Loading...
HomeMy WebLinkAboutSW6231102_Design Calculations_20240315 STORMWATER MANAGEMENT REPORT for BUFFALO CREEK SUBDIVISION Submittal to: NCDEQ STORMWATER PROGRAM Prepared for: GRACELAND DEVELOPMENT, INC. P.O.BOX 531 PARKTON, NC 28371 CONTACT: JOEY PEINFIELD PHONE: (910) 709-8711 Resubmittal Date: March 2024 Prepared by: 0/1 • j1 ! 11 ENGINEERING, PLL C _ r 3417 Winferwind Circle,Sanford,NC 27330 PO Box 249,Sanford,NC 27331 • •rt Phone:(919)352-2834 •� e �� e-mail:jhilliard@hiliiardengineering.com Y •! ��� . i NC License#.P-0836 •••� ����-�•! RAFTING AND DESIGN JarrOd E. Digitally signed ,SRRVICES,INC. by Jarrod E. 6728 Carbonton Road Sanford, NC 27330 Hilliard, Hilliard, PE, CFM (919) 499-8759 PE, CFM Date:2024.03.08 draffinaanddesian@ymail.com 16:16:46 -05'00' DDS Project#2023-07 TABLE OF CONTENTS SECTION PAGE I. EXISTING CONDITIONS A. PROPERTY....................................................................................................I B. WATERSHED.................................................................................................2 C. JURISDICTIONAL WATERS............................................................................2 D. FEMA FLOOPLAIN.......................................................................................2 E. SOILS............................................................................................................2 II. AGENCY STORMWATER REQUIREMENTS A. HOKE COUNTY......................................................................................... .2 B. NCDEQ.........................................................................................................3 III. PROPOSED IMPROVEMENTS A. PROJECT DESCRIPTION................................................................................3 B. LAND DISTURBANCE AND EROSION CONTROL.......................................3 C. IMPERVIOUS SURFACE ...............................................................................3 D. DRAINAGE AND STORMWATER MANAGEMENT.......................................4 APPENDICES A. Computations Minor System Grass Conveyance Swales Erosion Control B. Maps Inlet Drainage Area Erosion Control Drainage Area C. Soil Survey Map D. FEMA FIRM Map E. USGS MAP F. STORMWATER FORMS SUPPLEMENT-EZ OPERATION & MAINTENANCE AGREEMENT BMP SUPPLEMENT FORMS I. EXISTING CONDITIONS A. PROPERTY The proposed project site is on o n e 52.2 AC p a rc e I (PIN# 5849-40-00- 1096) in Hoke County. The property is currently undeveloped farm land with no impervious surfaces. The following is a summary of the adjacent properties: To the north, undeveloped (zoning R-20) To the south, undeveloped (zoning R-20) To the west, undeveloped (zoning R-20) To the east, single family and undeveloped (zoning R-20) See Figure 1 below for an aerial view of the property for the proposed Buffalo Creek Subdivision project (Site). Figure 1:Aerial view of pre-developed site is ` 49�+r Stormwater Impact Analysis Page 1 1 4 B. WATERSHED The site is located in the Gully Branch Watershed and Lumber River Basin. The NCDEQ Stream Index for Buffalo Creek is 14-2.5 and Stream Classification for Buffalo Creek is `C'. C. JURISDICTIONAL WATERS There are no jurisdictional streams located on the site. There are no impacts proposed with this project to jurisdictional streams or wetlands. D. FEMA FLOODPLAIN There are FEMA mapped floodplains located on the site per FIRM Panel 37108488400L, effective date July 7, 2007. See Appendix D for FEMA FIRM maps. E. SOILS Refer to Appendix C for the NRCS map showing anticipated on-site soils. II. AGENCY STORMWATER REQUIREMENTS A. Hoke County Section 3.7 `Storm Drainage Not in Public Streets" of the Hoke County Subdivision Ordinance details the requirements for managing stormwater from new construction sites. Section 3.3 `Streets" of the Hoke County Subdivision Ordinance details the requirements for managing stormwater from new construction sites per NCDOT requirements. Stormwater Impact Analysis Page 2 1 4 B. NCDEQ Hoke County is a `tipped' county and new projects located within the county must meet NCDEQ Post Construction Stormwater Phase 2 regulations. Site requirements for stormwater control are different if the proposed development is `high density' (greater than 24%impervious) or `low density' (less than 24% impervious). III. PROPOSED IMPROVEMENTS A. PROJECT DESCRIPTION The proposed project will create fourty-Seven (47) single family lots (min 20,000 sf). The proposed project will add additional roads the Hoke County road system. The design follows the Preliminary Plat that was recently approved by Hoke County. As part of this project, public waterwill be extended to serve the new lots. B. LAND DISTURBANCE AND EROSION CONTROL The proposed disturbed area for the proposed project is 36.0 AC +/-. A NCDEQ Land Disturbance (Erosion Control) Permit will be obtained prior to beginning work. C. IMPERVIOUS SURFACE The proposed total amount of impervious surfaces for this project is 7.41 AC. This includes pavement and curb & gutters in the public R/W and driveways and rooftops on each lot. The resulting percent impervious (or built-upon) of 14.2% of the total property area. A maximum amount of 3,500 SF of impervious area is allocated to each lot. Thus, this development is classified as `low density' under NCDEQ Phase II regulations. Stormwater Impact Analysis Page 3 1 4 D. DRAINAGE AND STORMWATER MANAGEMENT i. Roadway Drainage -Major System The proposed roadway will have curb and gutter. Catch basins in the gutter line will provide the roadway drainage. Catch basins were spaced based on gutter spread not exceeding one-half lane width during a 4 in/hr storm (NCDOT guidelines). The minor pipe system is sized based on 10-year storm flow and cross-pipes are sized based on 25-year storm flow not exceeding the hydraulic capacity of each pipe segment (as open channel flow, that is, non- pressure flow). ii. Grass Conveyance Swales/Dispersed Flow As stated in Section III. C. above, proposed impervious is less than 24% and, therefore is classified as `Low Density' per NCDEQ regulations. Per NCDEQ guidance, Grass swales/dispersed flow are proposed to receive runoff collected by the catch basins in the road system to help treat the runoff before being discharged to the jurisdictional waters. These swales/dispersed flow areas have a longitudinal slope of 0.0% to 1.0%that discharge into an existing drainage swale to the south. There are Three (3) proposed grass outlets, each with a length greater than 100 LF. Methodology and computations