HomeMy WebLinkAbout20240440 Ver 1_SF-560036_Permit Drawings_20230706_20240319Highway
North Carolina Department of Transportation
Stormwater
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 3.00; Released August 2021)
FOR NCDOT PROJECTS
WBS Element: BP13.R020
TIP/Prof No: SF-560036 County(ies): Madison Page 1 of 2
General Project Information
WBS Element:
BP13.R020 ITIP Number: SF-560036 I Project Type: JBridge Replacement Date: 7/6/2023
NCDOT Contact:
Yates Allen (Divison Enviromental Officer)
Contractor / Designer:
TGS Engineers (David B. Petty, PE)
Address:
NCDOT Highway Division 13
Address:
706 Hillsborough Street
55 Orange Street
Suite 200
Asheville, NC 28801
Raleigh NC, 27603
Phone:
828-250-3002
Phone:
919-773-8887 ext. 104
Email:
vallenencdot.aov
Email:
d ett t sen ineers.com
City/Town:
Mars Hill
County(ies):
Madison
River Basin(s):
French Broad I
ICAMA County?
I No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
0.096 miles Surrounding Land Use: 1wooded, farmland, low density residential
Proposed Project
Existing Site
Project Built -Upon Area (ac.)
0.3 lac.
0.2 lac.
Typical Cross Section Description:
Two 10' paved travel lanes with 3' grassed shoulders (7' shoulders w/ guardrail, paved to
Two 9' paved travel lanes.
guardrail).
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 150 1 Year: 2024
I Existing: 1 150 Year: 2024
General Project Narrative:
NCDOT Project SF-560036 involves the replacement of Structure 560036 over Middle Fork Creek on SR 1515 (Buckner Branch Road) in Madison County, NC northeast of Mars
(Description of Minimization of Water
Hill. The subject crossing involves the replacement of an existing 35' long by 21' wide (timber deck on steel I -beams) single -span bridge with a proposed 55' long by 30' wide,
Quality Impacts)
21" Cored Slab single -span bridge. The proposed grade will be about 1-1.5' above existing grade within the vicinity of the bridge and roughly matching existing grade
approximately 175 ft west and 240 ft east of the bridge. The existing bridge has vertical abutments extending within the footprint of Middle Fork Creek which are proposed to be
removed. Abutments of the proposed bridge are located completely outside the streambanks.
The existing bridge has openings in the bridge rail so runoff discharges directly into Middle Fork Creek. The proposed bridge will have no direct discharge into the creek.
Stormwater runoff is to flow to the northwest and northeast quadrants of the bridge where it will sheet flow over the paved shoulders away from the bridge. It will then be diffused
by the grassed shoulder and bridge rip rap before reaching the stream. All proposed stormwater runoff is discharged as far away from the stream and at the lowest velocities as
practicable.
The NCDOT Mitigation Site Boundary shown in the northeast quadrant of this project is a preservation site associated with past NCDOT project R-2518A. The site is identified
as R-2518A Middle Fork Creek Site K. The current project proposes to avoid this preservation site completely.
A channel change is proposed in the southwest quadrant to realign a portion of stream SA. All impacts on the project have been minimized to the maximum extent practical.
"Note that Middle Fork Creek is also known as Middle Fork Little Ivy Creek (NCDEQ) and Middle Fork California Creek (FEMA). Middle Fork Creek is stream name per NCDOT
structure inventory.
Highway North Carolina Department of Transportation
5tarmwate r
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
(Version 3.00; Released August 2021) FOR NCDOT PROJECTS
WBS Element: BP13.R020 TIP/Prof No.: SF-560036 County(ies): Madison Page 2 of 2
General Project Information
Waterbody Information
Surface Water Body (1): Middle Fork Creek (aka Middle Fork Little Ivy Creek)
NCDWR Stream Index No.:
6-96-10-1
NCDWR Surface Water Classification for Water Body
Primary Classification:
Water Supply II (WS-II)
None
Supplemental Classification:
High Quality Waters (HQW)
None
Other Stream Classification:
None
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body?
iYes
Deck Drains Discharge Over Buffer? INo
Dissipator Pads Provided in Buffer? INo
Deck Drains Discharge Over Water Body?
INo
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
Surface Water Body (2): 1
NCDWR Stream Index No.:
NCDWR Surface Water Classification for Water Body
Primary Classification:
Supplemental Classification:
Other Stream Classification:
Impairments:
Aquatic T&E Species?
