� s. N \ CONSTRUCTION SCHEDULE
1-Obtain all uewssary pwmits end plea approvals.Erosion and Sofia.Control(EWSC)permit aM a Certificme of Coverage
o
yOpO ' / \ \ \ \ \ \ \ (COC)mart be obtained before any land disturbing activities occur.A copy of the MSC permit,the COC and a hard copy of the
\\ plan must be kept on site,preferably in a permits box,and accessible drains inspection.
40 _ \ I ` \ 2.Imtell gravel construction Mosfirst,Men silt fences,reinforced silt fence
22p Oq0 / \ / outlets and wattles.
3.Finish clearing eM grabbing any necessary ewes on the lots as tM1ry are sinned.
\ \ / \\ \ \ \ Ns
\ \ \ \ 4.Begin lot grading and excavation activities
I �� , \ \ \ \ \ S.Begin or eonOnue vnU hence eonstmctioe ae[ivitiar.
a.tl \ \ .•\ N. � \\ \ \ 6.FinisM1 all rough grading end house consWe[ion.All areas no[dismMtl for]days needs m have mmpomry or permanrnt
dcovw iusmlld.
M OtNl�s119 pOPO y \ \ ].Install driveway&walks and patios.
V� t°° �P�y 1 , \ \ \ \N N. B.Beginf egadinB of lm arena mostc
1';
o [, /J ` \ \ 9.reim;gmswng,mulening and stabilizing of lot In ases this will involve die i�utallation of sod on the lot The silt feaze will
— 14",
v \ rain place until the totes soddd or grassing rs nebilizd end takes hold
\ lo.The wmm<mr anal)wnann a<1r-mapeenom ortn<wnamn ana edimentutian wnWl m<aara<a ana wmplete m<rollowmg
F � �r; `\ \ � / �\ \ \ N `` \ \� —� \ combined self-inspection form found on Me DEMLR websik �s ream
\ / https.1/ .d q.ne.g /b Vd-- s/en 6Y I-and-land resources/s[otmw ttt-progam/npdes consWetion-progrem.
N y o �p ® \ \ \ \ 1 months f completepee f Hall be kept on site end aveilabl f inspection e[all times.It'recommended e
\ \ / \ copy be kept' perm 6 Ref.G.S.113A54.1 through G.S.113A57S - 15A NCAC 04A0101 through 15A
_ 0.0Pam �2 P ,9 \ \ \ \ \ `\ \ \ ` \ \ \ NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities.
S' 00. \ II.Self-inspectionsf - and sedimentation trot measures are to be performed 1 every seven celwderdays and
MOT`Es tzM' ; o y \ \ \ ` \ \ \ \ \ \ to 24 hours f w[f Hen l inch.Any needed repairs shall be de immediately to maintain measures as
OP my \ \ \ ` \/ \ \ ` \ designed.All ESC shall b d spwrfid in the construction d I h tan Aram gauge shall be installed
at the,y z / \ ect site for monitoring.
Inspection and final acceptancelle Whenh project is complete the Pe inees shall contact DEMLR to close out the E&SC
1,o �. ^ �� \ \ \ ` \ \ N.
` \ Plan.Ater DEMLR informs the Permitme of the project close out,via inspection report,the penninw shell visit
o \ \ ....
"deq.oe.govMCG01"tumbmit an electronic Notice oftwmir:etion(o-NtYI).A$120 annual general permit tee will be charged
rural the a-NOT has been tilled out.
„....._
®� VICINITY MAP A \ ...,
v \ \ A
\ \ V 7 (
(N.T.S.) \ ..........
` ( / ` \ --N____ ' "----- -----,, --..
\ \ A SELF—INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
NCGS\ \ \ \ ` COMPLETED AS 1AN EXCEL ASPREADSHEET.
BLE FOR USE.IT CAN BE COMPLETED BY HAND OR
\ \ \ \\ \ \ \ / ......
\ \, \\ \ \ -. /� ANEROSION ALTERNATIVE
RNAAND
VE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED
1 \ �/ \ \ \ \ \ \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A
/ \ \ \ \ ` \ NCAC 048.0131 STATES THAT'...DOCUMENTATION SHALL BE ACCOMPLISHED BY
\ �/ \ \ \ \ \ \ \ \ APPROVED EROSION NAND G A SEDIMENTATION CONTROL CH MEASURE OR CPLAN OR BY COMPLETING,OFE SHOWN ON A COPY THE
SODDING \ \
/ \ N PRACTICE DATING NORD S DEVICE SHOWN IGNING AN PONnTHE APPROVED ON REPORT A EROSION ANDT LISTS H SEDIMENTATION
mu.�.• \ \ \ / CONTROL PLAN.'