Refer to Appendix A for storm drainage and stormwater management computations. Hydrologic computations were based on the Rational Method for storm drainage and SCS method for stormwater management. Rainfall intensity was determined based on data of the closest rainfall gauge listed on the NOAA website. Drainage areas were delineated based on a combination of field and LIDAR topography. Stormwater Impact Analysis Page 4 1 4 APPENDIX A pmMmm C hunfl g Qum C @Rw@v(gRC@ swdag Cyr g&H CEO trd Mnw spftm 3/5/24,8:44 AM PF Map:Contiguous US www.nws.noaa.gov � • � - yiR7#E �.. I 10 a � F • f4. Home rg1 Search NWS O All NOAA Go General Information NOAAATLAS 14 POINT PRECIPITATION FREQUENCY ESTIMATES: NC Homepage Progress Reports Data description FAQ Glossary Data type: Precipitation intensity v Units: English v Time series type: Partial duration v Precipitation Select location Frequency Data Server 1)Manually: GIS Grids a)By location(decimal degrees,use""for S and W): Latitude:�-Longitude:O Submit Maps Time Series b)By station(list of NC stations): Select station v Temporals Documents c)By address Hoke County,NC,USA X Q Probable Maximum Precipitation 2)Use map: Documents Lal� Miscellaneous Map v a)Select location Publications Terrain Move crosshair or double click Storm Analysis Record Precipitation s b)Click on station icon ❑Show stations on map 4 Contact Us Inquiries Location information: Name:Hoke County,North Carolina, USA•gLN, USA* Latitude:35.0174- Longitude:-79.2372' f =ea I c o. Elevation:260 ft** I ho z ` -� .¢ayNi4ta Vtdl. 211i ��Ld01�J_ ��P Jtr f _ x 2km .....o-, 'diet; c° *Source ESRI Maps 1mi Raeford **Source:USGS C e�o-.l Ave POINT PRECIPITATION FREQUENCY(PF) ESTIMATES https://hdsc.nws.noaa.gov/pfds/pfds_map_cont.html?bkmrk=nc 1/3 3/5/24,8:44 AM PF Map:Contiguous US WITH 90%CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14,Volume 2,Version 3 8 Print page PF tabular PF graphical Supplementary information PDS-based precipitation frequency estimates with 90%confidence intervals(in inches/hoi Average recurrence interval(years) Duration���������� 1 2 5 10 25 50 100 200 500 1000 5-min 5.23 6.18 7.21 7.98 8.89 9.56 10.2 10.8 11.5 12.1 (4.76-5.78) (5.63-6.83) (6.55-7.97) (7.24-8.80) (8.04-9.78) (8.62-10.5) (9.13-11.2) (9.61-11.8) (10.2-12.6) (10.6-13.3) 10-min 4.18 4.94 5.77 6.38 7.09 7.61 8.10 8.54 9.10 9.50 (3.80-4.62) (4.50-5.47) (5.25-6.38) (5.79-7.03) (6.40-7.80) (6.86-8.36) (7.25-8.89) (7.62-9.38) (8.05-10.0) 15-min 3.48 4.14 4.87 5.38 5.99 6.42 6.82 7.19 7.64 7.96 (3.17-3.85) (3.77-4.58) (4.43-5.38) (4.88-5.93) (5.41-6.59) (5.79-7.06) (6.12-7.49) (6.41-7.89) (6.75-8.38) (6.99-8.74) 30-min 2.39 2.86 3.46 3.90 4.44 4.84 5.23 5.59 6.08 6.44 (2.17-2.64) (2.61-3.16) (3.14-3.82) (3.54-4.30) (4.01-4.88) (4.36-5.32) (4.68-5.74) (4.99-6.14) (5.37-6.67) (5.66-7.07) 60-min 1.49 1.80 2.22 2.54 2.95 3.28 3.60 3.92 4.36 4.70 (1.36-1.65) (1.64-1.98) (2.02-2.45) (2.30-2.80) (2.67-3.25) (2.96-3.60) (3.22-3.95) (3.50-4.31) (3.85-4.79) 2-hr 0.870 1.05 1.32 1.53 1.81 2.03 2.25 2.48 2.79 3.03 (0.785-0.974) 11 (0.952-1.18) (1.19-1.48) (1.38-1.71) (1.62-2.02) (1.81-2.26) (2.00-2.51) (2.18-2.76) (2.43-3.10) (2.62-3.38) 3-hr 0.613 0.742 0.937 1.09 1.31 1.48 1.66 1.85 2.12 2.34 (0.553-0.688) (0.670-0.833) (0.845-1.05) (0.982-1.22) (1.17-1.46) (1.31-1.65) (1.46-1.85) (1.62-2.06) (1.83-2.36) (2.00-2.60) 6-hr 0.366 0.443 0.560 0.654 0.785 0.892 1.00 1.12 1.29 1.43 (0.332-0.408) (0.402-0.493) (0.507-0.621) (0.590-0.725) (0.703-0.868) (0.793-0.985) (0.886-1.11) (0.982-1.24) (1.12-1.42) (1.22-1.57) 12-hr 0.214 0.260 77 0.329 0.387 7F 0.467 0.535 0.606 77 0.682 0.792 77 0.882 (0.194-0.239) (0.235-0.289) (0.297-0.367) (0.348-0.430) (0.417-0.517) (0.473-0.590) (0.531-0.668) (0.592-0.751) (0.676-0.872) (0.743-0.970) 24-hr 0.126 0.153 0.194 0.226 0.271 0.307 0.343 0.382 0.434 0.476 (0.117-0.137) (0.142-0.166) (0.179-0.210) (0.209-0.244) (0.249-0.292) (0.281-0.331) (0.314-0.371) (0.348-0.412) (0.394-0.469) (0.430-0.514) 2-day 0.073 0.088 0.111 0.129 0.154 0.174 0.194 0.215 0.244 0.267 (0.068-0.079) (0.082-0.095) (0.103-0.120) (0.120-0.139) (0.142-0.165) (0.160-0.187) (0.178-0.209) (0.197-0.232) (0.222-0.263) (0.242-0.288) 3-day 0.052 0.062 0.078 0.090 0.107 0.121 0.135 0.149 0.169 0.185 (0.048-0.055) (0.058-0.067) (0.073-0.083) (0.084-0.097) (0.099-0.115) (0.112-0.129) (0.124-0.145) (0.137-0.160) (0.155-0.182) (0.168-0.199) 4-day 0.041 0.049 0.061 0.071 0.084 0.095 0.105 0.117 0.132 0.144 (0.038-0.044) (0.046-0.053) (0.057-0.065) (0.066-0.076) (0.078-0.090) (0.088-0.101) (0.097-0.112) (0.107-0.124) (0.121-0.141) (0.131-0.154) 7-day 0.027 0.032 0.040 0.046 0.054 0.060 0.067 0.074 0.083 0.090 (0.025-0.029) (0.030-0.035) (0.037-0.043) (0.043-0.049) (0.050-0.058) (0.056-0.064) (0.062-0.072) (0.068-0.079) (0.076-0.089) (0.083-0.097) 10-day 0.022 0.026 0.031 0.035 0.041 0.046 0.050 0.055 0.061 0.066 (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.033-0.038) (0.039-0.044) (0.043-0.049) (0.047-0.054) (0.051-0.059) (0.057-0.065) (0.061-0.071) 20-day 0.014 0.017 0.020 0.023 0.026 0.029 0.032 0.035 0.039 0.042 (0.013-0.015) (0.016-0.018) (0.019-0.022) (0.022-0.024) (0.025-0.028) (0.027-0.031) (0.030-0.034) (0.032-0.037) (0.036-0.041) (0.038-0.044) 30-day 0.012 0.014 0.016 0.018 7F 0.021 0.023 0.025 77 0.026 0.029 0.031 (0.011-0.012) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.020-0.022) (0.021-0.024) (0.023-0.026) (0.025-0.028) (0.027-0.031) (0.029-0.033) 45-day 0.010 0.012 0.013 0.015 0.017 0.018 0.019 0.021 0.022 0.024 (0.009-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.016) (0.016-0.018) (0.017-0.019) (0.018-0.021) (0.019-0.022) (0.021-0.024) (0.022-0.025) 60-day 0.009 0.010 0.012 0.013 0.015 0.016 0.017 0.018 0.019 0.020 (0.008-0.009) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.014-0.015) (0.015-0.016) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.019-0.021) EPrectpetaton frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP) nd may be higher than currently valid PMP values. r to NOAAAtlas 14 document for more information. Estimates from the table in CSV format: Precipitation frequency estimates v Submit Main Link Categories: Home IOWP US Department of Commerce Map Disclaimer Privacy Policy National Oceanic and Atmospheric Administration Disclaimer About Us https://hdsc.nws.noaa.gov/pfds/pfds_map_cont.html?bkmrk=nc 2/3 3/5/24,8:44 AM PF Map:Contiguous US National Weather Service Credits Career Opportunities Office of Water Prediction(OWP) Glossary 1325 East West Highway Silver Spring,MD 20910 Page Author.HDSC webmaster Page last