Comments:
NRTR Stream ID:
Buffer Rules in Effect:
Project Includes Bridge Spanning Water Body?
Deck Drains Discharge Over Buffer?
Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
Surface Water Body (3): 1
NCDWR Stream Index No.:
NCDWR Surface Water Classification for Water Body
Primary Classification:
Supplemental Classification:
Other Stream Classification:
Impairments:
Aquatic T&E Species?
Comments:
NRTR Stream ID:
Buffer Rules in Effect:
Project Includes Bridge Spanning Water Body?
Deck Drains Discharge Over Buffer?
Dissipator Pads Provided in Buffer?
Deck Drains Discharge Over Water Body?
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
W
0
c
E
L
a
co
0
0
0
C
0
0
0
0
No
00
No
�z
max_
STATE OF NORTH CAROLINA
DIVISION C HIGHWAYS
MADISON COUNTY
81'AT¢
STAR PROlPCI' R¢FPR¢NLR NQ
SHE TS
N,
BP13.R020
wT6 P¢OI.N0.
F.w.P¢AI.1-
—R1PT14N
BP13.R020.1
WA
PE
BP13.R020.2
WA
W & UTIL.
BP13.R020.3
WA
CONST.
LOCATION: BRIDGE #560036 OVER MIDDLE FORK CREEK
ON SR 1515 (BUCKNER BRANCH RD.)
PERMIT DRAWING
TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE SHEET 1 OF 5 'moo
cdp
WETLAND AND SURFACE WATER IMPACTS PERMIT
BEGIN BRIDGE o
1`1R Ftia —L— STA. 12 + 93.09 �� -.�
**
SR 4
is I w
7
�
FOR=
—L— STA. 11 + 2 0.00 vo
BEGIN PROJECT ��
B P13 . R02 0 SITE 1 % —L— STA. 16 + 2 5.00
END BRIDGE `,., END PROJECT
—L— STA. 13 + 5 0.4 7 B P13 . R02 0
DESIGN EXCEPTION REQUIRED FOR DESIGN SPEED
CLEARING ON THIS PROJECT SHALL BE PERFORMED
TO THE LIMITS ESTABLISHED BY METHOD II.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES
DESIGN DATA
PROJECT LENGTH
NCDOT CONTACT. • EDDIE
DOUGLAS
HYDRAULICS ENGINEER
PLANS PREPARED BY:
PLANS PREPARED FOR:
20 10 0 20 40
ADT 2024 = 150'JIGS
T — 6O/o *
V = 20 MPH
LENGTH ROADWAY PROJECT #BP13.R020 =0.085 MILES
LENGTH STRUCTURE PROJECT #BP13.R020 =0.011 MILES
Ron
®'
�$
TGS ENGINEERS
201 W. WARREN ST,
ENGINEERS SHELBY. NC 28150
PH I7041 416-0003
FfdCORP- LICENSE NO., C-0275
NORTH CAROLINA DEPARTMENT
OF TRANSPORATION
DIVISION 13
20 OLD 74
A6hGV111p. NC 288013
il�
PLANS
20 l0 0 20 40
* TTST =3% DUAL =3%
FUNC CLASS =
P.E.
slcnnTURE:9
m
�� a
�
TOTAL LENGTH PROJECT #BP13.R020 =0.096 MILES
RIGHT OF WAY DATE:
OCTOBER 31, 2023
JIMMY L. TERRY, PE
ROADWAY DESIGN
ENGINEER
PROJECT ENGINEER
PROFILE (HORIZONTAL)
LOCAL, RURAL
®�
4 2 0 4 8
LETTING DATE:
AUSTIN R. TURNER, PE
TW�N�Q®��
SUB -REGIONAL TIER
OCTOBER 15, 2025
PROJECT DESIGN ENGINEER
P.E.
