\ t t t t t\ t t t t
x,�o + + \+ FES 50 \+ \ 4- + + + +
IF +
` L + + + +
—� + + --
36 360` �— \ \ + f�/
I \
UTB
J /17 � / /
4 RAU OA
\ I + d 1 ILTEFR STRIP
1
361 0NCRETE LEVEL _
,370
364 365 — — \ / / CHAIN LINK__ / ! Q
I 1 /� �� 1 365 364 EEP / i ✓ 26
DEL CB 5
— ,
-
\ \ 1 375
A�DRAIN TYPrCAL — 'J F
/
9BMAL /
/ //
/
FLOW TO LEVEL SPREADER
1/4" OPENING GALVANIZED WIRE MESH
STAINLESS STEEL PIPE CLAMP
a-
o-
w
_J
l�
M
LEVEL SPREADER
DISCHARGE SCREEN
COMBINED LEVEL SPREADER, BYPASS,
AND FILTER STRIP
LEVEL SPREADER FILTER STRIP CONSTRUCTION SEQUENCE
1) Grade the site to the design slope using a box blade or similar
equipment. Care should be token to avoid driving heavy equipment through the
Engineered Filter Strip to prevent compaction. After the Filter Strip is
graded, then proceed with constructing the blind swale and level spreader.
2) Construct the blind swale and level spreader.
The LS should be constructed on undisturbed soil whenever possible. If the use of fill is unavoidable,
compact the soil to 95% of standard proctor test prior to construction. Level spender should be
check at 4 ft encrements to ensure level construction.
3) install underdrain per plan
4) place soil around level spreader to achieve final grade and install sod.
5) install forebay if shown.
6) filter strip soil must be left loose. Rake soil to loosen soil to a depth of 6" below top soil and sod.
7) install top soil and incorporate lime and fertilizer using rototiller or simulor method.
8) Before planting, water the area to enhance settling. Fill areas that settle
unevenly to avoid standing water.
9) Follow these steps to install the sod in on Engineered Filter Strip (NCSU Cooperative Extension Service 2008):
a. Make sure the soil is moist (but not overly wet) before toying sod. Irrigating the
soil several days before delivery is often adequate.
b. Install the sod within 24 hours of delivery. Plan to unstack and unroll the sod if it cannot be laid within
48 hours.
c. While installing, keep sod in the shade to lessen the chance of heat buildup.
d. Start sodding from a straight edge (driveway or sidewalk), and butt strips
together, staggering them in a bricklike pattern (See Figure 5).
e. Avoid stretching sod. Use a knife or sharp spode for trimming to fit irregularly
shaped areas.
RETAINING
Ir_ WALL FE
s
1� \\
1/2"X4" WEDGE OR EPDXY T%A/n Ulkirrc %eiri nrn Tn Di ATE' 1/2"X 4" WEDGE OR EPDXY
J/
13"0 CLASS 1 STONE /22" THICKNESS
Ll -1-
- 1II- 1II- 1II ='' I FILTER FABRIC PROPOSED
LENGTH 10' GRADE
SPILLWAY FRONT VIEW
PRIMARY
EMERGENCY SPILLWAY
SPILLWAY TOP DAM
SEE DETAIL it 1 /F
EMBANKMENT FILL TO BE
COMPACTED TO 95% STANDARD
PROCTOR PER ASTM D -698
INV OUT
\ FES
RIP RAP DISSIPATER
AT OUTLET UNDERLAY
WITH MIRAFI 600
SEE EROSION CONTROL
SHEET FOR DIMENSIONS
6" GATE
NOTE:
DIMENSIONS
ARE INSIDE
DIMENSIONS
MANHOLE STEPS
GROUT INSIDE OF STRUCTURE
AT ALL OPENING
WITH NON SHRINK GROUT
REBAR TRASH RACK NOTES:
1. ALL REBAR TO BE #4 REBAI
2. ALL REBAR AND ANGLES T,
BE HOT DIP GALVANIZED
PER ASTM A153.
3. WATER STOP PER
WATER STOP -RX
OR EQUIVALENT.
f. Lay sod lengthwise across the face of slopes, and peg or stake the pieces to
prevent slippage. 1/2 WIDTH TOP VIEW TRASH RACK DETAIL
g. After the sod has been placed, roll the lawn to ensure good sod -to -soil contact.