modified:April 21,2017 https://hdsc.nws.noaa.gov/pfds/pfds_map_cont.html?bkmrk=nc 3/3 BUFFALO CREEK SUBDIVISION DRAINAGE/GUTTER SPEAD CALCULATIONS Upstream Inlet Pipe Capacity Gutter Gutter Gutter Inlet ID Inlet ID Runoff Drainage Area Inlet Rainfall Pipe Diameter pipe Material Pipe Length(ft) (Full Flow) Total Pipe Flow Total System Pipe Slope Pipe Invert Pipe Invert Inlet ID Elevation(Top) Inlet Elevation Inlet Type =4 in/hr Flow(Total Flow(Total Gutter Spread Notes Coeficient (acres) Intensity`(in/h) (in) (ft,/s) (ft'/s)(1) Flow(ft'/s) (ft/ft) (Upstream)(ft) (Downstream)(fit) (ft)(3) (Invert)(fit) (ft,/s)(2) Intercepted) Bypassed) (fit)(4x6) ft3/s ft3/s CB 123 CB 122 0.35 0.40 7.90 15 PP 26.00 5.85 1.11 1.11 0.0077 296.60 296.40 CB 123 299.91 296.60 NCDOT 840.03 0.56 0.42 0.14 4.00 CB 122 FES 121 0.80 0.09 7.90 15 PP 36.00 8.85 0.57 1.67 0.0167 296.40 295.80 CB 122 299.91 296.40 NCDOT 840.03 0.29 0.24 0.05 2.50 CB 120 CB 119 0.35 0.80 7.90 15 PP 26.00 5.85 2.21 2.21 0.0077 296.27 296.07 CB 120 299.52 296.27 NCDOT 840.03 1.12 0.79 0.47 6.00 CB 119 FES 118 0.80 0.05 7.90 15 PP 36.00 5.85 0.32 2.53 0.0075 296.07 295.80 CB 119 299.52 296.07 NCDOT 840.03 0.16 0.18 0.03 2.50 CB 117 CB 116 0.35 1.00 7.98 15 PP 26.00 5.85 2.79 2.79 0.0077 301.00 300.80 CB 117 304.54 301.00 NCDOT 840.03 1.40 0.82 0.58 5.50 CB 116 FES 115 0.35 0.80 7.98 15 PP 40.00 5.85 2.23 5.03 0.0075 300.80 300.50 CB 116 304.54 300.80 NCDOT 840.03 1.12 0.70 0.42 5.00 CB 114 CB 113 0.35 0.60 7.98 15 PP 26.00 5.85 1.68 1.68 0.0077 298.93 298.73 CB 114 302.42 298.93 NCDOT 840.03 0.84 0.83 0.59 5.50 CB 113 FES 112 0.35 0.40 7.98 15 PP 40.00 4.94 1.12 2.79 0.0050 298.73 298.53 CB 113 302.42 298.73 NCDOT 840.03 0.56 0.63 0.35 5.00 FES 111 CB 110 0.35 3.57 8.89 24 PP 44.00 16.87 11.11 11.11 0.0225 297.64 296.65 FES 111 297.64 CB 110 CB 109 0.35 0.50 7.98 24 PP 26.00 21.50 1.40 12.50 0.0077 296.65 296.45 CB 110 300.62 296.65 NCDOT 840.03 0.70 0.68 0.37 5.50 CB 109 FES 108 0.35 0.80 7.98 24 PP 40.00 17.30 2.23 14.74 0.0050 296.45 296.25 CB 109 300.62 296.45 NCDOT 840.03 DOUBLE 1.12 1.37 0.34 5.00 FES 107 5 CB 106 0.35 4.75 8.89 24 PP 40.00 18.90 14.78 14.78 0.0063 295.25 295.00 FES 107 5 295.25 CB 106 CB105 0.35 0.80 7.98 24 PP 26.00 20.50 2.23 17.01 0.0077 295.00 294.80 CB 106 299.30 295.00 NCDOT 840.03 DOUBLE 1.12 1.93 4.50 CB 105 FES 104 0.35 0.30 7.98 24 PP 44.00 20.50 0.84 17.85 0.0068 294.80 294.50 CB 105 299.30 294.80 NCDOT 840.03 0.42 0.45 2.50 FES 103 5 CB 102 0.35 18.70 8.89 42 PP 28.00 91.10 58.19 58.19 0.0071 280.80 280.60 FES 103 5 280.80 CB 102 CB 101 0.35 0.20 7.98 42 PP 27.00 91.10 0.56 58.74 0.0074 280.60 280.40 CB 102 281.73 280.60 NCDOT 840.03 0.28 0.23 0.05 2.50 CB 101 FES 100 0.35 0.20 7.98 42 PP 96.00 111.10 0.56 59.30 0.0104 280.40 279.40 CB 101 281.73 280.40 NCDOT 840.03 0.28 0.23 0.05 2.50 CB 204 CB 203 0.35 0.73 7.98 15 PP 26.00 4.94 2.04 2.04 0.0054 278.32 278.18 CB 204 281.33 278.32 NCDOT 840.03 DOUBLE 1.02 2.05 5.00 CB 203 CB 202 0.35 0.15 7.98 15 PP 51.00 4.94 0.42 2.46 0.0118 278.18 277.58 CB 203 281.33 278.18 NCDOT 840.03 0.21 1 1.20 6.00 CB 202 CB 201 0.90 0.01 7.98 15 PP 26.00 5.85 0.07 2.53 0.0077 277.58 277.38 CB 202 281.03 277.58 NCDOT 840.03 0.04 0.04 0.50 CB 201 FES 200 0.80 0.13 7.98 15 PP 118.00 4.94 0.83 3.36 0.0159 277.38 275.50 CB 201 281.03 277.38 NCDOT 840.03 0.42 0.36 0.11 3.00 CB 303 CB 302 0.35 0.92 7.98 15 PP 27.00 4.94 2.57 2.57 0.0074 282.00 281.80 CB 303 285.25 282.00 NCDOT 840.03 DOUBLE 1.29 1.84 4.50 CB 302 CB 301 0.35 0.80 7.98 15 PP 56.00 5.42 2.23 4.80 0.0050 281.80 281.52 CB 302 285.25 281.80 NCDOT 840.03 DOUBLE 1.12 1.68 4.50 CB 301 FES 300 0.35 0.03 7.98 15 PP 118.00 10.60 0.08 4.89 0.0129 281.52 280.00 CB 301 287.68 281.52 NCDOT 840.03 0.04 0.04 0.00 0.50 DI 404 FES 403 15 PP 26.00 5.85 4.47 4.47 0.0077 287.20 287.00 DI 404 290.00 287.20 NCDOT 840.17 CB 402 CB 401 0.35 0.80 7.98 15 PP 26.00 5.85 2.23 2.23 0.0077 292.00 291.80 CB 402 295.00 292.00 NCDOT 840.03 1.12 0.84 0.55 4.50 CB 401 FES 400 0.35 0.80 7.98 15 PP 88.00 4.94 2.23 4.47 0.0068 291.50 290.90 CB 401 295.00 291.50 NCDOT 840.03 1.12 0.86 0.56 4.50 CB 502 CB 501 0.35 0.40 7.98 15 PP 26.00 5.85 1.12 1.12 0.0077 294.68 294.48 CB 502 297.93 294.68 NCDOT 840.03 0.56 0.56 0.27 4.50 CB 501 FES 500 0.35 0.40 7.98 15 PP 88.00 4.94 1.12 2.23 0.0050 294.48 294.04 CB 501 297.93 294.48 NCDOT 840.03 0.56 0.60 0.30 5.00 CB 602 CB 601 0.35 0.60 7.98 15 PP 26.00 5.85 1.68 1.68 0.0077 295.58 295.38 CB 602 298.83 295.58 NCDOT 840.03 0.84 0.57 0.27 4.50 CB 601 FES 600 0.35 0.70 7.98 15 PP 88.00 4.94 1.96 3.63 0.0050 295.38 294.94 CB 601 298.83 295.38 NCDOT 840.03 0.98 0.64 0.34 5.00 CB 702 CB 701 0.35 1.20 7.98 15 PP 26.00 5.85 3.35 3.35 0.0077 287.47 287.27 CB 702 290.72 287.47 NCDOT 840.03 1.68 1.16 0.99 5.00 CB 701 FES 700 0.35 1.30 7.98 15 PP 88.00 6.99 3.63 6.98 0.0050 287.27 286.83 CB 701 290.72 287.27 NCDOT 840.03 1.82 1.20 1.03 5.50 CB 802 CB 801 0.35 0.50 7.98 15 PP 26.00 5.85 1.40 1.40 0.0077 293.64 293.44 CB 802 296.88 293.64 NCDOT 840.03 0.70 0.76 0.47 5.50 CB 801 FES 800 0.35 0.60 7.98 15 PP 88.00 4.94 1.68 3.07 0.0056 293.44 292.95 CB 801 296.88 293.44 NCDOT 840.03 0.84 0.70 0.41 5.50 CB 902 CB 901 0.35 0.70 7.98 15 PP 26.00 5.85 1.96 1.96 0.0077 295.01 294.81 CB 902 298.27 295.01 NCDOT 840.03 0.98 0.82 0.53 6.00 CB 901 FES 900 0.35 0.60 7.98 15 PP 42.00 4.94 1.68 3.63 0.0050 294.81 294.60 CB 901 298.27 294.81 NCDOT 840.03 0.84 0.57 0.27 4.50 CB 1002 CB 1001 0.35 0.10 7.98 15 PP 26.00 5.85 0.28 0.28 0.0077 268.95 268.75 CB 1002 272.20 268.95 NCDOT 840.03 0.14 0.14 0.00 1.00 CB 1001 FES 1000 0.35 0.30 7.98 15 PP 108.00 4.94 0.84 1.12 0.0048 268.75 268.23 CB 1001 272.20 268.75 NCDOT 840.03 0.42 0.35 0.07 2.00 Notes 1 Storm System Sizing based on 10-yr Storm 2 Gutter Spread Calculations based on Storm Intensity of 4 in/hr 3 CB(Catch Basin)Top Elevation is Grate at EDP 4 Gutter Spread Width is measured from Edge of Pavement 5 Storm System Sizing based on 25-yr Storm-For cross-pipe 6 Allowable Gutter Spread is 6.0 ft based on 12.0 Travel Lane Culvert Report Hydraflow Express Extension for AutoCADO Civil 3D0 2009 by Autodesk, Inc. Wednesday,Aug 23 2023 CULVERT #1 Invert Elev Dn (ft) = 307.10 Calculations Pipe Length (ft) = 64.00 Qmin (cfs) = 5.49 Slope (%) = 0.50 Qmax (cfs) = 5.49 Invert Elev Up (ft) = 307.42 Tailwater Elev (ft) = Normal Rise (in) = 18.0 Shape = Cir Highlighted Span (in) = 18.0 Qtotal (cfs) = 5.49 No. Barrels = 1 Qpipe (cfs) = 5.49 n-Value = 0.012 Qovertop (cfs) = 0.00 Inlet Edge = Projecting Veloc Dn (ft/s) = 4.90 Coeff. K,M,c,Y k = 0.0045, 2, 0.0317, 0.69, 