SIGNAT6REr
PROFILE (VERTICAL)
2018 STANDARD SPECIFICATIONS
°
-L- CURVE DATA
PI Sto 10+64.47
PISto 13+35.67
Pl Sto 15+42.73
A = 5' 55' 415' (LT)
A = 41' 52' 08-':r QT)
A = 1P 27' 4/.6' (RT)
D = 4 36' 075'
D = 22 55' 05.9'
D = 8' 29' 17.7'
L = 126.82'
L = 162.69'
L = 135.03'
T = 64.47'
T = 95.64'
T = 67.74'
R = 1.245.00'
R = 250A0'
R = 675.00'
SE = 0.04
SE = 0.03
DS = 30 MPH
DS = 25 MPH
O
BEGIN PROJECT BP13.R020 KRISTED13 576 PG 59RRETT
-L- STA 11 + 20.00
-
\ -L PT I/
PA.O F,y o\
O \ \\ E
w \\\
Js
ce \\\ ory
TEMPORARY
STREAM IMPACT A°F
BANK STABILIZATION /
CLASS I RIP RAP
SEE DETAIL 4C
7 TONS, NO GEO
PERMANENT
STREAM IMPACT
o
6
o
c�
0
O
SHELBY STUART BUCKNER \
JEFFREY DWAYNE BUCKNER
DB 464 PG 681
NCDOT MITIGATION
BEGIN BRIDGE (DO NOOT UNDADISTURB)
-L- STA 12 + 93.09
PROP. 16' ASPHALT DRIVE
(2- S9.5B, 6- ABC)
BRASS
_E —L— PC 12+4003
E xlsi� R,p
15 15„
_ s
�\ R=1
TEMPORARY
STREAM IMPACT
PROP. EXCAVATION
TO ELEV 2300.3' (TYP.)
(STRUCTURES ITEM)
BANK STABILIZATION
CLASS II RIP RAP
12 TONS, NO GEO
GRASS (24-IN. THICK, KEYED -IN)
Cb
CL
f
MADISOI COUNTY
PERMIT DRAWING BRIDGE #560036
SHEET 2 OF 5
ct�
2a :�
DO NOT DISTURB
WETLAND WA
DO NOT DISTURB
STREAM SB
NCDOT MITIGATION
SITE BOUNDARY
REM. EXIST. STwG RiW (DO NOT DISTURB)
SECONDARY
BRIDGE o BM"1 GROWTH
PERWNENT
'PE -III SC
R=90' !
/ PDE —
CHANNEL
CHANGE
SEE DETAIL 4A
BANK STABILIZATION
EST. DDE=
100 CY
CLASS I RIP RAP
SEE DETAIL 4C
6 TONS, NO GEO
OPERMANENT
STREAM IMPACT
JEFFREY
DWAYNE BUCKK
DB 422 PG 619
TEMPORARY
STREAM IMPACT
DETAIL 4A
CHANNEL CHANGE
I Not t Scale)
f Gro-..undd Proposed
FiII51.pe Natu.al
Ground
Exist. Channel J
B
m. o=].I Fr.
Type of Liner=No liner n=3o Fr. eur�o^S�orne,w;�e ,now
FROM -L- STA. 11+82 TO STA. 12+94 RT
N
mPT 16+10
\
� WA
�
1
i
11 h
MITIGATION AREA
1
(WETLAND CONSERVATION)
SECONDARY�
GROWT��.
G A ',•
_-- J
F
�15
•
•-•-•---• _ SA.__..__.
1122
5'HOPE
/V
PROJECT REFERENCE NO.
SHEET NO.
BPl3.R020
4
RN/ SHEET NO.
ROADWAY DESIGN
HYDRAULICS
ENGINEER
ENGINEER
INCOMPLEIrE PLANS
DO NOT — FOR d W ACOU-TION
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GSTGS
ENGINEERS
201 W. MARION ST
SHELBY, (70 4 - 150
PH (704) 76o 00
CORP. LICENSE NO: C-
.: C-0275
I o
A
STREAM IMPACT
/ �•• y
-L- PT
_ ��,y,s
-- /
5/M
(�
142.72
—
----_F
�.e
�\
l51S _✓� / /
sJ� %/
•
R BRANCH RD. i9"DST� —.
BOGK11 ��� _— F
1s
/� DLE
L MID
CREEK
C
FORK . • / n
o
F__
wwww
/
j=�
BST GREU
.. _
o
F i� /
_ HI2p F --- F
REMOVE POLE p
F
SE
GROWTH Y
TYPE -III SCE
R=90'
---
I
J11 1 i ._ PDE
GRASS
GREY LATERAL 'V' DITCI
SEE DETAIL 4B
EST. DDE=35 CY
TEMPORARY
PpE STREAM
IMPACT
PERMANENT
STREAM IMPACT
9q,
-L- PC 14+74.99 ro
PROP. 8'
ASPHALT DRIVE
(2- S9.513, 6- ABC)
END BRIDGE O
-L- STA 13 + 50.47 JEFFREY DWAYNE BUCKNER
DB 422 PG 619
m CLASS II RIPRAP (TYP.)