1 \
\ N \ \ \
\ ` \ \ A SELF—INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1"IS
RI MI ° \ \ CONSTRUCTION \ "— �28 AVAILABLE FOR USE.
LIMITS \ra �� The contractor shall conduct self nspect ohs of the erns on and sad mentat'on control m
lgO ? \ P 2B? and complete the followng comb nee self nspecton form found as the DEMLR webste easures
, \ ) \ l 1 N `R� 264 _ _ h p/w d g tie /comVdi sian energ minem d l d r o cee/s o mwa /e o mwattt pros m/pd a oneWgio program.
J Twelve months of complete-nspecton forms shall be kept on ste and ova table for nspecton at
m
\ \ all times.It s recommended a copy be kept in a permits box (GS 113A 541(e),15A NCAC
04B.0131 NCG01 Part III Sections Aand B Self—inspections for erosionand sedimentation control
•
/ / ` \ \ \ \ measu are to be performed at least once every even calenear Jaye one wthn 24 hours of
IM / / \ I / / \ \ \ CONSTRUCTION '0B0 every event of recta than 1 nch An needed re°rs shall be my
mmetl°tel tom tarn
Ng \\� / O r LIMITS measuresas designed.All ESC measures shall be maintained as specified n the construction n
•
•
es
�^ III I ,IN \ / / N ^/ % / \ \ \` ` \ \ da{a'Is on this plan.A ran gauge shall be installed at the proJectps to for monitoring.
.,�a.a.=c• Po,�m..00.` .. \ ml �d / / / / / S IYLeiYIt' \ \ \ \ \ WATTLE \`....
APPEARANCE OF GOOD SOD 1��lV� \
III rI I ryI \ / U 11`J \ \ \ \ •',` \ DATE: IP. PAGE:
MIII lull YY'I4'VI III��J ��ea�.oaµoo� I / / a\�C t1ON8TRUCTI0N .w.S1 .. \ I I\ \ �6p N _ 4rann _ � FENCE
\ \ ( \ tV ENTRANC Z.. \ I \? ` ( r _�
Da1.�r... I I S I REINFORCED WATTLE a I IIIIIIII IIIIIIII .- '
vi �_•^„+_•^ \ \ \ YSe' CONSTRUCTION .• , •CQNSTRUCTIJN I SILT FENCE
.m•�a,.o�oeE
\ a �NCE I TTLE ENTRANCE 1 OUTLET
Wm ) OP`�C CONSTR TION • � rl REINFOR y \ I \ \
nd / \ \ ENTRANC\ :n WATTLE 'll' SILT FENCE I \ rHe wnsHeD sr
p OUTLET \ •CONSTRUCTION \
\ CONSTRUCTION �. \ LIMITS \
d2 \ A�\• REINFORCED ` \ \ \ \ \ STEEL FENCEP r
/ ENTRANC d WATTLE ILT FENCE
Y
UTLET fi
\li4 \ SILTFENCE \ \ euR. WIRE FENCE
R0aa \ je4 •A\144:REINFORC \WAT LE TVP.j ` y �� \ H nowARsao H I FILTER FABRIC,
aorvrvl w' ,. a'Y� n SILT FENCE \ \\TDS
\3 \; \m Min ea Nl�e297 \ • REINFORCED OUTLET 2 WATTLE \ \ 258 \ WASHED STONE i 3 FILTER FABRICINro SOLID GROUNDST SET MAX
CLOTH IN TRENCH
\E<Q'1 SITFENCE SILT F>�NCE �w 60 \ \ I on GROUND
NOTES: y2PoPARrMN STEEL FENCE Arvo Haaowaae
aZ�` \ OUTLET WATTLE (TYF) \\ ` \ f. I 1 Hardware cloth and gravel should overlay the silt fence at least 12
'edWAYrTLE ` } inches
�..v ra war ` SILTFENCE\ :' 1 \ 1 Ie _ 1 S.'; I 2 8tone outlets should be Placed on low elevation areas of silt fence
tope \ ` WATTLE (TVP.) g I I \ \ ` \ o I V, av and based on field conditions.
