Loading...
HomeMy WebLinkAboutNCC204393_NOT Closeout Documents_20240313 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Franklin Project: Stephen's Glen Phases Lots 1-15 River basin: Tar-Pamlico Person financially responsible:GF Moody Properties.LLC-Frank Moody, Project#: FRANK-2019-023 Owner Address: PO Box 926,Dunn,NC 28335 1. Project Location: Hicks Road,Youngsville Pictures: No 2. Weather and soil conditions: Overcast,Rainy,Not Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: March 07,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGO1-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Mattie Frazier Others present: Celina Amaya Date of inspection: March 06,2024 Time arriving on site: 3:00 PM Time leaving site: 3:10 PM cc: