HomeMy WebLinkAbout20151210 Ver 1_CAMA Application_20151118Environmental
Quality
November 9, 2015
MEMORANDUM:
TO
PAT MCCRORY
Govemor
DONALD R. VAN DER VAART
secretary
to �)
2 1 5 1 NO X 1 8 201
210 5�
/DENR . w„ �__
Karen Higgins
401 & Buffer Permitting Unit
DWR/Water Quality Permitting
FROM: Heather Coats, Assistant Major Permits Coordinator
NCDEQ — Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405 heather. coats(cD-ncdenr.gov
Fax: 395 -3964 (Courier 0416 -33)
SUBJECT: CAMA Application Review
Applicant: Kings Landing Villas HOA, Inc.
Project Location: 202 Kings Landing Ct., adjacent to the A/WW, in Hampstead, Pender County
Proposed Project: to expand an existing docking facility by adding an 8' x 20' section of floating dock
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Heather Coats at the address above by December 3, 2015. If you
have any questions regarding the proposed project, contact Jason Dail at (910)796 -7221
when appropriate, in -depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATE
Nothing Compares-'-4-1-k-
State of North Carolina I Environmental Quality
1601 Mail Service Center I Raleigh, North Carolina 27699 -1601
919- 707 -8600
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
I. APPLICANT'S NAME: Kings Landing Villas HOA, Inc.
2. LOCATION OF PROJECT SITE: Site is located at 202 Kings Landing Court, adjacent to the AIWW, in
Hampstead, Pender County.
Photo Index— 2006: 26 -6635, P, O, 20 -21, S -13 2000:26-339,1,J-4 1995:26-322,R,5-6
State Plane Coordinates - X: 2401307 Y: 214269 GPS —N /A
Lat:34 °22'27.63 "N Long: 77 °39'02.15 "W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 11/3/15
Was Applicant Present - No
5. PROCESSING PROCEDURE: Application Received — Completed on 11/4/15
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan— Pender County
Land Classification From LUP — Residential, Resource Protection
(B) AEC(s) Involved: PT, EW
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing- Septic
Planned- N/A
(F) Type of Structures: Existing- Single family residence, storage building, private pier and
docking facility
Planned- Install additional section of floating dock
(G) Estimated Annual Rate of Erosion: N/A
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands ( §404)
(B) Non - Vegetated Wetlands (Open
Water)
160 sq. ft.
(incorporated)
(C) Other - Highground disturbance
(D) Total Area Disturbed: 160 sq. ft. (0.003 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: Yes
8. PROJECT SUMMARY: The applicant proposes to expand the existing docking facility by adding a new
8' x 20' section of floating dock.
Kings Landing Villas HOA, Inc.
Page 2 .
9. PROJECT DESCRIPTION
The project site is•located at 202 Kings Landing Court, adjacent to the AIWW, in Hampstead, Pender County.
To find the property, from the Wilmington Regional Office, take Highway 17 North from Wilmington
approximately 14 miles and turn right onto Country Club Drive. Continue along Country Club Drive
approximately 1.0 miles and turn right onto Kings Landing Road. Follow Kings Landing Road approximately 1.1
mile and turn left at the 90 degree curve onto Kings Landing Court. The subject property will be located on the
right hand side of the road, approximately 0.10 miles from the entrance, at unit # 202.
Existing structures on the project site include a 4 -unit condominium complex, storage building and 4 -slip
private docking facility. The project site is approximately 19,602 sq. ft. (0.45 acres) and is vegetated primarily
with native trees, domestic grasses and ornamental landscaping. The project site has approximately 85 linear
feet of shoreline fronting the AIWW.
The existing 4 -slip docking facility was constructed inIthe late 80's and the permit history has been difficult to
locate; however, a CAMA general permit ( #65086) was issued to Kings Landing Villas c/o Vern Hawkins in
January 2015 for the conversion from a floating horseshoe shaped dock to a fixed horseshoe shaped dock
(same location). The current docking facility consists of a 6'x 240' access pier, 10'x 16' platform, 6'x 40' fixed -
"spine" connecting two 4' x 25' fixed finger piers. Four boat lifts are currently installed, one on each side of the
existing finger piers.
The Pender County 2006 Land Use Plan classifies adjacent waters and high ground portion of the property as
Resource Protection. The waters of the AIWW in the location of the existing structure(s) are classified SA by
the Division of Water Resources. They are NOT designated as a Primary Nursery Area (PNA) by the N.C.
Division of Marine Fisheries and they are OPEN to the harvest of shellfish.
