Loading...
HomeMy WebLinkAbout20151069 Ver 1_20151069 Ver 1_PCN rev 11-18-15 pp1 and 7 only_20151118_20151118 Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Section 404 Permit Section 10 Permit Corps: 1b. Specify Nationwide Permit (NWP) number: 18 or General Permit (GP) number: Yes No 1c. Has the NWP or GP number been verified by the Corps? 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification Express Riparian Buffer Authorization For the record only for Corps Permit: 1e. Is this notification solely for the record For the record only for DWQ 401 because written approval is not required? Certification: Yes No Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation Yes No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. below. 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: Rock Barn Solar Farm Project 2b. County: Catawba 2c. Nearest municipality / town: Claremont 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Rock Barn Properties, Inc., 3b. Deed Book and Page No. 2017/1853 3c. Responsible Party (for LLC if William L. Parrish, Jr. Executive Vice President, Rock Barn Properties, Inc., RB Solar, applicable): LLC 3d. Street address: 3763 Golf Dr. NE 3e. City, state, zip: Conover, NC 28613-9455 3f. Telephone no.: (828) 459-7141 3g. Fax no.: 3h. Email address: billparrish@beaversportsinc.com Page 1 of 12 PCN Form Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams - tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ non-404, other) (acres) Temporary (T) Yes Corps W1 P T FILL Seep 0.04 No DWQ Yes Corps W2 P T No DWQ Yes Corps W3 P T No DWQ Yes Corps W4 P T No DWQ Yes Corps W5 P T No DWQ Yes Corps W6 P T No DWQ . Total wetland impacts 2g0.04 2h. Comments: 0.04-acres of permanent impacts to Wetland Unit BW due to fill for solar farm. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3g. 3a. 3b. 3c. 3d. 3e. 3f. Impact Stream impact Type of impact Stream name Perennial Type of jurisdiction Average length number -(PER) or stream (Corps - 404, 10 (linear Permanent (P) or intermittent width DWQ non-404, feet) Temporary (T) (INT)? (feet) other) PER Corps S1 P T Pipe UT-1 Lyle Creek 494 INT DWQ PER Corps S2 P T INT DWQ PER Corps S3 P T INT DWQ PER Corps S4 P T INT DWQ PER Corps S5 P T INT DWQ PER Corps S6 P T INT DWQ Total stream and tributary impacts 3h. 94 3i. Comments: 94 linear feet of permanent impacts to UT-1 Lyle Creek due to new 84 x 60 HDPE and 10 riprap apron. Page 7 of 14