Then begin watering. FILTER STRIP FERTILIZER GUIDELINES
Apply the following for grosses other than FILTER STRIP SOD GUIDELINES
centipede-: Region Appropriate Grasses
LA •75 Ibs of ground limestone per 1,000 sq ft. Mountains Blue Gross, Tall Fescue
3' #57 STONE •A starter type fertilizer (one that is high in
3' BLIND SWALE Piedmont Toll Fescue, Common Bermuda
II 1 3" THK 30' LEVEL SPREADER -I phosphorus) based on the type of grass and Coastal Plain Centipede, Common Bermuda
the planting method. Fertilizer bogs hove a
9 three – number system indicating the primary
6" / / Sod is to be grown in non - clayey soils or washed sod.
nutrients, such as 8 -8 -8 or 5- 10 -10. These
numbers denote the N -P -K ratio —the Sod is to be watered twice per week for the first three
percentage of each nutrient in a fertilizer. The weeks after construction.
percentages are noted in the following order: The total sod toyer should be kep moist during
N Nitrogen for green color and growth. the first three weeks.
' SOD P205 Phosphorus for good rooting.
2' 6" TOP SOIL K20 Potassium to enhance pest and
SOD environmental stress tolerance.
6" LOOSE SOIL Common examples of starter fertilizers required
6" TOP SOIL (LOOSE) FILTER FABRIC for a 1,000 sq ft area include 40 Ibs of 5- 10 -10, 20
Ibs of 10- 20 -20, or 16 Ibs of 18 -24 -6. For sandy
soils, typical to the Coastal Plain and Sondhills,
*PERFORATED UNDER BLIND SWALE ONLY, fertilizer rates should be increased by 20 percent.
SLOPE TO DAYLIGHT AS SHOWN ON PLAN
STANDARD LEVEL SPREADER (CROSS SECTION A -A) • For centipede gross, apply lb of nitrogen per 1,000 square feet. Too much fertilizer will kill centipede.
C.
Designer
Scale
Drawn By
Date
6/11/2015
Checked By
Job No.
ASHBOURNE SUBDIVISION
Cary Wake County
North Carolina
3
1
ANTI -SEEP COLLAR
PER
DETAIL
3
�1
PER PLAN
TOP VIEW
CONCRETE COLLAR
FRONT ELEVATION
CONCRETE
. COLLAR
$„ 12„
v
. �. . . 4
12"
a a
KE A
�i
ORIFICE
POND DAM & RISER
WETPOND
WQ VOLUME
25,640 CUFT
;EMBLY
DRAWDOWN ORIFICE
FACING MICRO POOL
P
FOREBAY DRAIN
SEE DETAIL
4" OF TOPSOIL (MIN.)
AQUATIC SHELF
TO BE PLANTED
MICRO
POOL FOREBAY
EL. PER PLAN
GALVANIZED GUIDE SUPPORT
WITH TWO ANCHORS
PRECAST CONCRETE
JOINTS SEALED
AND FASTENED TOGETHER
VALVE ACTIVATOR STEM
OUTFALL TO RIP
RAP DISSIPATOR
(SEE PLAN VIEW
FOR ORIENTATION)
TOP RISER EL. 363.10'
3" DIA INV. 362.3
DRAW DOWN ORIFICE
NORMAL POOL (NP)
4" DIA INV EL. 361.0
OUTFALL TO LEVEL SPREADER WITH
RESTRICTION PLATE
(SEE PLAN VIEW FOR ORIENTATION)
OUTFALL EL. INV 359.6 s^
6" GATE VALVE 1 RISER BTM EL. 359.3'
4" KEYW Q
GROUT AROUND KEYWAY v PND BTM EL. 358.0'
WITH NON SHRINK GROUT • • 4 . . . . Q . .p. . . . . . . 2'
d a
#4 BARS 8" OC BOTH p
TRANSVERSE AND LONGITUDINAL p
ELEVATION VIEW
CMU WALL PER
RISER SECTION
4 -1/2" RODS EPDXY TO
BLOCK BENT AND
TIED TO REBAR
WATER STOP
OUTFACE PIPES)
#4 REBAR
GROUT AROUND
CONNECTIONS AND PIPE
WITH NON SHRINK GROUT
WEIR TOP
VARIES SEE PLAN
v
d 2.
v
ELEVATION VIEW
PIPE OUTFALL WALL
ALVANIZED
Outflow(cfs) Elevotion(ft)
Q
2 -year
5.21
363.22
Q
5 -year
20.8
363.6
Q
10 -year
29.4
364.0
Q
25 -yeor
40.7
364.4
Q
100 -yeor
59.8
364.8
DRAWDOWN ORIFICE
FACING MICRO POOL
P
FOREBAY DRAIN
SEE DETAIL
4" OF TOPSOIL (MIN.)
