HomeMy WebLinkAbout20231323 Ver 1_Resp to RFAI_20240315Sti m m e I N. Trade Street date: 03/15/2024 job #: 22-001
Sui
Suite 200
Winston Salem, NC project: Cone Health MedCenter Asheboro
Landscape Architecture 27101-2916
Civil Engineering scale: 1" = 300' sheet 1 Of 6
g g P:336.723.1067
Stimmel Associates, PA Land Planning F: 336.723.1069 description: OVERALL WETLAND AND WOTUS IMPACTS
EXHIBIT
ERO RD1. �p S�—-------
Ir
' --�
f
i'
I
I '
IMPACT #1 oticno
o
II
___________________i'r
II
II
II
II
II
' I
III
jj
II
� III I I
i
— — — — —
II
N.
II
II
II
II
II
II
r
ill^•;a
11
II \
TEMPORARY IMPACT #S1 ,
II I
II /
/ 1 11I
II i
/ TEMPORARY
-7 IMPACT #S2
O ;' TEMPORARY
IMPACT #4
1
MATCHLINE: TA: 14+00
Sti m m e I N. Trade Street date: 03/15/2024 job #: 22-001
Sui
Suite 200
Winston Salem, NC project: Cone Health MedCenter Asheboro
Landscape Architecture 27101-2916
Civil Engineering scale: 1" = 200' sheet 2 Of 6
g g P:336.723.1067
Stimmel Associates, PA Land Planning F: 336.723.1069 description: OVERALL WETLAND AND WOTUS IMPACTS
EXHIBIT
,1
� 1
1;
1
,1
I,p
1�1'I
w
A
1
III',I
C
MATCHLINE: SETA: 14+00
+
x
1 i','' -
1
N
C
z
"'�R�I�FIi''',
•
.tea«„
�
i�
�ZL
PROP. 6" FORCEMAIN
PROP. 6" FORCEMAIN TIES INTO
EX. SANITARY SEWER MANHOLE.
END OF PROJECT.
S t i m m e I N. Trade street date: 03/15/2024 jOb #: 22-001
Sui
Suite 200
� Winston Salem, NC project: Cone Health MedCenter Asheboro
Landscape Architecture 27101-2916
Civil Engineering scale: 1" = 30' sheet 3 Of 6
P: 336.723.1067
Stimmel Associates, PA Land Planning F: 336.723.1069 description: WETLAND IMPACT #1
EXHIBIT
SPERO ROAD
12' WIDE GRAVEL PUMP STATION
\\ \ ACCESS ROAD
00
WL
IMPACT #1 -
PUMP STATION ACCESS ROAD WETLAND IMPACTS:
5 SF (.013 AC) IMPACT WITHIN WETLAND W3 (PER THE
WETLAND AND WOTUS DELINEATION REPORT)
PERMANENT IMPACTS:
PERMANENT FILL
IMPACT #1: ACCESS ROAD PLAN AND PROFILE
SCALE: 1" = 100'
685
595 SF
\ \ WETLAND IMPACT
680 - - - -
A C ESS ROAD
GRADE
675
POK EXISTING
GRADE
670
0+00
34"WHO
/t -
1+00 2+00
680 I I
I ' /
675 l i
670
3+00
I �
Sti m m e I N. Trade Street date: 03/15/2024 job #: 22-001
Sui
Suite 200
Winston Salem, NC project: Cone Health MedCenter Asheboro
Landscape Architecture 27101-2916
Civil Engineering scale: 1" = 30' sheet 4 Of 6
g g P:336.723.1067
Stimmel Associates, PA Land Planning F: 336.723.1069 description: STREAM IMPACT #S1
EXHIBIT
20' SANITARY SEWER EASEMENT
TEMPORARY IMPACT #S1�
6" FORCEMAIN STREAM IMPACTS:
200 SF (.004 AC) IMPACT WITHIN PERENNIAL/
TRIBUTARY T2 (MCDOWELL CREEK) (PERTHE
WETLAND AND WOTUS DELINEATION REPORT)
TEMPORARY IMPACT�WTH NIMPACT
FOOTPRINT:
CLEARING VEGETATION
/,F6R CONSTRUCTION,
TEMPORARY CULVE5T WILL BE INSTALLED IN
THE STREAM FOR ACCESS ACROSS. SEE
/ DETAIL ON SHEET 6.