PROPOSED PROJECT
"The applicant proposes to expand the existing docking facility by adding an 8' wide x 20' long floating dock
section along the northern side of the existing platform, within the interior footprint. The proposed floating dock
would connect to the existing fixed platform (along the landward side) and would extend approximately 33'
toward the high ground. According to the applicant, the floating dock is necessary for safe water access while
loading /unloading passengers and gear throughout all tide cycles. As designed, the expansion would in
the total number of possible slips at this property from four to five. Currently, water depths surround the
existing facility,, and the proposed expansion, range from -2.0' to -5.0', relative to Normal Low Water.
10. ANTICIPATED IMPACTS
The proposed structure would incorporate approximately 160 sq. ft. of Estuarine Waters and Pubic Trust Area
along the northern side of the existing docking facility. The proposed structure would extend approximately 20'
landward of the existing facility and should not be considered a hazard to navigation. The proposed structure
would be located within the existing footprint of the existing docking facility. The structure would conform to
both the 1/4 width rule and the established pier lengths. The proposed structures would not encroach into the
adjacent 15' Riparian Corridor Setback Area requirement. Minor increases in turbidity should be expected
during construction.
Submifted'by: Jason Dail Date: November 6, 2015 Office: Wilmington
Kings Villa HOA
202 Kings landing Ct,
Hampstead, NC 28443
Narrative:
Dear Committee,
We have four boat lifts at our dock that are on a fixed elevated deck. We are finding
it difficult to access our boats and safely enter the water from the lifts. We would
like to install one- access floating docl on ,Korth side of the main dock to better serve
our needs. We hope you will understand our request and allow us to proceed with
this project. Thank you for your support.
r�G
V
i)(',P.A iJMILMINCXMN, NC
0 C/ 11
(last revised 12/27/06)
2.t 3 'e 8i3 yk b c.
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
" /—,IN Z� i -J C
Kingslanding HOA Dock
Clements Marine Construction Inc,.
Last Name
Agent/ Contractor 1: First Name
Applicant 1. First Name
MI
Mark
H
Clements
Hawkins
Agent/ Contractor 2: First Name
Vern
Last Name
Mailing Address
Applicant 2: First Name
MI
Last Name
State
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
City
ZIP
State
15 Blue Bill Cove
Greensboro
Phone No. 2
NC
ZIP
Country
Phone No.
FAX No.
27455
pender
336 - 908 - 0736 ext.
- -
Street Address (if different from above)
City
State
ZIP
202,204,206,208 Kings Landint Ct
Hampstead
NC
ZIP
28445 -
Email
2. Agent(Contractor Information
Business Name
Clements Marine Construction Inc,.
Agent/ Contractor 1: First Name
MI
Last Name
Mark
H
Clements
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
112 Circle Drive
Hampstead
NC
ZIP
Phone No. 1
Phone No. 2
28443
910 - 620 - 9110
ext
910 - 270 - 9110 ext.
FAX No.
Contractor #
same
Street Address (lf different from above)
City
State
ZIP
Email
clementsmarineco @bellsouth.net
_�`J 1`il VY1:^IV11141,.! I VI Y, 14L!
<Form continues on back> - OCT 2 i 2015
Form DCM MP -1 (Page 3 of 5)
r.-
APPLICATION for
Major Development Permit"
3. Project Location
County (can be multiple)
Street Address
State Rd. #
pender
202 Kingslanding Ct
Hwy 17
Subdivision Name
City
State
Zip
Kingsvilla '
Hampstead
NC
28445 - .
Phone No.
Lot No.(s) (if many, attach additional page with list)
910 - 620 - 9505 ext.
1,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
C1496 4 QCr
. AICW
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
AICW
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ❑No
work falls within.
r -20
pender county
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
100'
96800
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
0.45 acre, I ,
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
15' ®NHW or ❑NWL
`
e.
Vegetation on tract
lawn grass some oak trees
f.
Man -made features and uses now on tract
pier
g.
Identify and describe the existing land uses adiacent to the proposed project site.
private residential homes
h.
How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
r -20
(Attach zoning compliance certificate, if applicable)
®Yes ❑No ❑NA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k.
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
-
If yes, by whom?
I.
Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
HECEIVE® ,
DCM WILMINGTON, NC
0 C T 2 12015
Form DCM MP -1 (Page 4 of 5)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? []Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
private septic
o. Describe existing drinking water supply source.
well and or county
p. Describe existing storm water management or treatment systems.
n/a
5. Activities and Impacts
a.
Will the project be for commercial, public, or private use?
❑Commercial ❑Public/Government
®Private /Community
b.
Give a brief description of purpose, use, and daily operations of the project when complete.
we wish to install a floating dock as a day dock to our current slips.
c.
Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
we will install a floating dock to serve as a day dock for boat access, we currently have 4 boatlifts on a fixed dock. This install
will only require some hand tools and a pile barge to install four pilings. nothing will
be stored on this site.
d.
List all development activities you propose.
To install a floating day dock.
e.
Are the proposed activities maintenance of an existing project, new work, or both?
new
f.
