HomeMy WebLinkAbout20081473 Ver 4 _Phase I Remediation Plan _20151120res Memo To: Katie Merritt, DWR From: Brian Hockett , RES cc: File Date: November 19, 2015 Re: Arrington Bridge Phase I — Year 1 Monitoring Per the November 3, 2015 email response from Katie Merritt (DWR) referencing the Year I monitoring report for the Arrington Bridge Phase I and Phase I Expansion Bank Parcels, RES is providing a written course of action for remediation as requested. 1. A supplemental planting plan for the 3.07 acres that were mowed and /or disked which shall include 1) a proposed deadline to complete the replanting, 2) a commitment to flag all stems that will be planted, 3) a commitment to provide post - planting pictures of the replanted areas, 4) stem count data for Plot 8 post planting. RES staff has taken immediate action to remediate the easement encroachment of 3.07 acres at the Arrington Bridge Phase I and Phase I Expansion. A supplemental planting is planned in the month of January 2016 for all encroachment areas. As requested by DWR, all supplemental tree stems planted in the encroachment areas will be flagged with marking tape. After supplemental planting activities have occurred, Vegetation Plot 8 corners will be re- established and stem count data will be reported to DWR. Photo documentation of these services will be provided. As part of RES's active preventative action, in mid - October 2015 RES planted 3- gallon container trees along the easement edge and posted additional easement marking signs. Our intentions is that planting larger trees along the boundary will help to provide a visual boundary between the agriculture fields and the conservation easement. RES has also discussed with the landowner and persons responsible for the easement encroachment to ensure it doesn't happen again. Photos of the tree plantings and additional easement signage are provided below. 2. A written course of action for remediating the encroachment problems on the site with a proposed deadline for completion. As stated above, RES plans to perform a supplemental planting at the Arrington Bridge Phase I and Phase I Expansion Sites in January 2016. All documentation of the required remediation work will be provided to DWR following the completion of the work. Additional easement markers have been posted along the boundary of the easement as well as 3- gallon container trees planted along the encroachment area borders. It should be noted that RES took action to perform this work prior to DWR's email requesting remedial work onsite. RES discussed the easement encroachment problems with the landowner /persons responsible in hopes to prevent future occurrences. 10055 Red Run Blvd. Suite 130 Owings Mills, MD 21117 412 N. 4th St. Suite 300 Baton Rouge, LA 70802 1307 Broad Street Camden, SC 29020 1514 South Church Street Suite 103 Charlotte, NC 28203 5020 Montrose Blvd. Suite 650 Houston, TX 77006 1200 Camellia Blvd. Suite 220 Lafayette, LA 70508 137 1/2 East Main Street Suite 210 Oak Hill, WV 25901 380 Southpointe Blvd. Plaza II, Suite 405 Canonsburg, PA 15317 909 Capability Drive Suite 3100 Raleigh, NC 27606 Please let me know if you have additional concerns or questions about our remedial action plan. Brian Hockett, PLS NC Operations Manager RES Planted 3- gallon container trees on Easement Boundary. Installed additional easement boundary markers along encroachment areas. Planted 3- gallon container trees on Easement Boundary. Planted 3- gallon container trees along Easement Boundary. Installed additional easement boundary markers along all borders. Installed additional easement boundary markers along encroachment areas.