Loading...
HomeMy WebLinkAboutNCC240789_Site Plan or Location Map_20240319 \ v i / \, N \ � s. N \ CONSTRUCTION SCHEDULE 1-Obtain all uewssary pwmits end plea approvals.Erosion and Sofia.Control(EWSC)permit aM a Certificme of Coverage o yOpO ' / \ \ \ \ \ \ \ (COC)mart be obtained before any land disturbing activities occur.A copy of the MSC permit,the COC and a hard copy of the \\ plan must be kept on site,preferably in a permits box,and accessible drains inspection. 40 _ \ I ` \ 2.Imtell gravel construction Mosfirst,Men silt fences,reinforced silt fence 22p Oq0 / \ / outlets and wattles. 3.Finish clearing eM grabbing any necessary ewes on the lots as tM1ry are sinned. \ \ / \\ \ \ \ Ns \ \ \ \ 4.Begin lot grading and excavation activities I �� , \ \ \ \ \ S.Begin or eonOnue vnU hence eonstmctioe ae[ivitiar. a.tl \ \ .•\ N. � \\ \ \ 6.FinisM1 all rough grading end house consWe[ion.All areas no[dismMtl for]days needs m have mmpomry or permanrnt dcovw iusmlld. M OtNl�s119 pOPO y \ \ ].Install driveway&walks and patios. V� t°° �P�y 1 , \ \ \ \N N. B.Beginf egadinB of lm arena mostc 1'; o [, /J ` \ \ 9.reim;gmswng,mulening and stabilizing of lot In ases this will involve die i�utallation of sod on the lot The silt feaze will — 14", v \ rain place until the totes soddd or grassing rs nebilizd end takes hold \ lo.The wmm<mr anal)wnann a<1r-mapeenom ortn<wnamn ana edimentutian wnWl m<aara<a ana wmplete m<rollowmg F � �r; `\ \ � / �\ \ \ N `` \ \� —� \ combined self-inspection form found on Me DEMLR websik �s ream \ / https.1/ .d q.ne.g /b Vd-- s/en 6Y I-and-land resources/s[otmw ttt-progam/npdes consWetion-progrem. N y o �p ® \ \ \ \ 1 months f completepee f Hall be kept on site end aveilabl f inspection e[all times.It'recommended e \ \ / \ copy be kept' perm 6 Ref.G.S.113A54.1 through G.S.113A57S - 15A NCAC 04A0101 through 15A _ 0.0Pam �2 P ,9 \ \ \ \ \ `\ \ \ ` \ \ \ NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities. S' 00. \ II.Self-inspectionsf - and sedimentation trot measures are to be performed 1 every seven celwderdays and MOT`Es tzM' ; o y \ \ \ ` \ \ \ \ \ \ to 24 hours f w[f Hen l inch.Any needed repairs shall be de immediately to maintain measures as OP my \ \ \ ` \/ \ \ ` \ designed.All ESC shall b d spwrfid in the construction d I h tan Aram gauge shall be installed at the,y z / \ ect site for monitoring. Inspection and final acceptancelle Whenh project is complete the Pe inees shall contact DEMLR to close out the E&SC 1,o �. ^ �� \ \ \ ` \ \ N. ` \ Plan.Ater DEMLR informs the Permitme of the project close out,via inspection report,the penninw shell visit o \ \ .... "deq.oe.govMCG01"tumbmit an electronic Notice oftwmir:etion(o-NtYI).A$120 annual general permit tee will be charged rural the a-NOT has been tilled out. „....._ ®� VICINITY MAP A \ ..., v \ \ A \ \ V 7 ( (N.T.S.) \ .......... ` ( / ` \ --N____ ' "----- -----,, --.. \ \ A SELF—INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS\ \ \ \ ` COMPLETED AS 1AN EXCEL ASPREADSHEET. BLE FOR USE.IT CAN BE COMPLETED