Loading...
HomeMy WebLinkAbout20030570 Ver 7_More Info Received_20151117' MULKEY ENGINEERS & CONSULTANTS PO Box 33127 RALEIGH, NC 27636 PHONE: 919-851-1912 FAx: 919-B51-191B LETTER OF TRANSMITTAL To: Date: November 17, 2015 NC Division of Water Resources 512 N. Salisbury Street Raleigh, NC 27609 From: Brian Dustin Re: Stormwater Plans, Reynolds Mill, Phase 3 Wake Forest, NC Job No.: 2011076.00 I am sending you the following item(s): COPIES DATE DESCRIPTION 4 11/17/15 Stormwater Management and Diffuse Flow Plan These are transmitted as checked below: ❑ As requested ® For approval ® For review and comment Remarks: Mr. Smith, ❑ For your use ❑ For Signatures El If you have any questions or concerns, please call me at (919) 858 -1926. Signature 0",�VA- 136nan Dustin Senior Scientist November 17, 2015 Mr. Danny Smith NC Division of Water Resources 512 N. Salisbury Street Raleigh, North Carolina 27609 Subject: PCN for Reynolds Mill Phase 3, Wake Forest, NC Dear Mr. Smith, MULKEY ENGINEERS & CONSULTANTS c/1% 'bD ) M \ abO' 141 '9 This letter is in response to the "Request for Additional Information" letter, about Reynolds Mill Phase 3, sent on October 23, 2015 by your office. The Stormwater Management and Diffuse Flow Plan have been approved by the Town of Wake Forest and are included in this packet for your review. The attached plan sheets show the location of both bioretention ponds that are proposed for Reynolds Mill Phase 3 project. If you have any questions or concerns, please do not hesitate to contact me directly at (919) 858- 1926 or by email to bdustin @mulkeyinc.com. Sincerely, Brian Dustin Senior Biologist MULKEY ENGINEERS & CONSULTANTS, INC. Attachments: Stormwater Plan CC: File ;J n C��rM2 NOV 1 7 2015 R ^WATER RESOURCE$ MULKEY INC. 6750 TRYON ROAD CARY. NC 2751 1 PC BOX 33127 RALEIGH, NC 27636 PH: 91 9-851 -191 2 FAX: 9 19-851 -191 8 WWW.MULKEYINr.COM "ALL C 0 N STR U CTIO N TO B E IN ACCORDANCE WITH ALL TO WN 0 F WAKE F0 R E S T, CITY OF ALEIGH AN L) / OR N CDOT S TAN DARDS AND SPECIFICATIONS " a All F "S rqkEYNOLDS MILL M1111111111M PHASE 3E�, l.Water main to be installed at a depth with a minimum cover of 48", with 18' verfica (;iearance minimum (separation must l over sanitary sewer) from other underground tifilifies and 10 fee nonzontal clearance from sanitary sewer mains, 2.Pressure reducing valves shall be provided if pressure is in excess of 80 pa 3. Gate valves shall be installed on each main line branch (3 per tee, 4 per cross). General Utility I All water and sewer mains within public easements and Rights-of-Way to be owl operated, and maintained by the public authority, 2.AJI construction to be of the local authority standards and specifications. 