0.5 Veloc Up (ft/s) = 4.90 HGL Dn (ft) = 308.01 Embankment HGL Up (ft) = 308.33 Top Elevation (ft) = 310.00 Hw Elev (ft) = 308.75 Top Width (ft) = 30.00 Hw/D (ft) = 0.88 Crest Width (ft) = 10.00 Flow Regime = Inlet Control Flow C=0.6 I=8.89 Q=CIA A=1.03 Q=5.49 Elev(R) CULVERT#1 H.Depth(ft) 311.00 3.50 310.00 2.58 309.00 1.58 e con ro 308.00 0.50 307.00 -0.42 306.00 -1.42 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 Cir Culvert HGL Emh-k Reach(ft) Culvert Report Hydraflow Express Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. Wednesday, Feb 28 2024 FES 103 Invert Elev Dn (ft) = 281 .26 Calculations Pipe Length (ft) = 28.00 Q m i n (cfs) = 58.19 Slope (%) = 0.71 Qmax (cfs) = 58.19 Invert Elev Up (ft) = 281 .46 Tailwater Elev (ft) = Normal Rise (in) = 42.0 Shape = Cir Highlighted Span (in) = 42.0 Qtotal (cfs) = 58.19 No. Barrels = 1 Qpipe (cfs) = 58.19 n-Value = 0.012 Qovertop (cfs) = 0.00 Inlet Edge = Projecting Veloc Dn (ft/s) = 8.28 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.5 Veloc Up (ft/s) = 8.28 HGL Dn (ft) = 283.66 Embankment HGL Up (ft) = 283.86 Top Elevation (ft) = 286.00 Hw Elev (ft) = 285.09 Top Width (ft) = 24.00 Hw/D (ft) = 1 .04 Crest Width (ft) = 12.00 Flow Regime = Inlet Control Elev(If) FES 103 Hw Depth(ft) 287.00 5.54 286.00 4.54 205.00 3.54 284.00 2.54 283.00 1.54 202.00 0.54 281.00 -0.46 280.00 -1.46 0 5 10 15 20 25 30 35 40 45 50 Cir Culver) HGL Embank Reach(ft) Culvert Report Hydraflow Express Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. Saturday, Mar 2 2024 FES 107 Invert Elev Dn (ft) = 295.00 Calculations Pipe Length (ft) = 44.00 Qmin (cfs) = 11.11 Slope (%) = 0.57 Qmax (cfs) = 11.11 Invert Elev Up (ft) = 295.25 Tailwater Elev (ft) = Normal Rise (in) = 24.0 Shape = Cir Highlighted Span (in) = 24.0 Qtotal (cfs) = 11.11 No. Barrels = 1 Qpipe (cfs) = 11.11 n-Value = 0.012 Qovertop (cfs) = 0.00 Inlet Edge = Beveled Veloc Dn (ft/s) = 6.11 Coeff. K,M,c,yk = 0.0018, 2.5, 0.03, 0.74, 0.2 Veloc Up (ft/s) = 5.63 HGL Dn (ft) = 296.12 Embankment HGL Up (ft) = 296.45 Top Elevation (ft) = 300.60 Hw Elev (ft) = 296.98 Top Width (ft) = 30.00 Hw/D (ft) = 0.87 Crest Width (ft) = 12.00 Flow Regime = Inlet Control Elev(R) FES 107 H.Depth(It) 301.00 5.75 300.00 4.75 299.00 3.75 290.00 2.75 297.00 1.75 296.00 0.75 295.00 -0.25 294.00 -1.25 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Cir Culvert HGL Emh-k Reach(ft) C mma, C @RV@Y(KDRC@ swKI(ag Permanent Diversion# 1A =>DA# 1A Calculate Flow-Rational Method Calculate Flow-Rational Method 25-YrStorm 10-YrStorm Q25=CIA C= 0.30 Qla=CIA C= 0.30 1= 5.37 in/hr TC CA LC 1= 4.78 in/hr TC CA LC Q25= 22.07 A= 13.70 ac Q.= 19.65 A= 13.70 ac Channel Slope= 0.60% Channel Slope= 0.60% Channel Depth= .50 ft Channel Depth= 1.50 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00:1 Side Slopes= 3.00:1 Manning Coef. .022 Manning Coef.= 0.022 Velocity= .84 ft/s Velocity= 3.75 ft/s Soil Type @ ndy loarr Slopes=0-5 % Soil Type @ sandy loarr Slopes=0-5 A% Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate -ft cl-te -ft T= 0.408096 Ibs/ftZ s= 0.006 ft/ft T= 0.385632 Ibs/ftZ s= 0.006 ft/ft Temporary=INAG S150BN Temporary=NAG S150BN ' Permanent=Bermudagrass Permanent=Bermudagrass Permanent Diversion# 1B =>DA# 113&1A Calculate Flow-Rational Method Calculate Flow-Rational Method 25-YrStorm 10-YrStorm Q25=CIA C= 0.30 Qla=CIA C= 0.30 1= 5.37 in/hr TC CA LC 1= 4.78 in/hr TC CALC Q25= 56.06 A= 34.80 ac Q10= 49.90 A= 34.80 ac Channel Slope=rndy .60% Channel Slope= 0.60% Channel Depth= .50 ft Channel Depth= 1.50 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= .00:1 Side Slopes= 3.00:1 Manning Coef. 022 Manning Coef.= 0.022 Velocity= .89 ft/s Velocity= 4.79 ft/s Soil Type @oarr Slopes=0-5 % Soil Type @ sandy loarr Slopes=0-5 M% Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate �ft cl-te -ft T= 0.61776 Ibs/ftZ s= 0.006 ft/ft T= 0.584064 Ibs/ftZ s= 0.006 ft/ft Temporary=INAG S150BN Temporary=NAG S150BN Permanent=Bermudagrass Permanent=Bermudagrass Permanent Diversion# 2A =>DA# 2A Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr QZ5= 40.81 A= 15.30 ac Q10= 36.63 A= 15.30 ac Channel Slope= 0.50% Channel Slope= 0.50 Channel Depth= 6.00 ft Channel Depth= 6.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes= 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 4.23 ft/s Velocity= 4.12 ft/s Soil Type C@ sandy loarr Slopes=0-5 % Soil Type CD sandy loan Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 1.49 ft dwatef 1.42 ft T= 0.46488 Ibs/ftZ s= 0.005 ft/ft T= 0.44304 Ibs/ftZ s= 0.005 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 2B =>DA# 2A&2B Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 42.14 A= 15.80 ac Q10= 37.83 A= 15.80 ac Channel Slope= 3.00% Channel Slope= 3.00 Channel Depth= 1.50 ft Channel Depth= 1.50 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes-- 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 8.29 ft/s Velocity= 8.08 ft/s Soil Type @ sandy loarr Slopes=0-5 % Soil Type @ sandy loarr Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 1.01 ft dwate 0.96 ft T= 1.89072 Ibs/ftZ s= 0.03 ft/ft T= 1.79712 Ibs/ftZ s= 0.03 ft/ft Temporary= NAG P300 Temporary= NAG P300 Permanent= NAG P300 VEG Permanent= NAG P300 VEG Permanent Diversion# 2C =>DA# 2A&2B&2C Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr QZ5= 49.87 A= 18.70 ac Q10= 44.77 A= 18.70 ac Channel Slope= 2.00% Channel Slope= 2.00 Channel Depth= 6.00 ft Channel Depth= 6.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes= 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 7.42 ft/s Velocity= 7.23 ft/s Soil Type C@ sandy loarr Slopes=0-5 % Soil Type CD sandy loan Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 1.2 ft dwatef 1.14 ft T= 1.4976 Ibs/ftZ s= 0.02 ft/ft T= 1.42272 Ibs/ftZ s= 0.02 ft/ft Temporary= NAG P300 Temporary= NAG P300 Permanent= NAG P300 VEG Permanent= NAG P300 VEG Permanent Diversion# 3A =>DA# 3A Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 5.84 A= 2.19 ac Q10= 5.24 A= 2.19 ac Channel Slope= 0.50% Channel Slope= 0.50 Channel Depth= 4.00 ft Channel Depth= 4.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes= 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 2.56 ft/s Velocity= 2.48 ft/s Soil Type C@ sandy loarr Slopes=0-5 % Soil Type CD sandy loan Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 0.6 ft dwatef 0.57 ft T= 0.1872 Ibs/ftZ s= 0.005 ft/ft T= 0.17784 Ibs/ftZ s= 0.005 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 3B =>DA# 3A&3B Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 16.22 A= 6.08 ac Q10= 14.56 A= 6.08 ac Channel Slope= 0.50% Channel Slope= 0.50 Channel Depth= 5.00 ft Channel Depth= 5.