Loading...
HomeMy WebLinkAbout20240420 Ver 1_NMFS Response on Moratorium Relief 2-28-24_20240315From: Fritz Rohde - NOAA Federal To: Doliber. Brian C Subject: [External] Re: NC DOT Ferry- Shipyard Pile Cluster Maintenance Date: Wednesday, February 28, 2024 9:29:59 AM CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Brian Twyla has moved on to another agency. NMFS is ok with your request to do this work during moratorium. Fritz Sent from my iPhone On Feb 27, 2024, at 2:05 PM, Doliber, Brian C <bcdoliber@ncdot.gov> wrote: Good afternoon Twyla, I am attempting this as an email just to you and Fritz because it kept getting kicked back to me on the chain with DMF/WRC/FWS. The Ferry Division is requesting moratorium relief to perform maintenance and repair on 7 exiting pile clusters, and to install two new piles, at the Manns Harbor Shipyard from late March through April 2024. Our Skyco Crane Barge will be returning to the water following repairs in mid -March and we would like to address these piling issues prior to it leaving the Shipyard for otherwork. I put a brief description of the work below and also attached maps depicting the proposed work. There are a number of pile clusters adjacent to the Syncrolift that are in very poor condition. These need to be repaired or replaced to allow vessels to safely navigate to and from the Syncrolift, and the docking area immediately east of the Syncrolift. Pile clusters DSY438, DSY439, and DSY445 abut the bulkhead and currently consist of multiple wooden piles. These would be replaced with single 24" steel tube piles that would be located within the same footprint. Pile clusters DSY440, DSY441, and DSY442 currently consist of a 24" steel tube pile with multiple wooden pilings surrounding and secured to the steel tube. These pile clusters would be completely removed and replaced in kind within the same footprint. Pile cluster DSY443 currently consists of multiple wooden pilings. Two of the existing piles would be removed and replaced with two new wooden piles of equal size within the same footprint. Two new24" steel tube piles would be installed along the bulkhead to the east of the Syncrolift. This area serves as a tie-up slip for vessels and more protection is needed for both the bulkhead and the vessels. No piles currently exist at the proposed locations. A vibratory hammer, along with a clamshell bucket, will be utilized to remove and install all piles. This work would begin in late March 2024 and be completed by May 1, 2024 Jimmy and Gary please also feel free to respond to this request. I addressed it to Travis and Twyla due to this being WRC jurisdiction and the FWS deferring to NMFS during previous projects. Thanl<you, Brian Doliber Environmental Program Supervisor/Facility Maintenance Coordinator Ferry Division 252 232 8025 mobile 252 621 6251 office bcdoliber o-Mcdot.aov 159 Lucinda Lane Powells Point, NC 27966 <image001.png> Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. <Shipyard Pile Work -Location Maps.pdf>