HomeMy WebLinkAboutNC0065587_Draft_Fact Sheet_20240319 NCDEQ/DWR/NPDES
EXPEDITED FACT SHEET - NPDES PERMIT RENEWAL
NPDES Permit NCO065587
Caroline Robinson/Compliance&Expedited Permitting Unit/caroline.robinson@deq.nc.gov/March 2024
FACILITY INFORMATION
Aqua North Carolina,Inc. (Lauren Raup-Plummer,Engineering
Applicant/Facility Name Manager)
Frye Bridge WWTP
Applicant Address/Mailing 202 Mackenan Court,Cary,NC 27511
Address
Facility Physical Address NCSR 2998, Clemmons,NC 27012
Permitted Flow(MGD) 0.027 MGD
Type of Waste 100%Domestic,< 1 MGD
Facility Class WW-2 County Forsyth
Permit Status Renewal Regional Office SRO
STREAM CHARACTERISTICS
Receiving Stream Muddy Creek Stream C
Classification
Stream Segment 12-94-(0.5) Outfall Lat. 350 59' 18"N
7Q10 - Summer(cfs) 0 Outfall Long. 800 21' 15" W
7Q 10 -Winter(cfs) 0.06 Drainage basin Yadkin-Pee Dee River Basin
30Q2 (cfs) 0 Subbasin 03-07-04
Average Flow(cfs) 0.2 HUC 030401011308
IWC (%) 100%(summer)/ 303(d)List No
41.09%(winter)
BASIC INFO FOR EXPEDITED PERMIT RENEWAL
Does permit need Daily Max NH3 limits? No—Already present in permit.
Does permit need TRC limits/footnote? No—Already present in permit.
Does permit have toxicity testing? No—Not a complex wastestream
Does permit have any Special Conditions? Yes,Nutrient Reopener for High Rock Lake
Does permit have instream monitoring? Yes—U&D for Dissolved Oxygen
New expiration date: May 31,2029
FACILITY SUMMARY
Aqua North Carolina,Inc. operates a 100%domestic wastewater treatment plant for an estimated 145
residents. The Frye Bridge WWTP is a minor facility(flow< 1 MGD)with a design capacity and permitted
wastewater discharge of 0.027 MGD. The NPDES permit for this WWTP was originally issued in August
1986. This facility utilizes the following treatment components:
• Equalization basin with Bar screen
• Aeration basin
• Clarifier
• Aerated sludge holding tank
• Chlorine contact chamber
• De-chlorination
• Post-aeration
Fact Sheet for Permit Renewal
March 2024-NPDES Permit NCO065587-Page 1
RENEWAL SUMMARY
This renewal contains the following changes:
• Updated eDMR language for electronic data submission in Part I. A. (3).
• Updated Map
COMPLIANCE HISTORY
Frye Bridge WWTP has had no enforcements on record during the current permit cycle that became
effective in July 2019. The facility has been issued two NODS for a flow monthly average limit violation in
October 2023 and a reporting violation for a Late/Missing DMR in October 2023 since the permit was
originally issued in July 2019.
Most recent inspection(September 2023) showed the facility to be out of compliance because the flow
meter was not calibrated as required. The flow meter was calibrated on October 3,2023.
Fact Sheet for Permit Renewal
March 2024-NPDES Permit NCO065587-Page 2