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes-- 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 3.35 ft/s Velocity-- 3.21 ft/s Soil Type @ sandy loarr Slopes=0-5 % Soil Type @ sandy loarr Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 0.98 ft dwate 0.94 ft T= 0.30576 Ibs/ftZ s= 0.005 ft/ft T= 0.29328 Ibs/ftZ s= 0.005 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 4 =>DA# 4 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 4.96 A= 1.86 ac Q10= 4.45 A= 1.86 ac Channel Slope= 1.00% Channel Slope= 1.00 Channel Depth= 5.00 ft Channel Depth= 5.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes= 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 3.09 ft/s Velocity= 3.09 ft/s Soil Type C@ sandy loarr Slopes=0-5 % Soil Type CD sandy loan Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 0.47 ft dwatef 0.44 ft T= 0.29328 Ibs/ftZ s= 0.01 ft/ft T= 0.27456 Ibs/ftZ s= 0.01 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 5 =>DA# 5 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 3.01 A= 1.13 ac Q10= 2.71 A= 1.13 ac Channel Slope= 0.50% Channel Slope= 0.50 Channel Depth= 5.00 ft Channel Depth= 5.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes-- 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 2.13 ft/s Velocity-- 2.05 ft/s Soil Type @ sandy loarr Slopes=0-5 % Soil Type @ sandy loarr Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 0.43 ft dwate 0.41 ft T= 0.13416 Ibs/ftZ s= 0.005 ft/ft T= 0.12792 Ibs/ftZ s= 0.005 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 6 =>DA# 6 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 5.47 A= 2.05 a c Q10= 4.91 A= 2.05 a c Channel Slope= 0.50% Channel Slope= 0.50 Channel Depth= 5.00 ft Channel Depth= 5.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes= 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 2.46 ft/s Velocity= 2.38 ft/s Soil Type C@ sandy loarr Slopes=0-5 % Soil Type CD sandy loan Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 0.59 ft dwatef 0.56 ft T= 0.18408 Ibs/ftZ s= 0.005 ft/ft T= 0.17472 Ibs/ftZ s= 0.005 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 7 =>DA# 7 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 4.00 A= 1.50 a c Q10= 3.59 A= 1.50 a c Channel Slope= 2.00% Channel Slope= 2.00 Channel Depth= 5.00 ft Channel Depth= 5.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes-- 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 3.75 ft/s Velocity-- 3.64 ft/s Soil Type @ sandy loarr Slopes=0-5 % Soil Type @ sandy loarr Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 0.35 ft dwate 0.33 ft T= 0.4368 Ibs/ftZ s= 0.02 ft/ft T= 0.41184 Ibs/ftZ s= 0.02 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 8 =>DA# 8 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 2.13 A= 0.80 ac Q10= 1.92 A= 0.80 ac Channel Slope= 2.00% Channel Slope= 2.00 Channel Depth= 5.00 ft Channel Depth= 5.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes= 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 3.10 ft/s Velocity= 2.94 ft/s Soil Type C@ sandy loarr Slopes=0-5 % Soil Type CD sandy loan Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 0.25 ft dwatef 0.24 ft T= 0.312 Ibs/ftZ s= 0.02 ft/ft T= 0.29952 Ibs/ftZ s= 0.02 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 9 =>DA# 9 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 0,10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 4.27 A= 1.60 ac Q10= 3.83 A= 1.60 ac Channel Slope= 0.10% Channel Slope= 0.10 Channel Depth= 5.00 ft Channel Depth= 5.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00 :1 Side Slopes-- 3.00 :1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 3.75 ft/s Velocity-- 3.64 ft/s Soil Type @ sandy loarr Slopes=0-5 % Soil Type @ sandy loarr Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4 Ibs T=yds y= 62.4 Ibs dwate 0.35 ft dwate 0.33 ft T= 0.02184 Ibs/ftZ s= 0.001 ft/ft T= 0.020592 Ibs/ftZ s= 0.001 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 10 =>DA# 10 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 Q10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 12.19 A= 4.57 ac Q10= 10.94 A= 4.57 ac Channel Slope= 0.80% Channel Slope= 0.80 Channel Depth= 4.00 ft Channel Depth 4.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00:1 Side Slopes= 3.00:1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 3.67 ft/s Velocity= 3.58 ft/s Soil Type @ sandy loan Slopes=0-5 % Soil Type @ sandy loam Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4lbs T=yds y= 62.4lbs dwate 0.77 ft dwatef 0.73 ft T= 0.384384 Ibs/ftZ s= 0.008 ft/ft T= 0.364416 Ibs/ftZ s= 0.008 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 100 =>DA# 100 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 Q10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 51.55 A= 19.33 ac Q10= 46.28 A= 19.33 ac Channel Slope= 4.00% Channel Slope= 4.00 Channel Depth= 1.50 ft Channel Depth 1.50 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00:1 Side Slopes= 3.00:1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 9.68 ft/s Velocity= 9.41 ft/s Soil Type @ sandy loan Slopes=0-5 % Soil Type @ sandy loam Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4lbs T=yds y= 62.4lbs dwate 1.04 ft dwate 0.99 ft T= 2.59584 Ibs/ftZ s= 0.04 ft/ft T= 2.47104 Ibs/ftZ s= 0.04 ft/ft Temporary= NAG P300 VEG Temporary= NAG P300 VEG Permanent= NAG P300 VEG Permanent= NAG P300 VEG Permanent Diversion# 200 =>DA# 200 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 Q10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 2.99 A= 1.12 ac Q10= 2.68 A= 1.12 ac Channel Slope= 2.70% Channel Slope= 2.70 Channel Depth= 1.00 ft Channel Depth 4.