\ (STRUCTURES ITEM)
\�
Sf TEMPORARY
STREAM IMPACT
m\
s s SURFACE WATER
s IMPACTS
TEMPORARY SURFACE
WATER IMPACTS
Y t
�
r\
\ \
hA
-
�6�
\
END PROJECT BP13.R020
-L- STA 16 + 25.00
•••• SA•••• NCDOT MITIGATION
SITE BOUNDARY
40' 0' 40'
GRAPHIC SCALE
DETAIL 4B DETAIL 4C
LATERAL 'V' DITCH BANK STABILIZATION
1Nott' Sc.1e1
slo)Nor ro scoleJ
'� I Natural 18"
fill ,hr 2� ti� Ground
p D
MinD=1 Ft. chonal eotto nie
b=2 Ft. umil rsefnsol
Type of Liner- CL I RIp-Rop, Key.d ,
FROM -L- STA. 13+30 TO STA. 15+14 RT
FROM-L-STA.11+82 TO STA. 11+98 RT FOR -L- PROFILE SEE SHEET 5
AND -L- STA. 12+88 TO STA. 13+01 RT
° -L- CURVE DATA PROJECT REFERENCE NO. SHEET NO.
MADISOI COUNTY BP13.R020 4
Pl Sto 10+64.47 Pl Sto 13+35.67 Pl Sto 15+42.73 BRIDGE 4560036 RW SHEET NO.
� = 5'55'415-QTJ A= 4P52'08-WQTJ A= 1P27'41L-(RT) PERMIT DRAWING
ROADWAY DESIGN HYDRAULICS
D = 4 36' 075' D = 22 55' 05.9' D = 8' 29' 17.7' ENGINEER ENGINEER
L = 164A7'' � L = 18259 L = 167.74' SHEET 3 O F 5 ����. IT =69.4T IT=95 T=67.74'
IR 5 OR 6750R 124500AINCOMPLE E PUNS
ISE = SE = 0A3 mD NOT \ \
PS = 30 #PH DS = 25 MPH P usE roll dw A�ovlslTlo
DOCUMENT NOT
\I II 11111\ I CONSIDERED
TEMPORARY UNLESS ALL SIGNATURES COMPLETED
v � 1 1 v � j l i �vvIII I1 \\ 1\ \, I �
/ STREAM IMPACT V I A V A A \ \ \ \ C,TQS
1 6" 20 W. NA, R onlR sT
SHELBY, NC 2s1511
PH (704) 476-0003
P. LICENSE No._ C-0275
p q p (J�� \ PROP. EXCAVATION,,A AV D T NOV�TU,RB-8EG19 PROJECT BP13.R620 ,/ KRISTEDBM576 PC 59RRETT TOELEV 2300.3'ITYRI A1�/'NP
/ (STRUCTURES ITEM) V\ 11V
STA 11 + 20.00,,— / BANK STABILIZATIOANJSB-
\ \ \ \�VV I )A \ \ \ 111 A
CLASS II RIP RAP \\ I \\\ \ I \ - - - \
NCDOT MITIGATION 12 TONS, NO GEO A \\ \� V AVA g WA--
�k SITE BOUNDARY (24-IN. THICK, KEYED-14) / \\ V Al
k BiGIN BRIDGE (DO NOT DISTURB) �) ) ,IIII IIII �11
L— STk 12 + 93.09 // �, _:IIII
i i I 1
k / - DO NOI\\ �I IA�STREAM IIIIIIAMITIGATION AREAA AA \ \ IIIDOT MITIGATION \ I AETLAND CONSERVATIONIE BOUNDARY /_/ / / / ( 1 V -L- POT /6+7437
\ / / KISTwG RiM
(DO NOT DISTURB)/ / IIII CRow�H ; _ _ _ - I�
seW REM. E�IST. SECONDARY / / :- ' V 1
/ -L - PT 1028.62 \ x �, \ , / _2
\ - -$RI E 9M"1 GROW r+- / i) �) L . _ A i / / /F
/ PROP. 16' ASPHALT DRIVE \ k I PERIIINENT /�1 swpFE \ SA�, � A\
(2„ s9.sB, 6" asc)STREAM IMPACT
C
14+z2.72 j
- r -L- PC 12+40,03
_ � 1 � 8� KN BRANC1Q��g
\pMIDDLE FORK D.EEK'�
�`�� �_ �^'�FR s � � � _ � f A _�_ _ � "� � i _, rL_ _ •�R _ � — � F \�
REM VE LE
R=15' / \ Q \D\\ \ \ \ \ \ \\
Q \ I V ��'
Iv� ASVRa"VwrAa\
