Loading...
HomeMy WebLinkAbout20150954 Ver 1_More Info Received_20151118Steve Troxler North Carolina Department of Agriculture Commissioner and Consumer Services Division of Soil and Water Conservation Date: November 16, 2015 To: Karen Higgins 401 & Buffer Permitting Unit Supervisor Division of Water Resources Department of Environmental Quality From: Daphne Cartner, EI C, RE: WPCC Hunting Creek Bank Stabilization Project #15 -0954 Patricia K. Harris Director Please find enclosed three copies of the information requested by Mr. Ed Williams of the Asheville Regional Office in a letter dated October 14, 2015. Your first concern is the verifying that the rock size would be sufficient not to scour. Attached is a calculation sheet indicating the minimum size rock based on shear stress for the stream. This calculation indicates a rock size of 15.9 cu -ft. We specified an average rock of 24 cu -ft. for the Rock Structures and toe material. Your second concern was the proposed dimensions. We took a cross - section of a stable riffle just upstream of the work area to match as this is not a restoration project. The cross - sectional area in that riffle is 67 sq -ft (note the attached Regional Curve for a 7.42 sq. mile drainage area is 70.4 sq -ft). The bankfull width of the riffle is 23.5 ft. and the mean depth is 2.8 -ft. The stabilization project is primarily in a pool section and therefore these dimensions are slightly higher in the repair cross - section. Please note that though width and depth dimensions are plotted against drainage area that this data is from a variety of stream types and often does not correlate with actual dimensions of other stream types. If you have additional questions concerning the design or if you don't feel this fully addresses your concerns, please feel free to contact me directly. MAILING ADDRESS Western Peidmont Tech Services Office Division of Soil and Water Conservation PO Box 845 Mocksville, NC 27028 Telephone: 336 - 753-0076 An Equal Opportunity Employer LOCATION Long Building Suite B 314 W Water Street Mocksville, NC 27028 WPCC Hunting Creek Streambank Stabilization Rock Size Calculation Bankfull Shear Stress Calculation: Hydraulic Radius (ft) 2.60 Slope (ft/ft) 0.003 T = (lbs/ft2) 0.44 y = 0.5656Ln(x) + 2.98 Min. Rock Size = (ft) 2.517 Min. Rock Vol. (fe) 15.952 Min. Rock Weight 1754.705 (assume 1101bs/ft3) CONSTRUCTION SPECIFICATION ROCK STRUCTURES The work shall consist of the construction of natural rock or rock riprap structures including rock vanes, J -hook vanes, rock cross vanes, cross vane rock weirs, and/or step -pool structures. The work shall consist of furnishing, transporting and installing materials to construct the rock structures in accordance with the plans and specifications. Materials Individual rocks shall be dense, sound and free from cracks, seams, and other defects. The rocks shall have a specific gravity of not less than 2.5. The size and grading of the rock shall be as shown on the drawings. The dimensions of the rock shall be 4 ft long x 3 ft. wide z 2 ft. high. The dimensions may vary within +/ -1 foot. Flat rocks are preferred since they are more adapted for the intended use. The weight range of each rock should be between 1 and 3 tons. The source of rock shall be identified and approved by the Engineer prior to delivery to the site. It is anticipated that the rock will be a special order to obtain the specified sizes if the rock is to be obtained from a quarry. Subarade Preparation The subgrade surfaces on which the rock is to be placed shall be cut or filled and graded to the lines and grades shown on the drawings. When fill is required, it shall consist of approved materials that have been placed according to the Construction Specification for Earthfill. The rock shall not be placed until the prepared subgrade has been inspected and approved by the Engineer. Placement The rock shall be placed by equipment on the surfaces and to the depths specified. The footer rock shall be placed first If more than one footer rock layer is to be placed, placement shall begin with the bottom layer and proceed in sequence until all footer rock layers and the surface rock layer have been placed. A hydraulic excavator equipped with a hydraulic thumb shall accomplish placement of the rock in the structure unless othervAse approved by the Engineer. The rock shall be placed in a manner to prevent damage to structures. Hand placing will be required to the extent necessary to prevent damage to any structure. All rock structures are designed to be installed on a 20 degree angle from the channel bank toward the center of the stream. The grade, top and bottom, of the structure gradually tapers down from the channel bank