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00:1 Side Slopes= 3.00:1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 3.76 ft/s Velocity= 3.71 ft/s Soil Type @ sandy loan Slopes=0-5 % Soil Type @ sandy loam Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4lbs T=yds y= 62.4lbs dwate 0.28 ft dwatef 0.26 ft T= 0.471744 Ibs/ft2 s= 0.027 ft/ft T= 0.438048 Ibs/ft2 s= 0.027 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass Permanent Diversion# 300 =>DA# 300 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Yr Storm 10-Yr Storm Q25=CIA C= 0.30 Q10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 5.44 A= 2.04 ac Q10= 4.88 A= 2.04 ac Channel Slope= 4.00% Channel Slope= 4.00 Channel Depth= 1.50 ft Channel Depth 1.50 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00:1 Side Slopes= 3.00:1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 5.30 ft/s Velocity= 4.95 ft/s Soil Type @ sandy loan Slopes=0-5 % Soil Type @ sandy loam Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4lbs T=yds y= 62.4lbs dwate 0.34 ft dwate 0.33 ft T= 0.84864 Ibs/ft2 s= 0.04 ft/ft T= 0.82368 Ibs/ft2 s= 0.04 ft/ft Temporary= NAG P300 Temporary= NAG P300 Permanent= NAG P300 VEG Permanent= NAG P300 VEG Permanent Diversion# 1000 =>DA# 1000 Calculate Flow-Rational Method Calculate Flow-Rational Method 25-Vr Storm 10-Vr Storm Q25=CIA C= 0.30 Q10=CIA C= 0.30 1= 8.89 in/hr 1= 7.98 in/hr Q25= 1.60 A= 0.60 ac Q10= 1.44 A= 0.60 ac Channel Slope= 4.00% Channel Slope= 4.00 Channel Depth= 1.00 ft Channel Depth 1.00 ft Channel Bottom W= 2 ft Channel Bottom W= 2 ft Side Slopes= 3.00:1 Side Slopes= 3.00:1 Manning Coef.= 0.022 Manning Coef.= 0.022 Velocity= 3.50 ft/s Velocity= 3.37 ft/s Soil Type @ sandy loan Slopes=0-5 % Soil Type @ sandy loam Slopes=0-5 Channel Lining Channel Lining Shear Calculation Shear Calculation T=yds y= 62.4lbs T=yds y= 62.4lbs dwate 0.18 ft dwatef 0.17 ft T= 0.44928 Ibs/ftZ s= 0.04 ft/ft T= 0.42432 Ibs/ftZ s= 0.04 ft/ft Temporary= NAG S150BN Temporary= NAG S150BN Permanent= Bermudagrass Permanent= Bermudagrass EmAm C@&d Outlet Protection#100 New York Method 8.06.5 Manual Q= 59.3 cfs La= 28 FT Pipe Diameter 42 in W= 7 FT Velocity= 11.3 ft/s d= 24 IN Zone= 3 Stone Diameter= Class I Outlet Protection#104 New York Method 8.06.5 Manual Q= 17.85 cfs La= 12 FT Pipe Diameter 24 ft W= 6 FT Velocity= 6.5 ft/s d= 18 IN Zone= 1 Stone Diameter= Class B Outlet Protection#108 New York Method 8.06.5 Manual Q= 14.74 cfs La= 12 FT Pipe Diameter 24 ft W= 6 FT Velocity= 5.5 ft/s d= 18 IN Zone= 1 Stone Diameter= Class B Outlet Protection#112 New York Method 8.06.5 Manual Q= 2.79 cfs La= 5 FT Pipe Diameter 15 ft W= 4 FT Velocity= 4.03 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#115 New York Method 8.06.5 Manual Q= 5.03 cfs La= 5 FT Pipe Diameter 15 ft W= 4 FT Velocity= 4.03 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#118 New York Method 8.06.5 Manual Q= 2.53 cfs La= 12 FT Pipe Diameter 24 ft W= 6 FT Velocity= 6.5 ft/s d= 18 IN Zone= 2 Stone Diameter= Class B Outlet Protection#121 New York Method 8.06.5 Manual Q= 1.67 cfs La= 12 FT Pipe Diameter 24 ft W= 6 FT Velocity= 6.5 ft/s d= 18 IN Zone= 2 Stone Diameter= Class B Outlet Protection#200 New York Method 8.06.5 Manual Q= 3.36 cfs La= 5 FT Pipe Diameter 15 ft W= 4 FT Velocity= 6.98 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#300 New York Method 8.06.5 Manual Q= 4.89 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 7.2 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#400 New York Method 8.06.5 Manual Q= 4.47 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 4.03 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#403 New York Method 8.06.5 Manual Q= 4.47 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 5.7 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#500 New York Method 8.06.5 Manual Q= 2.23 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 4.03 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#600 New York Method 8.06.5 Manual Q= 3.63 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 4.03 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#700 New York Method 8.06.5 Manual Q= 6.98 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 4.03 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#800 New York Method 8.06.5 Manual Q= 3.07 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 4.03 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#900 New York Method 8.06.5 Manual Q= 3.63 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 4.03 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#1000 New York Method 8.06.5 Manual Q= 1.12 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 4.03 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Skimmer Basin# 1 Calculate Flow- Rational Method 10-Yr Storm 25-Yr Storm Q10=CIA C= 0.4 Q25=CIA C= 0.4 1= 7.72 1= 8.47 Q10= 20.9984 A= 6.8 Q25= 23.0384 A= 6.8 Calculate Required Surface Area SA=Q10 x 325 sf/cfs Q10= 20.9984 cfs SA= 6824.48 Side Slopes= 3 :1 Pond Depth= 2 ft Basin Dims Top = 71 x 142 = 10082 sf Weir= 59 x 118 = 6962 sf Bottom = 47 x 94 = 4418 sf Volume Required VR=Ax1800 cf/ac A= 6.8 VR= 12240 Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 10082 Bottom= 4418 VP= 14500 D= 2 OK Weir Sizing Per AutoCad Hydraflow Software L= 10 ft D= 2 ft dwater= 0.92 ft Q25= 23.0384 cfs Velocity= 2.5 ft/s Weir Lining Shear Calculation T=yds y= 62.4lbs dwater= 0.92 ft T= 0.57408 Ibs/ft' s= 0.01 ft/ft Use Class A Rip Rap Skimmer Sizing RE Calculate Dewater Time Qd=V/Td V= 12240 Td= 3 2-5 days typ Qd= 4080 Calculate Orifice Diameter D=sgrt((Qd/(2310sgrt(h))) Qd= 4080 h= 0.33 D= 1.007285 Use 4 " Skimmer 1.0 Orifice Skimmer Outlet Protection New York Method 8.06.5 Manual Diameter of Barrel = 4.00 " La= 1.32 Use 7.5 ft Velocity= 2.36 ft/s W= 1 Use 3.0 ft Zone= 1 d= 12" Stone Diameter= Class A Skimmer Basin# 2 Calculate Flow- Rational Method 10-Yr Storm 25-Yr Storm Q10=CIA C= 0.4 Q25=CIA C= 0.4 1= 7.72 1= 8.47 Q10= 32.424 A= 10.5 Q25= 35.574 A= 10.5 Calculate Required Surface Area SA=Q10 x 325 sf/cfs Q10= 32.424 cfs SA= 10537.8 Side Slopes= 3 :1 Pond Depth= 2 ft Basin Dims Top = 86 x 172 = 14792 sf Weir= 74 x 148 = 10952 sf Bottom = 62 x 124 = 7688 sf Volume Required VR=Ax1800 cf/ac A= 10.5 VR= 18900 Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 14792 Bottom= 7688 VP= 22480 D= 2 OK Weir Sizing Per AutoCad Hydraflow Software L= 15 ft D= 2 ft dwater= 0.94 ft Q25= 35.574 cfs Velocity= 2.52 ft/s Weir Lining Shear Calculation T=yds y= 62.4lbs dwater= 0.94 ft T= 0.58656 Ibs/ft' s= 0.01 ft/ft Use Class A Rip Rap Skimmer Sizing RE Calculate Dewater Time Qd=V/Td V= 18900 Td= 3 2-5 days typ Qd= 6300 Calculate Orifice Diameter D=sgrt((Qd/(2310sgrt(h))) Qd= 6300 h= 0.33 D= 1.251678 Use 4 " Skimmer 1.3 Orifice Skimmer Outlet Protection New York Method 8.06.5 Manual Diameter of Barrel = 4.00 " La= 1.32 Use 7.5 ft Velocity= 2.36 ft/s W= 1 Use 3.0 ft Zone= 1 d= 12" Stone Diameter= Class A Skimmer Basin# 3 Calculate Flow- Rational Method 10-Yr Storm 25-Yr Storm Q10=CIA C= 0.4 Q25=CIA C= 0.4 1= 7.78 1= 8.59 Q10= 27.0744 A= 8.7 Q25= 29.8932 A= 8.7 Calculate Required Surface Area SA=Q10 x 325 sf/cfs Q10= 27.0744 cfs SA= 8799.18 Side Slopes= 3 :1 Pond Depth= 2 ft Basin Dims Top = 79 x 158 = 12482 sf Weir= 67 x 134 = 8978 sf Bottom = 55 x 110 = 6050 sf Volume Required VR=Ax1800 cf/ac A= 8.7 VR= 