BY HAND OR \ \ \ \\ \ \ \ / ...... \ \, \\ \ \ -. /� ANEROSION ALTERNATIVE RNAAND VE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED 1 \ �/ \ \ \ \ \ \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A / \ \ \ \ ` \ NCAC 048.0131 STATES THAT'...DOCUMENTATION SHALL BE ACCOMPLISHED BY \ �/ \ \ \ \ \ \ \ \ APPROVED EROSION NAND G A SEDIMENTATION CONTROL CH MEASURE OR CPLAN OR BY COMPLETING,OFE SHOWN ON A COPY THE SODDING \ \ / \ N PRACTICE DATING NORD S DEVICE SHOWN IGNING AN PONnTHE APPROVED ON REPORT A EROSION ANDT LISTS H SEDIMENTATION mu.�.• \ \ \ / CONTROL PLAN.' 1 \ \ N \ \ \ \ ` \ \ A SELF—INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1"IS RI MI ° \ \ CONSTRUCTION \ "— �28 AVAILABLE FOR USE. LIMITS \ra �� The contractor shall conduct self nspect ohs of the erns on and sad mentat'on control m lgO ? \ P 2B? and complete the followng comb nee self nspecton form found as the DEMLR webste easures , \ ) \ l 1 N `R� 264 _ _ h p/w d g tie /comVdi sian energ minem d l d r o cee/s o mwa /e o mwattt pros m/pd a oneWgio program. J Twelve months of complete-nspecton forms shall be kept on ste and ova table for nspecton at m \ \ all times.It s recommended a copy be kept in a permits box (GS 113A 541(e),15A NCAC 04B.0131 NCG01 Part III Sections Aand B Self—inspections for erosionand sedimentation control • / / ` \ \ \ \ measu are to be performed at least once every even calenear Jaye one wthn 24 hours of IM / / \ I / / \ \ \ CONSTRUCTION '0B0 every event of recta than 1 nch An needed re°rs shall be my mmetl°tel tom tarn Ng \\� / O r LIMITS measuresas designed.All ESC measures shall be maintained as specified n the construction n • • es �^ III I ,IN \ / / N ^/ % / \ \ \` ` \ \ da{a'Is on this plan.A ran gauge shall be installed at the proJectps to for monitoring. .,�a.a.=c• Po,�m..00.` .. \ ml �d / / / / / S IYLeiYIt' \ \ \ \ \ WATTLE \`.... APPEARANCE OF GOOD SOD 1��lV� \ III rI I ryI \ / U 11`J \ \ \ \ •',` \ DATE: IP. PAGE: MIII lull YY'I4'VI III��J ��ea�.oaµoo� I / / a\�C t1ON8TRUCTI0N .w.S1 .. \ I I\ \ �6p N _ 4rann _ � FENCE \ \ ( \ tV ENTRANC Z.. \ I \? ` ( r _� Da1.�r... I I S I REINFORCED WATTLE a I IIIIIIII IIIIIIII .- ' vi �_•^„+_•^ \ \ \ YSe' CONSTRUCTION .• , •CQNSTRUCTIJN I SILT FENCE .m•�a,.o�oeE \ a �NCE I TTLE ENTRANCE 1 OUTLET Wm ) OP`�C CONSTR TION • � rl REINFOR y \ I \ \ nd / \ \ ENTRANC\ :n WATTLE 'll' SILT FENCE I \ rHe wnsHeD sr p OUTLET \ •CONSTRUCTION \ \ CONSTRUCTION �. \ LIMITS \ d2 \ A�\• REINFORCED ` \ \ \ \ \ STEEL FENCEP r / ENTRANC d WATTLE ILT FENCE Y UTLET fi \li4 \ SILTFENCE \ \ euR. WIRE FENCE R0aa \ je4 •A\144:REINFORC \WAT LE TVP.j ` y �� \ H nowARsao H I FILTER FABRIC, aorvrvl w' ,. a'Y� n SILT FENCE \ \\TDS \3 \; \m Min ea Nl�e297 \ • REINFORCED OUTLET 2 WATTLE \ \ 258 \ WASHED STONE i 3 FILTER FABRICINro SOLID GROUNDST SET MAX CLOTH IN TRENCH \E<Q'1 SITFENCE SILT F>�NCE �w 60 \ \ I on GROUND NOTES: y2PoPARrMN STEEL FENCE Arvo Haaowaae aZ�` \ OUTLET WATTLE (TYF) \\ ` \ f. I 1 Hardware cloth and gravel should overlay the silt fence at