AQUATIC SHELF
TO BE PLANTED
MICRO
POOL FOREBAY
EL. PER PLAN
GALVANIZED GUIDE SUPPORT
WITH TWO ANCHORS
PRECAST CONCRETE
JOINTS SEALED
AND FASTENED TOGETHER
VALVE ACTIVATOR STEM
OUTFALL TO RIP
RAP DISSIPATOR
(SEE PLAN VIEW
FOR ORIENTATION)
TOP RISER EL. 363.10'
3" DIA INV. 362.3
DRAW DOWN ORIFICE
NORMAL POOL (NP)
4" DIA INV EL. 361.0
OUTFALL TO LEVEL SPREADER WITH
RESTRICTION PLATE
(SEE PLAN VIEW FOR ORIENTATION)
OUTFALL EL. INV 359.6 s^
6" GATE VALVE 1 RISER BTM EL. 359.3'
4" KEYW Q
GROUT AROUND KEYWAY v PND BTM EL. 358.0'
WITH NON SHRINK GROUT • • 4 . . . . Q . .p. . . . . . . 2'
d a
#4 BARS 8" OC BOTH p
TRANSVERSE AND LONGITUDINAL p
ELEVATION VIEW
CMU WALL PER
RISER SECTION
4 -1/2" RODS EPDXY TO
BLOCK BENT AND
TIED TO REBAR
WATER STOP
OUTFACE PIPES)
#4 REBAR
GROUT AROUND
CONNECTIONS AND PIPE
WITH NON SHRINK GROUT
WEIR TOP
VARIES SEE PLAN
v
d 2.
v
ELEVATION VIEW
PIPE OUTFALL WALL
BMP -1 WETPOND
DETAIL A
6" PVC
SCREW PLUG
AT SECONDARY
ORIFICE ELEV.
8..
4" PVC CAP WITH HOLED
HOLE SIZE 2.5"
6" PVC STUBBE INTO BOX
6" GATE VAL
GATE VALVE DRAIN
TRASH RACK
SPACING
RE MESH
0 -RING GASKET PER
ASTM C433
SEALANT BANDING PER
ASTM C877 TYPE 1
EXTERNAL WRAP AT RCP OUTFALL
AT JOINT (N.T.S.)
1' MIN.
T 1' MIN
v
1.5' h I -WATER OP
BMP SIDE
° I CONCRETE ANTI -
SEEP COLLAR
ANTI -SEEP COLLAR CONCRETE /DIP PIPE
AT JOINT N.T.S.
ALVANIZED
PRELIMINARY —
NORMAL POOL (NP)
\ \�
2- i "GALV WEDGE
"�I
NOT FOR
6" BELOW NP
CONSTRUCTION
�,•.e �6/11/15� :�-
WITH
^/E P♦
2-1/2" SLOTS g"
'
�
12" BELOW NP
4" OUTFALL
':
r
o
•
oo #57
00
o0 o STONE \/�
0 ROT T 0
FOREBAY
6" PVC
6" PERFORATED PVC
FOREBAY DRAIN DETAIL
BMP -1 WETPOND
DETAIL A
6" PVC
SCREW PLUG
AT SECONDARY
ORIFICE ELEV.
8..
4" PVC CAP WITH HOLED
HOLE SIZE 2.5"
6" PVC STUBBE INTO BOX
6" GATE VAL
GATE VALVE DRAIN
TRASH RACK
SPACING
RE MESH
0 -RING GASKET PER
ASTM C433
SEALANT BANDING PER
ASTM C877 TYPE 1
EXTERNAL WRAP AT RCP OUTFALL
AT JOINT (N.T.S.)
1' MIN.
T 1' MIN
v
1.5' h I -WATER OP
BMP SIDE
° I CONCRETE ANTI -
SEEP COLLAR
ANTI -SEEP COLLAR CONCRETE /DIP PIPE
AT JOINT N.T.S.
ALVANIZED
PRELIMINARY —
" THK PLATE
2- i "GALV WEDGE
"�I
NOT FOR
ANCHORS 110
CONSTRUCTION
�,•.e �6/11/15� :�-
WITH
^/E P♦
2-1/2" SLOTS g"
�
2..
4" OUTFALL
r
OUTFALL TO LEVEL SPREADER
FLOW RESTRICTION PLATE
♦ CARS
PRELIMINARY —
Cary Project Number 15 -SB -008
Cary HTE Number 15 -1463
NOT FOR
pp y own o Cary
Approved b the Town C
CONSTRUCTION
�,•.e �6/11/15� :�-
Development Review Committee
^/E P♦
Planner Date
WITHERS RAVEN EL
ENGINEERS I PLANNERS I SURVEYORS
111 MacKenan Drive Cary, North Carolina 27511 tel: 919 - 469 -3340 www.withersravenel.com License No. C -0832
Sheet No.
4.4