter rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM#? Check here if this is part of a Fast-Track As-Built Package Submittal per .1044(3). Check here if the Designer did not observe the construction, but is ce ifying the project. Check here if pictures of the SCM are provided. Printed '4)(;( ,C Name Mi-tif Lt,t,a,9r - t 'PE- Signature 'U1 NC Registration Number 2MW34 Date 2-( 1`7 123 surlo,, Consultant's Mailing Address: SEAL: ,,�, C • , `` ., t ',i 'rr 40c* 13A>Zfl1 Drz. 4or7s /&L Ci .. ,<''-. �C City/State/ZIP JZ4Ltrb14 ,' c. 2?L,eb9 x- t. c . -cr : Phone Number cal- 5.5 3 6 570 ff �r.''° °` ., `` Consultant's Email address: tr►-1 1 \elec.a- hbw 03 Q n. co,n O Circle N if the as-built value differs from the Plan/permit. If N is circled, provide an explanation on page 2 ON/E = not evaluated (provide explanation on page 2) OO N/A= not applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification (MDC .1053) OAs-built ON/E ON/A A. Forebay/Depths/Fountain 1. The available Sediment storage is consistent with the Q or N approved plan and is a minimum of 6 in. . 2. Water flow over the forebay berm into the main pond 0 or N occurs at a non-erosive velocity. 3. The provided Forebay Volume is 15%-20% of the main or N pool volume. • 4. The Forebay entrance elevation is deeper than the exit or N elevation into the pond. 5. The Average Design Depth of the main pond below the Cd DY permanent pool elevation is consistent with the permitted or N value? 6. Fountain documentation is provided. Y or N 1( B. Side slopes I Banks/Vegetated Shelf 1. The width of the Vegetated Shelf is consistent with the or N approved plans and is a minimum of 6 feet. _ 2. The slope of the Vegetated Shelf is consistent with the V or N approved plans and is no steeper than 6:1. C. As-built Main Pool/Areas /Volumes / Elevations 1. The permanent pool surface area provided is consistent © or N with the permitted value. 2. The Temporary Pool Volume provided is consistent with a or N the permitted value. - Page 5 of 6 Post-Construction Stormwater Management Permit No. SW5211201 3. The permanent pool elevation is consistent with the d or •N permitted value. 4. The temporary pool elevation is consistent with the © or N permitted value. @As-built OO N/E ON/A D. Inlets 1 Outlet 1 Drawdown 1. The design volume draws down in 2-5 days. 0 or N 2. The size of the Orifice is consistent with the permitted 6 or N value. 3. A trash rack is provided on the outlet structure. or N 4. Hydrologic impacts to the receiving channel are minimized Y or N from the 1 yr 24 hr storm discharge? 5. The inlets and the outlet location are situated per the © or N approved plan and avoid short-circuiting. E. Vegetation 1. The vegetated shelf has been planted with a minimum of 3 7 or N diverse species. 2. The vegetated shelf plant density is consistent with the approved plans and is no less than 50 plants per 200 sf or or N no less than 24 inches on center. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or"N/E" below. Attach additional pages as needed: Page 6 of 6