J \B, MAINTENANCE
0 y" y;, \ \ �� \ F 1 Per NCG-01inspect outlet at lest once a week and after each 1 inch or
\ SILT FENCE � HAlimvute cl,orn FILr[It rgslte NTR[NCH greater rainfall event Complete any required repairs mmed'ately.
\Il
Ate, tillJ�y,\p, \"_ (NP) , 0 '\ \ \ \ ♦ \ \ \ \ uaTm FENCE AN 2 Freshen stone when sediment accumulation exceeds 8'nches
�gl rf w I SILT FENCE
i ze6 \ `\\ \ \ s[cT ONv[w 3 Keep mesh free of debris to provide adequate flow.
PITACIIMENI,DETAILS
4 Remove sediment when half of stone outlet s covered.
III��IR •gym„a.„,,,,, I (TVP') ` I r \ \ \ \ \ ..\NC Enwr Hip,
5 Replace stone as needed to facilitate tle-water rag
m�ml � mti,„ w\ - A \ z,. t. �� \z vse v N. V —�w� SILT FENCE OUTLET
CONSTRUCTION \ \ \ \ \
_ =�n...— / �J No LIMITS \ ` ` N \ \ `` \ \\ \ \
�►�� �v P�a �� \ \ N \ \ \
II Ir IIF-11 � II:I / Vath .1Im
A
till I v....,manent ground cover
III fg1 _�04 1 5•-12 < .mi�..an N V V \ \ nl I.
\ \ i N. \ \ \ \\ \\ \\ \\ p�mP�anerwn m�<n.
clays
\ N. \ N \
�� \ \\ \ N \ ` \\ N \ \ \ \
GROUND STABILIZATION \ \ I
SITE AREA STABILIZATION EXCEPTIONS \ \ \
DESCRIPTION TIME FRAME \ \ \ \\ \\ \ \` \ \ I I
PERIMETER DIKES, J DAYS NONE 1
SWALES,DITCHES
&SLOPES '''''N
\ \ \ \ \\ \ \\ \ I I ' I I \
HIGH QUALITY J DAYS NONE
WATER ZONES
(HOW)
SLOPES SLEEPER ]DAYS IF SLOPES ARE \ ` \ \\ \ \ \ \ \ \ \ I I PAGE 1 of 2
THAN 3,1 10'OR LESS IN
LENGTH AND ARE /\
NOT STEEPER
THAN 2,1,14 \
DAYS ARE I \ TOTAL DISTURBED ACREAGE:4.06 ACRES
ALLOWED \ \ \ \ \ \ \ \ \ \ \
SLOPES 3,1 OR 14 DAYS ]DAYS FOR 1
FLATTER SLOPES GREATER \ LOT EROSION CONTROL PLAN
THAN w•IN \ ` \ I
\ \ \ \ \ ` \ \ \ LOTS 1-5
LENGTH 1
ALL OTHER AREAS 14 DAYS NONE(EXCEPT
\ AT
MTh SLOPES DR PERIMETERS
` \ \ \ \ \ \ \ \\ �\\ PEACH ORCHARD
RATTER THAN 4,1 AND HOW ZONES)
N,l \ \ \\ ` \ \ ` \
'(f1J•=J ` \ FOR
General Erosion Control Notes \ \ \ \ \ \ \ 1 \ ONSITE HOMES, LLC
\
1.Only the areas shown shall be disturbed. \ \
2.All disturbed areas shall be grassed and mulched as soon as \ \ \\ \` I \ \ UPPER LITTLE RIVER TOWNSHIP HARNETT COUNTY,N.C.
possible and maintained until permanent cover is established. /
\ \ SCALE:111=60' FEBRUARY 2024
GRAPHIC SCALE
R6D 0 30 80 120 240
Pursuant to G.S.113A(3),provisions for permanent ground cover ENGINEERS d 11
sufficient to restrain erosion must be accomplished for all •
disturbed areas within 14 working days or 90 calendar days PLANNERS ( IN FEET )
1 inch = 60 ft-
(whichever is shorter)following completion of construction. SURVEYORS MOORMAN,KIZER&REITZEL,INC. 115 BR0ADF00T AVE. FAYETTEVILLE,N.C.28305