Loading...
HomeMy WebLinkAboutNC0065587_Draft_Fact Sheet_20240319 NCDEQ/DWR/NPDES EXPEDITED FACT SHEET - NPDES PERMIT RENEWAL NPDES Permit NCO065587 Caroline Robinson/Compliance&Expedited Permitting Unit/caroline.robinson@deq.nc.gov/March 2024 FACILITY INFORMATION Aqua North Carolina,Inc. (Lauren Raup-Plummer,Engineering Applicant/Facility Name Manager) Frye Bridge WWTP Applicant Address/Mailing 202 Mackenan Court,Cary,NC 27511 Address Facility Physical Address NCSR 2998, Clemmons,NC 27012 Permitted Flow(MGD) 0.027 MGD Type of Waste 100%Domestic,< 1 MGD Facility Class WW-2 County Forsyth Permit Status Renewal Regional Office SRO STREAM CHARACTERISTICS Receiving Stream Muddy Creek Stream C Classification Stream Segment 12-94-(0.5) Outfall Lat. 350 59' 18"N 7Q10 - Summer(cfs) 0 Outfall Long. 800 21' 15" W 7Q 10 -Winter(cfs) 0.06 Drainage basin Yadkin-Pee Dee River Basin 30Q2 (cfs) 0 Subbasin 03-07-04 Average Flow(cfs) 0.2 HUC 030401011308 IWC (%) 100%(summer)/ 303(d)List No 41.09%(winter) BASIC INFO FOR EXPEDITED PERMIT RENEWAL Does permit need Daily Max NH3 limits? No—Already present in permit. Does permit need TRC limits/footnote? No—Already present in permit. Does permit have toxicity testing? No—Not a complex wastestream Does permit have any Special Conditions? Yes,Nutrient Reopener for High Rock Lake Does permit have instream monitoring? Yes—U&D for Dissolved Oxygen New expiration date: May 31,2029 FACILITY SUMMARY Aqua North Carolina,Inc. operates a 100%domestic wastewater treatment plant for an estimated 145 residents. The Frye Bridge WWTP is a minor facility(flow< 1 MGD)with a design capacity and permitted wastewater discharge of 0.027 MGD. The NPDES permit for this WWTP was originally issued in August 1986. This facility utilizes the following treatment components: • Equalization basin with Bar screen • Aeration basin • Clarifier • Aerated sludge holding tank • Chlorine contact chamber • De-chlorination • Post-aeration Fact Sheet for Permit Renewal March 2024-NPDES Permit NCO065587-Page 1 RENEWAL SUMMARY This renewal contains the following changes: • Updated eDMR language for electronic data submission in Part I. A. (3). • Updated Map COMPLIANCE HISTORY Frye Bridge WWTP has had no enforcements on record during the current permit cycle that became effective in July 2019. The facility has been issued two NODS for a flow monthly average limit violation in October 2023 and a reporting violation for a Late/Missing DMR in October 2023 since the permit was originally issued in July 2019. Most recent inspection(September 2023) showed the facility to be out of compliance because the flow meter was not calibrated as required. The flow meter was calibrated on October 3,2023. Fact Sheet for Permit Renewal March 2024-NPDES Permit NCO065587-Page 2