What is the approximate total disturbed land area resulting from the proposed project?
n/a ❑Sq.Ft or ❑Acres
g.
Will the proposed project encroach on any public easement, public accessway or other area
[]Yes ®No ❑NA
that the public has established use of?
h.
Describe location and type of existing and proposed discharges to waters of the state.
surface runoff
i.
Will wastewater or stormwater be discharged into a wetland?
❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes ❑No ❑NA
j.
Is there any mitigation proposed?
❑Yes ❑No ❑NA
If yes, attach a mitigation proposal.
FJ
DCM WILMINGTON, NC
<Form continues on back>
0 C T 2 12015
Form DCM MP -1 (Page 5 of 5)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Jean Smith Phone No. n/a
Address 3211 Snowberry Ct. Wilmington NC 28409
Name Erin Kuczmarski Phone No. n/a
Address 200 Kingslanding Court. Hampstead NC 28443
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
GP 65086
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date 9/25/15 Print Name Mark Clements
Signature
Please indicate application attachments pertaining to your proposed project.
❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development
®DCM MP -4 Structures Information
�t�
R- ECEIVED
DCM WILMINGTON, NC
OCT 2 12015
Form DCM MP -4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
9. DOCKING FACILITY /MARINA CHARACTERISTICS
a. (i) Is the docking facility /marina:
❑Commercial ❑Public/Government NPrivate /Community
c. (i) Dock(s) and /or pier(s)
(ii) Number 1
(iii) Length existing
(iv) Width
(v) Floating [–]Yes NNo
e. (i) Are Platforms included? NYes ❑No
If yes:
(ii) Number 1
(iii) Length 20'
(iv) Width S'
(v) Floating NYes ❑No
Note: Roofed areas are calculated from dripline dimensions.
g. ti) Number of slips proposed
1
(ii) Number of slips existing
4
i. Check the proposed type of siting:
❑ Land cut and access channel
❑Open water; dredging for basin and /or channel
NOpen water; no dredging required
[]Other, please describe:
❑This section not applicable
b. (i) Will the facility be open to the general public?
[]Yes NNo
d. (i) Are Finger Piers included? Yes J4No
If yes:
(ii) Number
(iii) Length e.
(iv) Width
(v) Floating ❑Yes NNo
f. (i) Are Boatlifts included? —Yes 94No
If yes:
(ii) Number
(iii) Length
(iv) Width
h. Check all the types of services to be provided.
❑ Full service, including travel lift and /or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
❑ Dockage ( "wet slips ") only, number of slips:
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
mixed
k• Typical boat length: 25' R F C E I V E Do Will the facility be open to the general public?
NOV 04 2015 ; .F--CE6 ED
11- -►5 D'M W! ', vGTON, NC
Nc
2
m. (i) Will the facility have tie pilings?
❑Yes ®No
(ii) If yes number of tie pilings?
❑Yes ®No
2. DOCKING FACILITY /MARINA OPERATIONS [D This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: ; Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of " Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live- aboard dockage?
k. Describe design measures that promote boat basin flushing?
012ty, VVI' _MINGTON, NC
0 C T 2 12015
I. If this project is an expansion of an existing marina, what types of services are currently provided?
m. Is the marina /docking facility proposed within a primary or secondary nursery area?
❑Yes ❑No
n. Is the marina /docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes []No
o. Is the marina /docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes '040
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑PublictGovernment ❑Private /Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable
a. (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) [D This section not applicable
a• Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s):
❑Commercial ❑PubliclGovernment ❑Private /Community
c. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
' RECEIVED
NOV 0 4 2015
DCM WiLrilINGTO
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
i�il `i�/1 "vI I�TOt* NC
ACT
e. Arc of the swing
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
N.16' S.31.91
Note: For buoy or mooring piling, use arc of swing including length
of vessel
c. Width of water body
432.99'
e. (i) Will navigational aids be required as a result of the project?
[]Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
b. Proximity of structure(s) to adjacent docking facilities.
N.92.54 S.74'
d. Water depth at waterward end of structure at NLW or NWL
3'5 NLW
8. OTHER ❑This section not applicable
a. Give complete description:
To install A day docK J&,uL jy floating to aid in getting in and out of our boats.
9/25/2015
Date
Kings Landing Villa
Project Name
mark clements
Applicame �
Applicant Signature
1
�3
Vi i~ :-.1 V
DCM GNILMIr ON, NC
0 T ` - 21.35
AIMI
QYK
I I Z 3a
elf 0
N w
I �
r o ec
I
Noll
I ni �Mj O Vi 11ci
-21
cue z
I
Jew Smi�1r� }iin�SlAn��;n� Ucllc_ NDA. 5'rv�J
Ucz Nl�rs�i
.n GSUt1�a- k o i
DA4}i
a
e►'lc�er
D
4VI MINGTON, NC
O C i 2 i 2015