3,All Underground utilities are approximately located. Actual location and depth to We confirmed in field prior to construction. �IUBLIC WATER AND SANITARY SEWER QUANTITIES 6" WATER 211 LF 8" WATER 3,017 LF 12" WATER 1,479 LF 8" SANITARY SEWER 3,484 LF STORM DRAINAGE LANDSCAPE, PARKS & OPEN SPACE PLAN 15" RCP 313 LF 18" RCP 1208 LF 24" RCP 779 LF 30" RCP 345 LF 36" RCP 523 LF Site Data Table IplilllllIi�gil iiiiii i .6mm'111iiiii1l"i illit 11 111:1 11315 lif =1 7. Total Number of Lots Proposed in Phase 3 - 66 CAS J, INDEX OF SHEETS C-000 COVER C -100 EXISTING CONID'TIONS C-200 SITE PLAN C-201 STREET SIB AGE PLAN C-202 LANDSCAPE, PARKS & OPEN SPACE PLAN C-300 OVERALL LITILI TY PLAN C-301 LIGION MILL RDJTILITY PLAN C-302 SITE UTILITY PLAN C-400 OVERALL GRADING & DRAINAGE PLAN 0-401 LIGION MILL RD GRADING & DRAINAGE PLAN C-402 SITE GRADING & DRAINAGE PLAN C-500 OVERALL EROSION CONTROL PLAN C-501 LIGION MILL RD EROSION CONTROL PLAN C-502 SITE EROSION CONTROL PLAN PHASE 1 C-503 SITE EROSION CONTROL PLAN PHASE 2 C-600 LIGON MILL RO/-,D PLAN & PROFILE C-601 REYNOLDS MILL RD PLAN & PROFILE C-602 PENSTOCK DRI\/E PLAN & PROFILE C-603 NEAP CE MILL WAY PLAN & PROFILE C-604 REE LANE PLAN & PROFILE C-605 FOR ES ROAD PLAN & PROFILE C-606 SS OUTFALLS A AND C PLAN & PROFILE C-607 SS OUTFALL E PLAN & PROFILE C-700 DETAILS ATTENTION CONTRACTORS TliF-WNSMUCHOiVCONIR4GORRESPON,SMLLI-OR 1111EMINSIONOF WATER SE0vTR­-V1U OR FWSF, AS APPROVEL) IN 71HIESEPIANS, IS RESPONSIBLE MR a)NTA(_7W6 THE PUNIC UTMM I)EPARMEVT NT (919)996-4540 ATLFMT 7WEV7YR)[7R1K)11R5PR10RT() BB5T\NING ANY OFTElE[R(DNSTRL,cnoN. FA "I NOTIFYBO'L4a[YDLPIR7ME� 7',SINAD\,A.NICEOFBBCiININING CONS-IRUC171ON, WILT RESUI-TINTliEI&SLTANCFOFM07VT-TARYPEVA-, AND R13QUIREREINSFAUATTOIN OF ANYWATER OR SEWER FAMIES NOT INSPFEIED.AS A RESUIT OF THIS NOTIFICATION FA11LURE FAH-URETO CA11,FORINSPICHON, INSTALLA L)OWATS7MM PLIJG, HAVE PD?,VH7TDP1AA,SONTHFPJJl, ORANTYOT1ERW0LA770NOF07Y0Ff R4 UJIGH S7AJM)ARDS'ii RESIXT N A HVE AND Pli LYaLISION FROM FUTURE WOPKlNn-ECJ7YOFRALgGH C-701 DETAILS ALL PUBLIC FACILITIES, INCLUDING UTILITIES, SIDEWALKS, C-702 DETAILS AND HANDICAP RAMPS ARE TO BE CONSTRUCTED ON ALL C-703 DETAILS STREETS AS SPECIFIED BY TOWN STANDARDS. THESE FACILITIES HAVE BEEN APPROVED BY THE TOWN OF WAKE C-704 DETAILS FOREST AND SHALL BE SO INSTALLED UNLESS A CHANGE C-705 DETAILS IS APPROVED BY THE TOWN OF WAKE FOREST. C-706 DETAILS C-707 DETAILS REVIEW ENGINEER DISCLAIMER C-708 POND DETAILS Master Plan Conditions. I. [)Tpon the owner's dedication of the right-of-way for Ligon Mill Road as pro .,A in RZ,04-1 1, the developer will build care-half'of the ultimate cross-sections (western por,,,c. n) of Ligon Mill Road from the southwestern most corner the subdivision to the northweste— most corner of the subdivision as illustrated in the Reynolds Mill, Phase 3 Subdivision Mastc , Plan. Subject to the dedication of the right-of-way, this work will begin prior to the corripletic, of the first seventy-five (75) homes in the entire development and will be completed pr.,,­ to the issuance of a G�rtificate of Occupancy for a home in Phase 3. 