Loading...
HomeMy WebLinkAboutSW3231104_Supplemental Info Review_20240318 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 3/18/2024 2:49:59 PM (Supplemental Submittal) Accept by Kaitlin Peck 3/19/2024 11:05:47 AM (Supplemental Info Submittal) • The task was assigned to Kaitlin Peck 3/18/2024 2:50:00 PM =DEQ • Submittal from 3/18/2024 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW3231104 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Holy Spirit Catholic Church, Lincoln County Owner/Operator* Roman Catholic Diocese of Charlotte County: Lincoln Submitter Name:* David Lutz Who is submitting this information? E-mail Address:* dlutz@ces-group.net Phone Number* 704-840-5133 Additional E-mail for (Optional) Submittal Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Response To Comments File Upload Click the upload button,or drag and drop files to attach Response Letter.pdf 474.49KB Only PDF files are accepted. File Type* Stormwater Narrative File Upload Click the upload button,or drag and drop files to attach Holy Spirit Catholic Church-Narrative.pdf 95.32KB Only PDF files are accepted. File Type* O&M Agreement/Plan File Upload Click the upload button,or drag and drop files to attach Operation and Maintenance Agreement.pdf 414.1 KB Only PDF files are accepted. File Type* Supplement-EZ Form File Upload Click the upload button,or drag and drop files to attach Supplemental EZ.pdf 314.24KB Only PDF files are accepted. File Type* Design Calculations File Upload Click the upload button,or drag and drop files to attach Design Calculations.pdf 1.72MB Only PDF files are accepted. File Type* Plansheet-Proposed Conditions/Site Plan File Upload Click the upload button,or drag and drop files to attach SITE PLAN-C3.0.pdf 1.45MB Only PDF files are accepted. File Type* Plansheet-Grading/Drainage Plan File Upload Click the upload button,or drag and drop files to attach GRADING AND DRAINAGE PLANS.pdf 2.2MB Only PDF files are accepted. File Type* Plansheet-SCM Detail File Upload Click the upload button,or drag and drop files to attach STORMWATER PLAN-05.4.pdf 734.8KB Only PDF files are accepted. File Type* Plansheet-Misc. Detail File Upload Click the upload button,or drag and drop files to attach DRAINAGE DETAILS-C10.0.pdf 4.5MB Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: Did not realize until uploading these documents that I did not scan the original application.As noted in package delivered 3/18/24,client is mailing the application separately, because they signed wrong area again. Please replace signature page of what submitted 3/18/24 with what receive from client. Thank you. * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; • I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* David Lutz Signature: Omwel,arz Date Submitted: 03/18/2024 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW3231104 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Brianna Holland Any Comments or Added Info for CO Staff Reviewer? Review Date* 03/19/2024