Loading...
HomeMy WebLinkAbout20240436 Ver 1_ePCN Application_20240314DW R DHlsloo of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) October 2, 2023 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity? Yes No BIMS # Assigned Version# * 20240436 1 Is a payment required for this project?* No payment required What amount is owed?* Fee received $240.00 $570.00 Fee needed - send electronic notification $323.00 $767.00 Reviewing Office* Select Project Reviewer* Mooresville Regional Office - (704) 663-1699 Andrew Pitner:andrew.pitner Information for Initial Review la. Name of project: Kairoi University la. Who is the Primary Contact?* Taylor Kiker, PWS 1b. Primary Contact Email:* taylor.kiker@kimley-horn.com Date Submitted 3/14/2024 Nearest Body of Water UT to Stony Creek Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: 35.336324 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Mecklenburg Is this a NCDMS Project Yes No Longitude: -80.741134 1c. Primary Contact Phone:* (980)296-0810 Is this project a public transportation project?* Yes No 1a. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 29 - Residential Developments le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Mallard Oaks, LLC 2b. Deed book and page no.: 2c. Contact Person: 2d.Address Street Address 2400 South Blvd Address Line 2 Suite 300 city Charlotte Postal / Zip Code 28203 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country USA Yes No Yes No 2e. Telephone Number: (000)000-0000 2g. Email Address: noemail@noemail.com 2a. Name(s) on recorded deed: Corporation of the Presiding Bishop of the Church of Jesus Christ Latter -Day Saints 2b. Deed book and page no 2c. Contact Person: 2d. Address Street Address 50 East North Temple St Address Line 2 22nd FL city Salt Lake City Postal / Zip Code 84150 2e. Telephone Number: (000)000-0000 2g. Email Address:" noemail@noemail.com 2a. Name(s) on recorded deed: Collin Wolff 2b. Deed book and page no.: 2c. Contact Person: 2d.Address Street Address 100 River Ridge Road Address Line 2 city Columbia Postal / Zip Code 29210 2e. Telephone Number: (000)000-0000 2g. Email Address:* noemail@noemail.com 2a. Name(s) on recorded deed: Jo Anne G Perry 2b. Deed book and page no 2c. Contact Person: 2d.Address Street Address 10001 John Adams Road Address Line 2 city Charlotte Postal / Zip Code 28262 2e. Telephone Number: (000)000-0000 2g. Email Address:* noemail@noemail.com 2a. Name(s) on recorded deed: Virginia F Atwell 2f. Fax Number: State / Province / Region UT Country USA 2f. Fax Number: State / Province / Region SC Country USA 2f. Fax Number: State / Province / Region NC Country USA 2f. Fax Number: 2b. Deed book and page no.: 2c. Contact Person: 2d. Address Street Address 1005 Bancroft Ct Address Line 2 city Fort Mill Postal / Zip Code 29715 2e. Telephone Number: (000)000-0000 2g. Email Address:* noemail@noemail.com 2a. Name(s) on recorded deed: N11AVE LLC 2b. Deed book and page no 2c. Contact Person: 2d. Address Street Address 19490 Sandridge Way Address Line 2 city Leesburg Postal / Zip Code 20176 2e. Telephone Number: (000)000-0000 2g. Email Address:* noemail@noemail.com 3. Applicant Information (if different from owner) 3a. Name: Tyler Sibley 3b. Business Name: Kairoi Properties, LLC 3c. Address Street Address 711 Navarro Street Address Line 2 Suite 400 city San Antonio Postal / Zip Code 78205 3d. Telephone Number: (210)817-0024 3f. Email Address: tsibley@kairoi.com 4. Agent/Consultant (if applicable) 4a. Name: Taylor Kiker 4b. Business Name: Kin -ley -Horn and Associates State / Province / Region Sc Country USA 2f. Fax Number: State / Province / Region VA Country USA 2f. Fax Number: State / Province / Region TX Country USA 3e. Fax Number: 4c. Address Street Address 200 South Tryon St Address Line 2 Suite 200 city Charlotte Postal / Zip Code 28202 4d. Telephone Number: (980)296-0810 4f. Email Address:* taylor.kiker@kimley-horn.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Charlotte 2. Project Identification 2a. Property Identification Number: 029-02-211, 029-02-212, 029-02-213, 029-02- 214, 029-02-207, 029-02-208, 029-02-209, 029-02-210, 029-02-203, 029-02-205, 029-02- 277, 029-02-206 2c. Project Address Street Address John Adams Road Address Line 2 city Charlotte Postal / Zip Code 28262 3. Surface Waters 3a. Name of the nearest body of water to proposed project: " UT to Stony Creek 3b. Water Resources Classification of nearest receiving water:" C 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050103 4. Project Description and History State / Province / Region NC Country USA 4e. Fax Number: 2b. Property size: State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The proposed project is a 33-acre tract comprised of undeveloped forested land, open areas, and single-family residences. The subject property is bound by Galloway Road and undeveloped forested land to the north, John Adams Road and multi -family residences to the east, undeveloped forested land and W Mallard Creek Church Road to the south, and 1-85 to the west. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.39 4g. List the total estimated linear feet of all existing streams on the property: 2,157 4h. Explain the purpose of the proposed project: The purpose of this project is to construct a multi -family development for the growing local community. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The proposed project seeks the development of ±330 multi -family units, as well as associated development infrastructure appurtenances including, on -site roadway, utilities, and stormwater facilities. General construction equipment including bulldozers, excavators, front-end loaders, etc. will be used for construction purposes. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: Kimley-Horn delineated the site on March 22, 2022. The PJD request is included in this permit. 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Taylor Kiker, PWS Agency/Consultant Company: Kimley-Hom and Associates Other: 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts U Impact 5 - W2 2a1 Reason (?) Grading 2b. Impact type* (?) P 2c. Type of W.* Headwater Forest 2d. W. name W2 2e. Forested* Yes 2f. Type of Jurisdicition * (?) Both 29• Impact area * 0.190 (acres) Impact 6 - W3 Grading P Headwater Forest W3 Yes Both 0.070 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.260 2g. Total Wetland Impact 0.260 21. Comments: The proposed development seeks authorization under NWP 29 for wetland impacts associated with grading necessary to construct the residences. The proposed project will result in a total of 0.26 acre of permanent impacts to wetlands. -Impact 5: 0.19 acre to Wetland 2 -Impact 6: 0.07 acre to Wetland 3 3. Stream Impacts S1 3a. Reason for impact (?) Impact 1 3b.lmpact type* Permanent 3c. Type of impact* Fill 3d. S. name* S2 3e. Stream Type* (?) Perennial 3f. Type of Jurisdiction* Both 3g. S. width Averge (feet) 3h. Impact length* 172 (linear feet) g2 Impact 2 Permanent Other S2 Perennial Both Average ((eet) 30 (linear feet) S3 Impact 3 Permanent Other S2 Perennial Both Average (feet) 18 (linear feet) gq Impact 4 Permanent Other S2 Perennial Both Average (feet) 10 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 3i. Total permanent stream impacts: 230 31. Total stream and ditch impacts: 230 3j. Comments: 3i. Total temporary stream impacts: The proposed development seeks authorization under NWP 29 for stream impacts associated with grading and pipe installation. The proposed project will result in a total of 230 linear feet (LF)/0.033 acre of permanent stream impacts. -Stream 2 (S2) o Impact 1: 172 LF/0.025 ac of permanent impacts to S2 results from grading activities necessary to construct the residences. o Impact 2: 21 LF of 60-in Reinforced Concrete Pipe (RCP) will be installed at Stream 2. The RCP results in 30 LF/0.005 acre of permanent impacts to S2. The RCP will be buried 1-ft to promote the passage of aquatic organisms. o Impact 3: The relocation of an existing pipe and installation of a new headwall will result in 18 LF/ 0.002-ac of permanent impacts to S2. o Impact 4: The relocation of an existing pipe and installation of a new headwall will result in 10 LF/ 0.001-ac of permanent impacts to S2. 4. Open Water Impacts 4a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type �114e. Waterbody type 4f. Impact area OW1 Impact? P OW1 Fill Pond 0.01 4g. Total temporary open water Impacts: 0.00 4g. Total open water impacts: 0.01 4h. Comments: 4g. Total permanent open water impacts: 0.01 The proposed development seeks authorization under NWP 29 for open water impacts associated with grading activities necessary to construct a stormwater management facility. The proposed project will result in a total of 0.004 acre of permanent impacts to open waters. -Impact 7: 0.004 acre to Open Water 1 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Avoidance and minimization efforts were implemented during development planning and design to the greatest extent practicable in order to reduce the overall impacts on the aquatic environment while staying within nationwide permit thresholds. The