least 12 'edWAYrTLE ` } inches �..v ra war ` SILTFENCE\ :' 1 \ 1 Ie _ 1 S.'; I 2 8tone outlets should be Placed on low elevation areas of silt fence tope \ ` WATTLE (TVP.) g I I \ \ ` \ o I V, av and based on field conditions. J \B, MAINTENANCE 0 y" y;, \ \ �� \ F 1 Per NCG-01inspect outlet at lest once a week and after each 1 inch or \ SILT FENCE � HAlimvute cl,orn FILr[It rgslte NTR[NCH greater rainfall event Complete any required repairs mmed'ately. \Il Ate, tillJ�y,\p, \"_ (NP) , 0 '\ \ \ \ ♦ \ \ \ \ uaTm FENCE AN 2 Freshen stone when sediment accumulation exceeds 8'nches �gl rf w I SILT FENCE i ze6 \ `\\ \ \ s[cT ONv[w 3 Keep mesh free of debris to provide adequate flow. PITACIIMENI,DETAILS 4 Remove sediment when half of stone outlet s covered. III��IR •gym„a.„,,,,, I (TVP') ` I r \ \ \ \ \ ..\NC Enwr Hip, 5 Replace stone as needed to facilitate tle-water rag m�ml � mti,„ w\ - A \ z,. t. �� \z vse v N. V —�w� SILT FENCE OUTLET CONSTRUCTION \ \ \ \ \ _ =�n...— / �J No LIMITS \ ` ` N \ \ `` \ \\ \ \ �►�� �v P�a �� \ \ N \ \ \ II Ir IIF-11 � II:I / Vath .1Im A till I v....,manent ground cover III fg1 _�04 1 5•-12 < .mi�..an N V V \ \ nl I. \ \ i N. \ \ \ \\ \\ \\ \\ p�mP�anerwn m�<n. clays \ N. \ N \ �� \ \\ \ N \ ` \\ N \ \ \ \ GROUND STABILIZATION \ \ I SITE AREA STABILIZATION EXCEPTIONS \ \ \ DESCRIPTION TIME FRAME \ \ \ \\ \\ \ \` \ \ I I PERIMETER DIKES, J DAYS NONE 1 SWALES,DITCHES &SLOPES '''''N \ \ \ \ \\ \ \\ \ I I ' I I \ HIGH QUALITY J DAYS NONE WATER ZONES (HOW) SLOPES SLEEPER ]DAYS IF SLOPES ARE \ ` \ \\ \ \ \ \ \ \ \ I I PAGE 1 of 2 THAN 3,1 10'OR LESS IN LENGTH AND ARE /\ NOT STEEPER THAN 2,1,14 \ DAYS ARE I \ TOTAL DISTURBED ACREAGE:4.06 ACRES ALLOWED \ \ \ \ \ \ \ \ \ \ \ SLOPES 3,1 OR 14 DAYS ]DAYS FOR 1 FLATTER SLOPES GREATER \ LOT EROSION CONTROL PLAN THAN w•IN \ ` \ I \ \ \ \ \ ` \ \ \ LOTS 1-5 LENGTH 1 ALL OTHER AREAS 14 DAYS NONE(EXCEPT \ AT MTh SLOPES DR PERIMETERS ` \ \ \ \ \ \ \ \\ �\\ PEACH ORCHARD RATTER THAN 4,1 AND HOW ZONES) N,l \ \ \\ ` \ \ ` \ '(f1J•=J ` \ FOR General Erosion Control Notes \ \ \ \ \ \ \ 1 \ ONSITE HOMES, LLC \ 1.Only the areas shown shall be disturbed. \ \ 2.All disturbed areas shall be grassed and mulched as soon as \ \ \\ \` I \ \ UPPER LITTLE RIVER TOWNSHIP HARNETT COUNTY,N.C. possible and maintained until permanent cover is established. / \ \ SCALE:111=60' FEBRUARY 2024 GRAPHIC SCALE R6D 0 30 80 120 240 Pursuant to G.S.113A(3),provisions for permanent ground cover ENGINEERS d 11 sufficient to restrain erosion must be accomplished for all • disturbed areas within 14 working days or 90 calendar days PLANNERS ( IN FEET ) 1 inch = 60 ft- (whichever is shorter)following completion of construction. SURVEYORS MOORMAN,KIZER&REITZEL,INC. 115 BR0ADF00T AVE. FAYETTEVILLE,N.C.28305 MOORMAN, KIZER & REITZEL, INC. PHONE(910)484-5191 FAX(910)484-0388 LICENSE#:F-0106 LAST SAVED:2/1/024 1:42 PM LAST PLOTTED:2/1/024 2:29 PM PLOTTED DY,Dennis Gilbert FILENAME:G:\CURRENT JOBS\ONSITE HOMES\23-2724-10 PEACH FARM RD—Eel\PLAMS\PEACHORGHARDEG—LOTSI—S.ECU