Loading...
HomeMy WebLinkAboutNCG030504_Insp Rpt_20240319 Compliance Inspection Report Permit:NCG030504 Effective: 07/01/21 Expiration: 06/30/26 Owner: Flowserve US Inc SOC: Effective: Expiration: Facility: Flowserve US Inc-Raleigh County: Wake 1900 S Saunders St Region: Raleigh Raleigh NC 27603 Contact Person:Adams Morakinyo Title: Phone: 919-800-8690 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 03/19/2024 Entry Time 11:OOAM Exit Time: 12:15PM Primary Inspector:Thaddeus W Valentine Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Technical Assistance Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030504 Owner-Facility:Flowserve US Inc Inspection Date: 03/19/2024 Inspection Type:Technical Assistance Reason for Visit: Routine Inspection Summary: We began our sample point inspections at SDO-ALT on the North side of the facility. ADO-ALT is sampled from the concrete flume that carries stormwater from offsite. SDO-ALT doesn't need to be sampled because it is stormwater flowing from offsite and doesn't represent stormwater from anything on the flowserve facility site. If there were outfalls that have trouble with high benchmark readings it would be valuable data to determine if any offsite flow is a contributor to the exceedances, but that's not the case here. SDO-001 is a approximaetly 24inch RCP pipe and is a valid sample point SDO-005 is the outfall that is in question and is the outfall I added on my last inspection. SDO-005 is a valid sample point as it discharges concentrated flow from products (Metal valve components)staged on site. The consultant believed that due to the possibility that SDO-005 may join SDO-002 after flowing through the woods, SDO-002 could be a representative outfall. Since he requested that SDP-005 be removed from the sampling requirements because it wasn't concentrated flow, that was denied. SDO-005 is concentrated flow when it leaves the production area at a curb outlet into a wooded area SDO-002 is RCP pipe approximately 10inches in diameter and is a valid sample point. SDO-004 outlets to the creek at just above water level and is a danger to reach. Therefore the sample should be taken at either the last(or lowest)drop inlet of two on the SW side of the facility, or by sampling both drop inlets.If the cloth BMP in the last(or lower)inlet is removed, both inlets can be sampled by sampling the pipe at the bottom of that last drop inlet, therefore sampling stormwater from both inlets.The alternative is to sample both inlets above the cloth BMP at the grate. (if that option is chosen an additional sample point most be added at the upper drop inlet) SDO-003 is a valid sample point To summarize the findings, the request for removal of SDO-005 is denied. There is an option for a request for Representative outfall status (ROS)for other outfalls that can be requested. Page 2 of 3 Permit: NCG030504 Owner-Facility:Flowserve US Inc Inspection Date: 03/19/2024 Inspection Type:Technical Assistance Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ 0 ❑ Comment: Not Reviewed Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ ❑ 0 ❑ Comment: N/A Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring data was reviewed and no problems were found Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ 0 ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ 0 ❑ Comment: The site visit was to review outfall #5 for possible removal from the sample points. Viewed all outfalls Page 3 of 3