toward the center of the stream. For the structure to work properly, the rock must be placed as shown on the drawings unless directed otherwise by the Engineer. NRC3 -NC Page 1 of 1 2/99 Rock Structures AWessup SPECIFICATIONS FOR CONSTRUCTION FOR WPCC HUNTING CREEK BANK STABILIZATION BURKE COUNTY, NORTH CAROLINA FILL MATERIALS AND PLACEMENT: The material placed in the fill shall be free of sod, roots, frozen soil, stones more than six (6) inches in diameter (except for rock fills), and other objectionable material. The foundation area shall be roughly shaped and compacted before the placement of any fill material. The contact surface shall be thoroughly scarified and moisture added as needed so that the first layer of fill material will be properly bonded to the foundation when compacted. The placing and spreading of fill materials shall be started at the lowest point of the foundation and the fill brought up in horizontal layers not to exceed eight (8) inches in thickness prior to compaction. The slope between the existing ground and fill to be placed shall not be steeper than 3 horizontal to 1 vertical. The bonding surface shall be treated the same as that specified for the foundation so as to insure a good bond with the new fill. The moisture content of the fill material shall be adequate for obtaining the required compaction. Material that is too wet shall be dried to meet the requirements, and material that is too dry shall have water added and be mixed until the requirement is met it is generally preferred to use material slightly wetter than optimum than dryer than optimum. Construction equipment shall be operated over all areas of each layer of fill to insure that the required compaction is obtained. A sheeps -foot roller or a mechanical roller - compactor shall be used as needed to obtain the required compaction. Fill adjacent pipe conduits shall be carefully compacted to a density equivalent to that of the surrounding fill by manually directed power tampers or plate vibrators. Fill materials compacted with manually directed power tampers or plate vibrators shall be placed in horizontal layers not to exceed four (4) inches in thickness prior to compaction. ■■ 0 N 0 7 Ir v 7 Elevation (ft) x M 4 N L-1 N x ro i N i� S Of 7 x C~ f� CL 0 0 1 C I S X -n c 3 D Q S 0 N Al v D 1 N V N O J 0 Cross - Sectional Area (sq.ft.) 1 i O i O O j O O O f� rn ° CD tU O o a) cD v to 10) CL D CL NO (D o o _ _ O� C7 . C �D j O O O Hill m N O 1 N V N O 1 L Mean Depth (ft.) i 1 1 O m V toQ Q n N O 1 O � i v cD CL O 3, •O tD 3 o o (D (� • O n C Mt �D 1 O O O m N W Y� i N N O j Discharge (cfs) -► _ O O O J' O J � 11 N cil cw O N m Hill O C ^ 1 Poo O f _■ v w CL CD M CL CD O :. �D o � O n C �D O O • m N Ul v n 1 N N O 1 O Width (ft.) 1 1 1 O 1 O O 1 p O O � II 11 V Z O is V K O c A m TI N O 1 c I (D v � tp FD Cl) -44-1..o �D 1 O O �■ O O O RIVERMORPH CROSS SECTION SUMMARY River Name: Hunting Creek Reach Name: Reach 1 Cross Section Name: Riffle? Survey Date: 11/12/2015 Cross Section Data Entry Left BM Elevation: Floodprone Elevation (ft) 0 ft Backsight Rod Reading: 0 ft TAPE FS ELEV NOTE ------------------------------------------------- 0 0 1062.18 11.66 0 1061.09 15.25 0 1061.24 24.31 0 1061.68 33.85 0 1060.87 37.27 0 1060.71 43.87 0 1058.51 47.07 0 1057.56 47.69 0 1057.26 BKF 48.23 0 1056.93 54.03 0 1053.89 59.34 0 1052.99 62.91 0 1053.39 67.06 0 1054.04 67.94 0 1055.12 68.69 0 1055.34 77.05 0 1061.84 77.96 0 1062.57 78.07 0 1062.55 84.65 0 1061.87 90.77 0 1062.38 97.94 0 1063.23 ---------------------------------------------------------------------- Cross Sectional Geometry ---------------------------------------------------------------- - - - - -- ---------------------------------------------------------------------- Entrainment calculations ---------------------------------------------------------------- - - - - -- Entrainment Formula: Rosgen.Modified shields curve channel Left Right Floodprone Elevation (ft) 1061.53 1061.53 1061.53 Bankfull Elevation (ft) 1057.26 1057.26 1057.26 Floodprone width (ft) 64.84 Bankfull width (ft) 23.47 11.73 11.74 Entrenchment Ratio 2.76 - Mean Depth (ft) 2.84 2.68 2.99 Maximum Depth (ft) 4.27 4.27 4.26 width /Depth Ratio 8.26 4.38 3.93 Bankfull Area (sq ft) 66.6 31.44 35.15 wetted Perimeter (ft) 25.66 16.91 17.28 Hydraulic Radius (ft) 2.6 1.86 2.03 Begin BKF Station 47.69 47.69 59.42 End BKF Station 71.16 59.42 71.16 ---------------------------------------------------------------------- Entrainment calculations ---------------------------------------------------------------- - - - - -- Entrainment Formula: Rosgen.Modified shields curve �. Channel Left side Right side sl ope�.�' 0 0 0 shear stress ;.(lb /sq ft) Movabl'e",'Parti tl a (mm) J• -