2. The initial stream crossing for Ligon Mill Road shall be constructed to the neces,:,ary width to accommodate the entire four lane section with bike lanes and sidewalks per the IIVFTP and US-1 Corridor Plan. 3, Collector street shall be constructed and connected from S. Main Street to Ligc- Mill Road with this development. 4. Southern most drive on the Ligon Mill Road shall be a right-in/right-out intersec,,,,,,-,)n at ultimate crossing - section build out. 5. Provide improvements recommended by the Traffic Impact Analysis upon com ' C,,�Aion. 6. Meuse River Riparian Buffers shall be recorded as conservation easements, 7, Heavy construction traffic shall use Ligon Mill Road to access Phase 2 & 3. He ,,,y construction traffic through existing subdivision phase(s) is prohibited, 8. A payment-in-lieu shall be provided for street tree plantings along western side -,,' Ligon Mill Road. 9. The amenities center shall be built by Spring of 2016 and before a Certificate ci` Occupancy is issued for a home in Phase 3. Zia, /0 Z*15, n OWNER DATE VIGMTY MAP Water Distribution/Extension Svstern City of Raleigh Public Utilities Department Permit# C) Authorization to Construct _yz "t`"' Date tl 0 tS City of Raleigh Public Utilities Department Permit# S I, 07� Authorization to Construct Date I C, Z, r.5.11111 Owner: Parker &Orleans t lomemilders, Inc. 211 James Jackson Ave. Carv, NC 27513 THESE PLANS HAVE BEEN AP;QOVED FOR CONSTRUCTION BY THE TOWN OF WAKE FOREST ENGINEERI,VG 'PEPARTMENT V 07-211 ?_2 --A CITY OF RALEIGH PUBLIC U717ES DATE ®m "ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL TOWN OF WAKF. FORE-ST, CITY OF RALEI(3H AND / OR NC DOT STANDARDS AND SPECIFICATIONS" 5 6 — I 6,ebu 7 —5 --, F I I I I 7,504 or i I 7,504 SF 0 1 i i 7,504 SF 7 rOAR P NO PART OF RETAINING F .B. 13007, PG. 2041 1141 SF (364 ---- DG FAMILY LLC 1C =39624' - 9,0 WK D If ( 365 �Jffl KF US-1, LLC 0.8, 6184� PG'� 80" TRA C T I S. M, 19 9 4, P G, b0l, PIN NO, Ma ZONE]-11-11,1 LAN,0- �'JSfE, • • WAKE FLEC-TRWAL MEMBERSHYP CORPORATION 03 9650, PG. 1302 ITTRIA C T I -- C' 8JV. 200,22, 15,36 PiN NO, 18,30,04---7-4-7569 ZONED:, 1GR10 LAND USE SUB Sl"'41110N 1 14: 99,- pc 6 4 41 WINEGARTEN' /NVF5zTME`N'TS,, ING', D,E 117-7' 148" 13. M. 200;',", PG, 87 PIN NO 1830-7,'5­551 ZONED, CU GRID LAND USE VAC'ANT N ru E-�� 0298 0. 7 PIN NO, 1830-85- N 2, 7' 7�" 3033 22- "yo CU H8 6. -0, 7,645 SF z.. LAN 20 E u N 62'33'01" W 16 LTE 36.17' 3 8. 334 k3 $ 710' V ERN x, 8'16' w S,15° '(17 8,279 SF 26' UDAR X` V, dr 'A S� N� f if U 'z -e s. 01�1440�1)�,;-, ,lv" "? 