e V V VAAVAVVA \\1A 1VAVAA V AAVSV AA� V A�
�v MPORARY
v I\ I TREAM IMPACT
i r V A\ VA A VA
o
TVRE-msc--- 1i2 GRASS �\`. \V AAvAV 1IA)111111 \
V A � R=90' rvrE-Ills GR�u LATERAL 'V' DITCH
L \ / \ v� R=90, -- ��� i/ SEE DETAIL 4B -L- PC 14+7499
( ��a / �� EST. DDE�35 Cy
V A
SEE DETAIL 4C �TEMPORARY
I R � v \ PROP
roNs,, ceo ASHA. �Lr
(2S9.5B� D`6R
\ STREAM lvAAfs Cl�I (IA / Iiv l
vA v V v A
v
v vvv v
1\\ v\\ 1 \ I dass v�\/� pDE IMPACT
/vvv vvvv \ \ v
\ v I STREAM IMPACT PDE
w I v 1111 v / PERMANENT fND FIR
1 I CHANNEL III / STREAM IMPACT � � vv
=L
1 CHANGE I I \ / O � STA �16 ' \ \\1 \ \
SEE DETAIL 4A1 BANK STABILIZATION �'✓ I�I V 1 END BRIDGE \ 2 V A
EST. DDE= \ CLASS I RIP RAP V IV I A I V A \
JEFFREY DWAYNE BUCKNER
\ I I 1 1 I I 100 CY \ SEE DETAIL 4C I hJ I I V —L— STA 13 + 0.4�V
6 TONS, NO GEO DB 422 PG 619
\ �� A I I � � � � A
\ PERMANENT j III CL4,SS fIRIPRAP (TYP.)
N YSTUART STREAM IMPACT I III 1 A l (srRucr�xREs ITEM)
S ELB 5 UART BUCKNE� / / JEFFREY DWAYNE BUCKK II II A III A V A S 5 SA"" NCDOT MITIGATION
/ \ v I SURFACE WATER
c JEFFREY DWAYNE BUCKNER \ DB 4221PG 619 ��VAA� 1 11 ) LC_L-L_CCJ IMPACTS SITE BOUNDARY
o DB 484 PG 681 TEMPORARYv
I vv v v \ \I I TREAM IMP,�6T
/ TEMPORARY I v��� v v v I 40' 0' 40'
1 ���� v /vvv TEMPORARY SURFACE
/ STREAM IMPACT I v v v vvvv �v 1 WATER IMPACTS
II 11I7IIG; ��vvv vvv/v�v�v II GRAPHIC SCALE
0
0
ci
C
O
O
O
O
U —
Z
.. FROM —L— STA. 11+82 TO STA. 12+94 RT
v I �v�J=-
I 111 L J \\\\ DETAIL 4B DETAIL 4C
1 \�- LATERAL'V' DITCH BANK STABILIZATION
INotto Scu1e1 INor to S-1e1
'�
Fill ,hr
slop
Natural
2� � 1� Ground
D
18"
Min.D=1 Ft.
ueotto nio
b=2 Ft.
u.tmil
il 2efuzol
FROM —L— STA. 13+30
TO STA. 15+14 RT
Type of Liner— CL I RI F,p, K y.d ,
FROM—L— STA. 11+82 TO STA. 11+98 RT FOR -L- PROFILE SEE SHEET 5
AND —L— STA. 12+88 TO STA. 13+G1 RT
WETLAND AND SURFACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Stream
Name
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 13+14 to 13+29 LT & RT / -L- 13+43 to 13+95 LT
Bank Stabilization
Middle Fork Creek
< 0.01
< 0.01
61
32
1
-L- 11 +72 to 12+94 RT
Channel Change
SA
< 0.01
< 0.01
124
10
1
-L- 12+94 to 13+08 RT
Bank Stabilization
SA
< 0.01
< 0.01
10
10
TOTALS:
i
j 0.02
j < 0.01
j 195
j 52
0
*Rounded totals are sum of actual impacts
NOTES
1. UT to Middle Fork Creek (SB) and Wetland WA have no impacts.
2. Note that Middle Fork Creek is also known as Middle Fork Little Ivy Creek (NCDEQ) and Middle Fork California Creek (FEMA).
2018 Feb