LINE WILL BE INSTALLED WITH AN OPEN CUT
/AND THEN BACKFILLED TO
PRE -CONSTRUCTION GRADE.
660
650
640
630 L i
4+00
2
LL
MCDOWELL CREEK
i
TEMP. IMPACT #S1: FM PLAN AND PROFILE
SCALE: 1" = 100'
5+00
D 777 D D D D D D D D D D O C
0'7 '7 '7 '7 '7 '7 '7 '7 '7 0 7 0 7
0000000000000�
'7 '7 '7 '7 0'7 0'7 '7 '7 0
7
'7 7
'7 7
'7 D '7 '7
'7 '7
C
o000000000000
D D D D D D D D D D D D D D D O C
'7 '7 '7 '7 '7 '7 '7 '7 '7 '7 '7 '7 0 7 0 7
'7 D '7D '7D '7D D D D D D V D O C
000000000000
0 0 0 0 0 0 0 0 7 0
0000�o� o o
\ \ \
660
00 \ \
650PACT
\ \ \
640
630 \
6+00 _
601 N. Trade Street
Stimmel
200
Wintston Salem, INC
Landscape Architecture
27101-2916
Civil Engineering
StimmeI Associates, PA Land Planning
P: 336.723.1067
F: 336.723.1069
EXHIBIT
date: 03/15/2024 job #: 22-001
project: Cone Health MedCenter Asheboro
scale: 1" = 30' sheet 5 Of 6
description: WETLAND AND STREAM IMPACTS #S2 & #4
I n J -"-
+I
6" FORCEMAIN
N
I I
�I
I
TEMPORARY IMPACT #S2
III
I
6" FORCEMAIN STREAM IMPACTS:
100 SF (.002 AC) IMPACT WITHIN IMTERMITTENT TRIBUTARY T3
(PER THE WETLAND AND WOTUS DELINEATION REPORT)
TEMPORARY IMPACTS WITHIN IMPACT FOOTPRINT:
11'
I I
CLEARING VEGETATION FOR CONSTRUCTION,
TEMPORARY CULVERT WILL BE INSTALLED IN THE STREAM
FOR ACCESS ACROSS. SEE DETAIL ON SHEET 6
LINE WILL BE INSTALLED WITH AN OPEN CUT AND THEN
.n I I I
BACKFILLED TO PRE -CONSTRUCTION GRADE.
I I I
I
TRIBUTARY T3
TEMPORARY IMPACT #
I I
\
6" FORCEMAIN WETLAND IMPACTS:
n
247 SF (.006 AC) IMPACT WITHIN WETLAND W5 (PER THE WETLAND
AND WOTUS DELINEATION REPORT)
° I
I
TEMPORARY IMPACTS WITHIN IMPACT FOOTPRINT:
° '7
CLEARING VEGETATION FOR CONSTRUCTION,
I
LINE WILL BE INSTALLED WITH AN OPEN CUT AND THEN BACKFILLED
I I
TO PRE -CONSTRUCTION GRADE.
I I
II
� � I
TEMP. IMPACTS #S2 AND #4: FM PLAN AND PROFILE
660 SCALE: 1" = 100' 660
I I
I
I
7
W
EXISITING GRADE
II
N
650 650
I I
zD
EX. DIRT PATH
STREAM IMPACT
IMPACT
20 LF
WETUND IMPACT
I
I
I
640 640
I
MIN
3w .
D�R
PRI.L. ."VI LFROF D. R.