4 41 rx a i Ira mill DRA" BY: TS G DWG. CHECKED BY: MDA: S-E-E-P-LAN7 DATE: MARCH 25th, 20 15 Mile r 1/ • • • • a i Ira mill DRA" BY: TS G DWG. CHECKED BY: MDA: S-E-E-P-LAN7 DATE: MARCH 25th, 20 15 Mile r 1/ odtio IN SSMH 11 (5) RIM: 307,53' INV IN: 297.44' ■ WATERLINE amuffilm "ALL CONS TRUCTION TO BE IN ACCORDANCE WITH ALL TOWN OF WAKE FORES T, CITY OF ?,ALEIGH AND / OR NC T' STAN AND S PECIFICATIONS" Tt M Cf) 71 7 0 "*B�OWOF�77' INV IN: 316.82 23 Aff-) 1117k-�i C 'I F� tv" I ME :/T Or/' Public FOR MORE IN.F"-',,RMATION 4z- BEASLEY AT (919) 996-2334 OR ILILM� 'S ARE REQUIRED BASED ON D: 31REE OF HEALTH HAZARD INVOLVE 13 .CROSS-CONNECTION CONTROL PROTECI ION DEVICE. -B OF THE RULES GOVERNING PUBLIC WATER SYSTEMS TNNORTH CAROLINA. THESE GUIDELINE AS LISTED IN APPENDIX A THE MINIMUM REQUIREMENTS, THE DEVICES SHALL MEET AMERICAN SOCIF-Y OF SANITARY ENGINEERING (ASS; RE STANDARDS OR BE ON THE UNIVERSITY OF SOUTHERN CALIFORNIA APPROVA.L LIST. THE DEVICES SHALL B Tzl TH INIIIAL AND PERIODIC TESTING THEREAFTER) WETLAND INSTALLED AND TESTED (BO ACCORDANCE WITH THE MANI TACRIRFR'S R,•COMMENDATIONS OR THE U,,CAL CROSS-CONNECTION CONTRO PROGRAM, WHICHEVER IS MORE SITRINGFNT. CONTACT JOANIE ARTLEY AT (919) 996-5923 0 FEATURE POND I MORE INFORMATION OPEN SPACE `2a nAQ QC: If) Q1 A('1 SSMH 4 OF WAKE FOREST W 118 E F"I is INV IN: 291A0' SSM 2, R 11111 2%02' INV IN: 282,52' INV OUT 289,90' INV OUT� 2KOZ� - f m g 0 p rn C Or/' Public FOR MORE IN.F"-',,RMATION 4z- BEASLEY AT (919) 996-2334 OR ILILM� 'S ARE REQUIRED BASED ON D: 31REE OF HEALTH HAZARD INVOLVE 13 .CROSS-CONNECTION CONTROL PROTECI ION DEVICE. -B OF THE RULES GOVERNING PUBLIC WATER SYSTEMS TNNORTH CAROLINA. THESE GUIDELINE AS LISTED IN APPENDIX A THE MINIMUM REQUIREMENTS, THE DEVICES SHALL MEET AMERICAN SOCIF-Y OF SANITARY ENGINEERING (ASS; RE STANDARDS OR BE ON THE UNIVERSITY OF SOUTHERN CALIFORNIA APPROVA.L LIST. THE DEVICES SHALL B Tzl TH INIIIAL AND PERIODIC TESTING THEREAFTER) WETLAND INSTALLED AND TESTED (BO ACCORDANCE WITH THE MANI TACRIRFR'S R,•COMMENDATIONS OR THE U,,CAL CROSS-CONNECTION CONTRO PROGRAM, WHICHEVER IS MORE SITRINGFNT. CONTACT JOANIE ARTLEY AT (919) 996-5923 0 FEATURE POND I MORE INFORMATION OPEN SPACE `2a nAQ QC: If) Q1 A('1 SSMH 4 OF WAKE FOREST RIM: 300,80' INV IN: 291A0' INV IN: 291.10' ENGINEERING DEPARTMENT INV OUT 289,90' ...... 0 p rn C -7, Or/' Public FOR MORE IN.F"-',,RMATION 4z- BEASLEY AT (919) 996-2334 OR ILILM� 'S ARE REQUIRED BASED ON D: 31REE OF HEALTH HAZARD INVOLVE 13 .CROSS-CONNECTION CONTROL PROTECI ION DEVICE. -B OF THE RULES GOVERNING PUBLIC WATER SYSTEMS TNNORTH CAROLINA. THESE GUIDELINE AS LISTED IN APPENDIX A THE MINIMUM REQUIREMENTS, THE DEVICES SHALL MEET AMERICAN SOCIF-Y OF SANITARY ENGINEERING (ASS; RE STANDARDS OR BE ON THE UNIVERSITY OF SOUTHERN CALIFORNIA APPROVA.L LIST. THE DEVICES SHALL B Tzl TH INIIIAL AND PERIODIC TESTING THEREAFTER) WETLAND INSTALLED AND TESTED (BO ACCORDANCE WITH THE MANI TACRIRFR'S R,•COMMENDATIONS OR THE U,,CAL CROSS-CONNECTION CONTRO PROGRAM, WHICHEVER IS MORE SITRINGFNT. CONTACT JOANIE ARTLEY AT (919) 996-5923 0 FEATURE POND I MORE INFORMATION OPEN SPACE `2a nAQ QC: If) Q1 A('1 W Y'Afiamm, WAW PLA'NNING DEPARTMENT FA-TE I I - �5IIA Ln2— GRAPHIC SCALE DATE 1 inch = 60 ft. THESE PLANS HAVE BEEN APPROVED FOR CONSTRUCTION BY THE TOWN OF WAKE FOREST ENGINEERING DEPARTMENT DAT J, W Y'Afiamm, WAW PLA'NNING DEPARTMENT FA-TE I I - �5IIA Ln2— GRAPHIC SCALE DATE 1 inch = 60 ft. w r °. 