Loading...
HomeMy WebLinkAbout20240420 Ver 1_CAMA Permit 12-87- Pile Maintenance, Repair & Install_20240315STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER J.R. " JOEY" HOPKINS GOVERNOR SECRETARY March 15, 2024 Greg Daisey Coastal Management — Transportation Projects NCDEQ DCM — Elizabeth City 401 S. Griffin Street, Suite 300 Elizabeth City, NC 27909 Mr. Daisey, The North Carolina Department of Transportation (NCDOT) Ferry Division is requesting authorization to perform maintenance and repair on seven pile clusters, and install two new piles, at the Maims Harbor Shipyard. The Skyco Crane Barge that is used to remove and install piles throughout the Ferry Division is currently undergoing repairs at the Shipyard that are scheduled to be completed in mid -March. There are a number of pile clusters adjacent to the Syncrolift that are in very poor condition. These need to be repaired or replaced to allow vessels to safely navigate to and from the Syncrolift, and the docking area immediately east of the Syncrolift. Pile clusters DSY438, DSY439, and DSY445 abut the bulkhead and currently consist of multiple wooden piles. These would be replaced with single 24" steel tube piles that would be located within the same footprint. Pile clusters DSY440, DSY 441, and DSY442 currently consist of a 24" steel tube pile with multiple wooden pilings surrounding and secured to the steel tube. These pile clusters would be completely removed and replaced in kind within the same footprint. Pile cluster DSY443 currently consists of multiple wooden pilings. Two of the existing piles would be removed and replaced with two new wooden piles of equal size within the same footprint. Two new 24" steel tube piles would be installed along the bulkhead to the east of the Syncrolift. This area serves as a tie-up slip for vessels and more protection is needed for both the bulkhead and the vessels. No piles currently exist at the proposed locations. A vibratory hammer, along with a clamshell bucket, will be utilized to remove and install all piles. This work would begin in early April 2024 and be completed by early May 2024. The moratorium for Spencer Creek runs from February 1-October 31 so moratorium relief was requested from the resource agencies. Their responses are attached to this request. The NC WRC and the NMFS have jurisdiction in Spencer Creek, but our plans were also sent to the US FWS and NC DMF. Per the conditions of CAMA Major Permit 12-87 we are notifying you with the below information. A. Original permit- CAMA Major Permit 12-87 B. Two new pile locations proposed C. NA Mailing Address: TELEPHONE: (252) 621-6251 NC DEPARTMENT OF TRANSPORTATION NCDOT FERRY DIVISION CUSTOMER SERVICE: 1-877-368-4968 159 LUCINDA LANE POW ELLS POINT, NC 27966 WEBSITE: NCDOT.GOV D. NA Please use WBS# 16.71001 for any applicable fees. If you have any questions or need any additional information, please contact me. Sincerely, Brian Doliber Environmental Program Supervisor Ferry Division 252 232 8025 mobile 252 6216251 office bcdoliberkncdot. og_v 159 Lucinda Lane Powells Point, NC 27966