I
I I
6" FORCEMAIN
I I
630 630
I I I
12+00 13+00 14+00
I
601 N. Trade Street
Stimmel
200
Wintston Salem, NC
Landscape Architecture
27101-2916
Civil Engineering
StimmeI Associates, PA Land Planning
P: 336.723.1067
F: 336.723.1069
EXHIBIT
date: 03/15/2024 job #: 22-001
project: Cone Health MedCenter Asheboro
scale: NTS sheet 6 Of 6
description: TEMPORARY STREAM CROSSING DETAIL
1/2 DIAMETER OF PIPE
6" SURGE STONE (MIN.) CLASS B RIPRAP INFlLL
OR 24" WHICHEVER IS
d50= 9"
GREATER
NOTE: CONTRACTOR SHALL
FILTER FABRIC
CONSULT WITH PUMP PROVIDER
NCDOT TYPE 2
TO DETERMINE PUMP TYPE AND
CAPACITY. PUMP SHALL BE
SUFFICIENT TO CARRY BASE FLOW
—1 1 1-1
1 1-1 I I
_
1 1 1—I I I— OF STREAM.
HDPE CULVERT (S) 7.1
I IT
III IIIII
SEE PLAN VIEW FOR SIZE AND
NUMBER OF CULVERTS ELEVATION
WASHED Q57 STONE PIPE
BEDDING AS REQUIRED
S1
SURGE STONE
SAND BAG UPSTREAM OF CULVERT AND PUMP
FLOW - BASE FLOW AROUND WORK AREA TO ALLOW
INSTALLATION OF CULVERTS.
1 1 HDPE CULVERT (S)
SEE THIS DETAIL FOR NUMBER
AND DIAMETER OF CULVERTS
CLASS B RIPRAP INFlLL
.. ...- d50= 9"
po o 0o o O° (,Q'
°o
00°00
O
O Ooo
�O
pp OGi�O O
0000.p.°0°O o .
0 0o a0 0 °
000
0p°0 °O
°00 o pd� °O
STREAM CROSSING SEQUENCE o�p°o A 0 0�
b o
0Q� o
°pc op00.0°
0+0000
0 0
O O }
0 0 p O° 0 0
°0 �..O0 °p0 O
pogo
00, O.p O
p.. Co
00°0 Oa °'0o °
0
1. SANDBAG UPSTREAM AND DOWNSTREAM OF
TEMPORARY CULVERTS. 0000 0 °O
00.0po
° 00
OOp
p 0 o0°
00 00 O oo
o
p o O
2. PUMP STREAM BASE FLOW AROUND THE 0O .000 °
0 00 °
° O
O
00oO
O
�° p
O
0' od:
o o p°0p0
0
°O' °
CONSTRUCTION WITHIN THE STREAM. °O0
1 INSTALLTHE CULVERT(S) AND BACKFILL WITH STONE O ° 0 0� O 0'
0°o
0. 00
o
.0 ° p o o0
O
0 O. 0
O p PC,
0° 0 0 ° .0 6o
AS SHOWN IN THE DETAIL.0
p0
4. REMOVE UPSTREAM SANDBAGS TO ALLOW FLOW
THROUGH THE TEMPORARY CULVERTS.
5. RE -INSTALL THE SANDBAGS PRIOR TO THE
FORCEMAIN INSTALLATION AND PUMP STREAM BASE
FLOW AROUND THE STREAM CROSSING.
6. TRENCH UNDER THE TEMPORARY CULVERTS TO
INSTALL THE FORCEMAIN. TOP OF BANK
7. RESTORE DISTURBED STREAM BANK TO THE
PL
N
TOP OF BANK
ORIGINAL CONDITION.
B. REMOVE SANDBAGS TO ALLOW STREAM TO FLOW
PROPOSED
THROUGH CULVERTS.
FORCE MAIN
10'x10' DEWATERING/SEDIMENTATION
BASIN WITH 2:1 SIDE SLOPES
SAND BAG DOWNSTREAM OF CULVERT DURING CULVERT INSTALLATION
".
AND FORCE MAIN INSTALLATION.
SAND BAG CAN BE REMOVED TO PASS STREAM BASE FLOW WHEN NO
CONSTRUCTION WIHTIN STREAM BANK.
STREAM CROSSING
PIPE DIAMETER
# OF PIPES
S1
18"
1
S2
20"
1
TEMPORARY STREAM CROSSING