0 SLOPE) 7r77v7rTrFW :0 um CAPPED CLEANOUT PIPE # i r LAYER Itr 1 (0.50% OP JIN iF ",,APPED CLEANOUT sr u III "..J.06.0 " III yrari UNDERDRAIN MINIMUM SLOPE) 36" If ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL TOWN OF WAKE FOREST, CITY OF RALEIGH AND OR NCDOT STANDARDS AND SPECIFICATIONS It L �Y 2 " INLET PIPE BYPASS STRUCTURE1 NOT TO SCALE F ° \ A 0. 1 1 P Y 6 4 4 B 8 k p t p 8 g t p� mm r a " WASHED SAND Will DUT ION WOVEN 61616=10 Mlowsm I �'w 4NIHR, PRIOR TO PLACEMENT OF THE PREPARED SOIL, A LABORATORY TEST MUST BE PERFORMED OT PHOSPHORUS AND PERCENT INSTALLATION OF SOILS MUST BE DONE IN A MANNER THAT WILL ENSURE ADEQUATE FILTRATION. AFTER THE INVERT AREA OF THE PROPOSED FACILITY HAS SEEN SCARIFIED, SOIL SHOULD APPLIED IN LIFTS OF 12 INCHES. LIFTS MAY BE APPLIED USING A SMALL TRACK MACHINE WILOW GROUND PRESSURE SUCH AS A MINI HOE. LIFTS MAY BE LIGHTLY WATERED TO ENCOURAGE NATURAL COMPACTION. SOIL MEDIA MUST MAINTAIN AN INFILTRATION RATE OF I TO 2 INIHR AFTER PLACEMENT. SOIL PREPARATION INSTALLATION . « r •« .IN ■C ■L ■ DATE: MARCH 25TH, 201 5 POND DETAILS C -708 LEVEL SPREADER LIP G s LAYER#57 STONE INSTALL EARTHERN BERM « 'r y._...._... ....... ,.. RIPARIAN BUFFER TO CREATE LEVEL SPREADER BLIND SWALE ,iPfi� ^s 9• SIDE SCOPES 21 MAX STORMWATER NI PIPE a'PERFORATED PYG CLASSAR4PdiRF Y;. ,.. BLIND CHANNEL i' "'%" �s j 3 F WIDE STRIP OF UNpERDRAIN TO UNDERDRAPi LINED FOREBAY s . j NONWOVEN C�EO7EX71iE DAYLIGHT FORESAY LINED WITH CLASS A RIP RAF PERFORATED PVC UNDERDRAIN P" FABRIC ' WV CONCRETE FOOTER SECTION VIEW CONCRETE LEVEL SPREADER LIP T WIDE 3' THICK R57 jTONE ON 0 NONWOVEN GEOTEX7,I EFABRIC INLET RIPE TO LEVEL SPREADER i FT PLAN VIEW NONWOVEN GEOTEXTILE FABRIC GLASS A RIP RAP LEVEL SPREADER A LENGTH CONCRETE LIP ELEVATION FOREBAY SUFRACE AREA FOREBAY 76 FT ?92.50 117 RE 2 669 313M 94 SF NOT TO SCALE LEVELSPREADER r a " WASHED SAND Will DUT ION WOVEN 61616=10 Mlowsm I �'w 4NIHR, PRIOR TO PLACEMENT OF THE PREPARED SOIL, A LABORATORY TEST MUST BE PERFORMED OT PHOSPHORUS AND PERCENT INSTALLATION OF SOILS MUST BE DONE IN A MANNER THAT WILL ENSURE ADEQUATE FILTRATION. AFTER THE INVERT AREA OF THE PROPOSED FACILITY HAS SEEN SCARIFIED, SOIL SHOULD APPLIED IN LIFTS OF 12 INCHES. LIFTS MAY BE APPLIED USING A SMALL TRACK MACHINE WILOW GROUND PRESSURE SUCH AS A MINI HOE. LIFTS MAY BE LIGHTLY WATERED TO ENCOURAGE NATURAL COMPACTION. SOIL MEDIA MUST MAINTAIN AN INFILTRATION RATE OF I TO 2 INIHR AFTER PLACEMENT. SOIL PREPARATION INSTALLATION . « r •« .IN ■C ■L ■ DATE: MARCH 25TH, 201 5 POND DETAILS C -708