final plan demonstrates maximum avoidance and minimization efforts by reducing the proposed stream impacts. The rationale to support avoidance and minimization efforts include the following: -Avoidance of the remaining 1,927 LF of streams on -site. -Avoidance of the remaining 0.13 acre of wetlands on -site. -Erosion control measures implemented during the construction of the site will be removed immediately following the activities and any disturbance will be returned to pre -construction conditions. -The proposed future ROW is to be dedicated/reserved based on coordination with Charlotte DOT. Future build -out is not associated with this proposed subdivision and no impacts will be made at this time. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Stormwater facilities are sized and positioned to minimize impacts to the greatest extents practicable. Temporary erosion control measures, including but not limited to skimmer basins and silt fence, will be implemented to minimize sediment laden runoff from exiting the site. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Upper Rocky Umbrella Mitigation Bank and RES Yadkin 05 Umbrella Mitigation Bank L 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity Stream 230 Riparian wetland 0.26 3c. Comments Compensatory mitigation will be met by the purchase of credits through two private banks: the Upper Rocky Umbrella Mitigation Bank and the RES Yadkin 05 Umbrella Mitigation Bank. Based on an NCSAM assessment of Low for perennial stream S2, mitigation is proposed at a 1:1 ratio for impacts to this feature, or 230 stream mitigation credits. Based on an NCWAM assessment of Low for wetlands W2 and W3, mitigation is proposed at a 1:1 ratio for impacts to these features, or 0.26 wetland mitigation credits. In total, 230 stream mitigation credits and 0.26 wetland mitigation credits will be purchased to offset impacts associated with this project. Quality assessment results and Statement of Availability are included 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. Yes No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: This project does not include nor is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?' Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government stormwater program you are using. City of Charlotte Comments: The SMP is currently under review with the City of Charlotte. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. No additional or cumulative impacts are anticipated due to the construction of the proposed project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Wastewater generated from each lot will be collected and routed to the onsite gravity sewer system that consists of 6" PVC piping and 4' manholes. The onsite gravity sewer systems tie into an existing sanitary sewer system on John Adams Road that then runs parallel to the existing stream. The wastewater will be treated at the Mallard Creek Wastewater Treatment Plan (NDPES Permit #NC0030210). 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?" Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?" Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?" Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? A review of the North Carolina Natural Heritage Program (NCNHP) database on February 7, 2024, did not indicate known occurrences of threatened or endangered species within the project boundary. Potentially suitable habitat for threatened and endangered plant species on -site was surveyed. A concurrence request was submitted to USFWS on February 16, 2024. At the time of this submittal, a response from USFWS has not been received. A copy of the USFWS request is attached. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NCNHP element occurrence database did not indicate the presence of EFH within the project boundary. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? " Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?" Kimley-Horn consulted the North Carolina State Historic Preservation Office (SHPO) HPOWEB GIS service on February 7, 2024. No documented architectural or historical sites of significance within the project boundary were identified. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8c. What source(s) did you use to make the floodplain determination? FIRM Panel 3710458800K Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document _20240314_Kairoi University_NWP 29 & PJD.pdf 27.84MB File must be PDF or KMZ Comments Signature — By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Taylor Kiker Signature �� Date 3/14/2024 0