HomeMy WebLinkAboutNCC205141_NOT Closeout Documents_20240313 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
County: Brunswick Project: Ibis Landing-DR Horton Lots River basin: Cape Fear
Person financially responsible:D.R.Horton,Inc-Elizabeth Shelton,Manager/ Project#: BRUNS-2021-027
VP
Address: 6752 Parker Farm Dr.,Suite 210,Wilmington,NC
1. Project Location: Highway 17,Leland
Pictures: No
2. Weather and soil conditions: sunny and workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: March 13,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at deq.nc.gov/NCG01.Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Creighton Brown e.c�rL 5- 'V - Others present:
Date of inspection: March 12,2024 Time arriving on site: 12:50 PM Time leaving site: 12:55 PM
CC: