HomeMy WebLinkAbout20160279 Ver 3_Monitoring Report Review_20240311 (2)Baker, Caroline D
From: Philip May <philm@inverenv.com>
Sent: Monday, March 11, 2024 7:23 AM
To: lauraj.meyer@usace.army.mil; Homewood, Sue
Cc: Mike Brinchek
Subject: [External] SAW-2014-01568/DWR No 20160279v3 - GFL High Point Stream
Stabilization Monitoring
Attachments: GLFHP_MonitoringResults_Feb2024_030824 (small).pdf
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Laura & Sue
Please see attached memo summarizing the results of the February 2024 monitoring of the Sediment Basin 8
stream stabilization efforts at the GFL High Point Landfill. As noted there has been some minor erosion of the bank
likely caused by concentration of flows at the right bank below a natural grade control which resulted in dislodging
a coir fiber roll. We are proposing to replace and increase the coir fiber stabilization upstream to that point. The
work would be completed within the next 90 days as soon as a contractor is mobilized to the site. Let us know if
you have any questions or concerns.
Thanks
Phil
Philip May
Senior Consultant/Managing Member
IlTf-�'1
Inver Environmental Consulting, LLC
102 West V St, Suite 1000
Winston-Salem, NC 27101
Mobile (919) 606-1065
www.inverenv.com
1