15660 Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 12482 Bottom= 6050 VP= 18532 D= 2 OK Weir Sizing Per AutoCad Hydraflow Software L= 15 ft D= 2 ft dwater= 0.84 ft Q25= 29.8932 cfs Velocity= 2.38 ft/s Weir Lining Shear Calculation T=yds y= 62.4lbs dwater= 0.84 ft T= 0.52416 Ibs/ft' s= 0.01 ft/ft Use Class A Rip Rap Skimmer Sizing RE Calculate Dewater Time Qd=V/Td V= 15660 Td= 3 2-5 days typ Qd= 5220 Calculate Orifice Diameter D=sgrt((Qd/(2310sgrt(h))) Qd= 5220 h= 0.33 D= 1.139352 Use 4 " Skimmer 1.1 Orifice Skimmer Outlet Protection New York Method 8.06.5 Manual Diameter of Barrel = 4.00 " La= 1.32 Use 7.5 ft Velocity= 2.36 ft/s W= 1 Use 3.0 ft Zone= 1 d= 12" Stone Diameter= Class A Skimmer Basin# 4 Calculate Flow- Rational Method 10-Yr Storm 25-Yr Storm Q10=CIA C= 0.5 Q25=CIA C= 0.5 1= 7.72 1= 8.47 Q10= 28.1008 A= 7.28 Q25= 30.8308 A= 7.28 Calculate Required Surface Area SA=Q10 x 325 sf/cfs Q10= 28.1008 cfs SA= 9132.76 Side Slopes= 3 :1 Pond Depth= 2 ft Basin Dims Top = 80 x 160 = 12800 sf Weir= 68 x 136 = 9248 sf Bottom = 56 x 112 = 6272 sf Volume Required VR=Ax1800 cf/ac A= 7.28 VR= 13104 Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 12800 Bottom= 6272 VP= 19072 D= 2 OK Weir Sizing Per AutoCad Hydraflow Software L= 15 ft D= 2 ft dwater= 0.85 ft Q25= 30.8308 cfs Velocity= 2.4 ft/s Weir Lining Shear Calculation T=yds y= 62.4lbs dwater= 0.85 ft T= 0.5304 Ibs/ft' s= 0.01 ft/ft Use Class A Rip Rap Skimmer Sizing RE Calculate Dewater Time Qd=V/Td V= 13104 Td= 3 2-5 days typ Qd= 4368 Calculate Orifice Diameter D=sgrt((Qd/(2310sgrt(h))) Qd= 4368 h= 0.33 D= 1.042231 Use 4 " Skimmer 1.0 Orifice Skimmer Outlet Protection New York Method 8.06.5 Manual Diameter of Barrel = 4.00 " La= 1.32 Use 7.5 ft Velocity= 2.36 ft/s W= 1 Use 3.0 ft Zone= 1 d= 12" Stone Diameter= Class A Temporary Diversion# 100 =>DA# 100 Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.40 1= 8.89 in/hr Q25= 20.62 A= 5.80 ac Channel Slope= 0.50 Channel Depth= 2.00 Channel Bottom W= 0 Side Slopes= 3.00 Velocity= 3.55 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Shear Calculation T=yds y= 62.4lbs dwater= 1.39 ft T= 0.43368 Ibs/ftz s= 0.005 ft/ft Temporary= NAG S75BN Permanent= Bermudagrass 6 Temporary Diversion# 200 =>DA# 200 Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.40 1= 8.89 in/hr Q25= 30.94 A= 8.70 ac Channel Slope= 5.00 WORSE CASE Channel Depth= 2.00 Channel Bottom W= 0 Side Slopes= 3.00 Velocity= 9.30 Soil Type @ sandy loarr Slopes= 0-5 Channel Linin¢ Shear Calculation T=yds y= 62.4lbs dwater= 1.05 ft T= 3.276 Ibs/ftz s= 0.05 ft/ft Temporary= NAG P300 Permanent= Bermudagrass Temporary Diversion# 300 =>DA# 300 Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.40 1= 8.89 in/hr Q25= 1.78 A= 0.50 ac Channel Slope= 0.50 Channel Depth= 1.00 Channel Bottom W= 0 Side Slopes= 3.00 Velocity= 1.89 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Shear Calculation T=yds y= 62.4lbs dwater= 0.56 ft T= 0.17472 Ibs/ftz s= 0.005 ft/ft Temporary= NAG S75BN Permanent= Bermudagrass Temporary Diversion# 400 =>DA# 400 Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.40 1= 8.89 in/hr Q25= 27.03 A= 7.60 ac Channel Slope= 0.50 Channel Depth= 2.00 Channel Bottom W= 0 Side Slopes= 3.00 Velocity= 3.84 Soil Type @ sandy loarr Slopes= 0-5 Channel Linin¢ Shear Calculation T=yds y= 62.4lbs dwater= 1.5 ft T= 0.468 Ibs/ftz s= 0.005 ft/ft Temporary= NAG S150BN Permanent= Bermudagrass Temporary Diversion# 500 =>DA# 500 Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.40 1= 8.89 in/hr Q25= 18.49 A= 5.20 ac Channel Slope= 0.50 Channel Depth= 2.00 Channel Bottom W= 0 Side Slopes= 3.00 Velocity= 3.48 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Shear Calculation T=yds y= 62.4lbs dwater= 1.3 ft T= 0.4056 Ibs/ftz s= 0.005 ft/ft Temporary= NAG S150BN Permanent= Bermudagrass Temporary Diversion# 600 =>DA# 600 Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.40 1= 8.89 in/hr Q25= 5.33 A= 1.50 ac Channel Slope= 5.00 WORSE CASE Channel Depth= 1.00 Channel Bottom W= 0 Side Slopes= 3.00 Velocity= 6.00 Soil Type @ sandy loarr Slopes= 0-5 Channel Linin¢ Shear Calculation T=yds y= 62.4lbs dwater= 0.5 ft T= 1.56 Ibs/ftz s= 0.05 ft/ft Temporary= NAG S150BN Permanent= Bermudagrass Temporary Diversion# 700A =>DA# 600A Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.30 1= 5.37 in/hr TC CALC Q25= 15.59 A= 9.68 ac Channel Slope= 0.50 Channel Depth= 1.50 Channel Bottom W= 0 Side Slopes= 3.00 Velocity= 3.30 Soil Type @ sandy loarr Slopes= 0-5 Channel Lining Shear Calculation T=yds y= 62.4lbs dwater= 1.25 ft T= 0.39 Ibs/ftz s= 0.005 ft/ft Temporary= NAG S150BN Permanent= Bermudagrass Temporary Diversion# 700B =>DA# 600B Calculate Flow-Rational Method 25-Yr Storm Q25=CIA C= 0.40 1= 5.37 in/hr TC CALC Q25= 45.11 A= 21.00 ac Channel Slope= 0.50 Channel Depth= 1.50 Channel Bottom W= 2 Side Slopes= 3.00 Velocity= 5.59 Soil Type @ sandy loarr Slopes= 0-5 Channel Linin¢ Shear Calculation T=yds y= 62.4lbs dwater= 1.34 ft T= 0.41808 Ibs/ftz s= 0.005 ft/ft Temporary= NAG S150BN Permanent= Bermudagrass U.S. Department of Agriculture FL-ENG-21 B Natural Resources Conservation Service 06/04 TR 55 Worksheet 3: Time of Concentration (T,) or Travel Time (Tt) Project: Buffalo Creek Subdivison Designed By: MTB Date: Location: Hoke County, NC Checked By: JH Date: Check one: y( Present Developed Check one: V Tc Tt through subarea 1A 8, 1B NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) Segment ID 1 1. Surface description (Table 3-1) ................................................ GRASS 2. Manning's roughness coeff., n (Table 3-1) .............................. 0.04 3. Flow length, L (total L < 100 ft) .............................................. ft 100 4. Two-year 24-hour rainfall, P2.................................................. in 0.1 5. Land slope, s ....................................................................... ft/ft 0.050 6. Tt =0.007 (nL)0.8 Compute Tt.......................... hr 0.18 + = 0.18 P2 0.5 S0.4 Shallow Concetrated Flow Segment ID 2 7. Surface description (paved or unpaved) ................................... UNPAVED 8. Flow length, L ......................................................................... ft 900 9. Watercourse slope, s ........................................................... ft/ft 0.013 10. Average velocity, V(Figure 3-1) .......................................... ft/s 1.5 11. Tt = L Compute Tt ......................... hr 0.17 + 3600 V Channel Flow Segment ID 12. Cross sectional flow area, a ............................................... ft2 0.0 13. Wetted perimeter, PW ......................................................... ft 0.0 14. Hydraulic radius, r= a Compute r .................................. ft PW 15. Channel Slope, s ............................................................ ft/ft 0.000 16. Manning's Roughness Coeff., n ............................................ 0.00 17. V= 1.49 r2/3 s'/2 Compute V ...................... ft/s 2.7 n 18. Flow length, L ...................................................................... ft 0 19. Tt = L Compute Tt.................................... hr + _ 3600 V 20. Watershed or subarea T,or Tt (add Tt in steps 6, 11, and 19 ................................................................. hr 0.35 0.35= 21.0 mins Outlet Protection#100 New York Method 8.06.5 Manual Q= 57.32 cfs La= 24 FT Pipe Diameter 36 in W= 9 FT Velocity= 10.2 ft/s d= 24 IN Zone= 3 Stone Diameter= Class 1 Outlet Protection#104 New York Method 8.06.5 Manual Q= 17.09 cfs La= 16 FT Pipe Diameter 24 ft W= 6 FT Velocity= 5.57 ft/s d= 18 IN Zone= 2 Stone Diameter= Class B Outlet Protection#200 New York Method 8.06.5 Manual Q= 6.14 cfs La= 5 FT Pipe Diameter 15 ft W= 4 FT Velocity= 7.23 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#300 New York Method 8.06.5 Manual Q= 4.89 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 7.2 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#400 New York Method 8.06.5 Manual Q= 4.3 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 6.6 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#500 New York Method 8.06.5 Manual Q= 6.14 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 7.23 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection#600 New York Method 8.06.5 Manual Q= 7.43 cfs La= 5 FT Pipe Diameter 15 in W= 4 FT Velocity= 4.94 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A APPENDIX B kup OROO Drr hgga lATau Carr bn C @nihr@O OT(d aga L%Ta@ J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue,Suite 104 Sanford,North Carolina 27330 (919)777-6010 phone www.jthomasengineering.com license no.C-3389 PROFESSIONAL ENGINEER'S SEAL V Q OTC � z LU LA Z0 Q w V H U) /STD,°°° , / // I \ \ \\\m\\\\�j 11I II/// / \ Z211 � a 00 LU DATD500 \\\\ "\'':::::•:':':/.' . '' '' %3� �� \ _ / / / �/J �/ �- - 1 1 / � l / l /l/ i // I IIII \�\ \\� ••�'':':'.••.7:':•:••.i•:••.'.''� \ /\ \ \\ I oATDa°° / / / / �/ �/- J��-- ( III l 1 �\ r I /// / / /// ///// // // ��\ \\\�\\\\�:.�'•�:�..;.,±�\,-',':.,',.,•. \ l I ZZ olo REVISIONS / l / / / / i / / / / � v/ / / / _� /!I IIII rl I � 11 1 \ \ \ -\ \\\ \\\\��__- -�-- '���•'`'' � `� //// // / / �_- // /�� / / �° / l I I I III I I I I � I \ N \ \ � \\ � �\�� \\\ ��-� 1 •. .�.' � oo AC / / / jam . �� / �. / l / JI \ I1 II I \ \ \\ \ (';.'• •, \ /7— z PRELIMINARY DO NOT USE FOR 2.A CONSTRUCTION OVA Scale: Drawn by: Z 1"=150' MTB Sheet: Designed by: z JRT Reviewed by: _ 150 0 75 150 300 DA 1 of 2 JRT Project Number: Date: N SCALE:1"=150' JULY 24,2020 DDS#:2019-23 J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue,Suite 104 Sanford,North Carolina 27330 (919)777-6010 phone www.jthomasengineering.com license no.C-3389 PROFESSIONAL ENGINEER'S SEAL \ w LU ♦ ��� / / ! / / I \ \ \ \ \\\ \\ l \ \\��\�\\\ \11 /� ����_- '�// III / / I / / / f I I I -��� ' � U I �I ♦ ���7' / ♦ / I I 1 1 I l l- -_L_)_ \ \\\�\\ \\ \ \t / / LA Z a w / fir �/ / // ♦ I i I ( / 1 / I / I / / '� 1 ( \ \ \ \ ���\\\\��� \\ �111 I I / /�\ \ V H Z / // JJ // /� J ♦I`; \ \\\�X\� HOC z Q / 1� \ \\2 \ 1 11 l / \ O w 0 LU ❑o / 41 D Z / \� (% AC L-- DAFES1D /3 REVISIONS 20 �— 6 1313 / o DASD /7- z PRELIMINARY DO NOT USE FOR Z CONSTRUCTION 0 �1k Scale: Drawn by: Z MTB 61 Sheet: Designed by: z JRT Reviewed by: _ 150 0 75 150 300 DA 1 of 2 JRT Project Number: Date: N SCALE:1"=150' JTE#: JULY 24,2020 DDS#:2019-23 APPENDIX D Soil Map—Hoke County, North Carolina - b 649800 649900 650000 650100 650200 650300 650400 65D500 650600 650700 650800 650900 651000 34o 59'24"N r p2 34o 59'24"N g n g rm r �i r �i � g a• Q B �i - �,��.� �, :any .1 ,�,,�..�,�e • � Soil MaN may not he valiel at this scale. 34o 58'55"N 34o 58'55"N 649800 649900 650000 650100 650200 650300 650400 650500 650600 650700 650800 650900 651000 651100 b Map Scale:1:6,200 if printed on A landscape(11"x 8.5")sheet. a Meters N 0 50 100 200 300 Feet 0 300 600 1200 1800 Map projection:Web Mercator Comereoordinates:WGS84 Edge tics:UTM Zone 17N WGS84 usoA Natural Resources Web Soil Survey 8/24/2023 Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—Hoke County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(A01) Spoil Area The soil surveys that comprise your AOI were mapped at 0 Area of Interest(AOI) Stony Spot 1:24,000. p� Y Soils Very Stony Spot Warning:Soil Map may not be valid at this scale. 0 Soil Map Unit Polygons Wet spot Enlargement of maps beyond the scale of mapping can cause ,P Soil Map Unit Lines misunderstanding of the detail of mapping and accuracy of soil Other line placement.The maps do not show the small areas of Soil Map Unit Points Special Line Features contrasting soils that could have been shown at a more detailed M� Special Point Features scale. Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map Borrow Pit measurements. Transportation Clay Spot _ Rails Source of Map: Natural Resources Conservation Service Closed Depression Web Soil Survey URL: .,o Interstate Highways Coordinate System: Web Mercator(EPSG:3857) Gravel Pit US Routes Maps from the Web Soil Survey are based on the Web Mercator Gravelly Spot Major Roads projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 0 Landfill Local Roads Albers equal-area conic projection,should be used if more A. Lava Flow Background accurate calculations of distance or area are required. Marsh or swamp Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s)listed below. Mine or Quarry Soil Survey Area: Hoke County, North Carolina Miscellaneous water Survey Area Data: Version 20, Sep 8,2022 Perennial Water Soil map units are labeled(as space allows)for map scales Rock Outcrop 1:50,000 or larger. Saline Spot Date(s)aerial images were photographed: Apr 17,2022—May 20,2022 Sandy Spot ° The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor Sinkhole shifting of map unit boundaries may be evident. Slide or Slip o Sodic Spot usoA Natural Resources Web Soil Survey 8/24/2023 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Hoke County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaB Blaney loamy sand,2 to 8 14.0 9.5% percent slopes BaD Blaney loamy sand,8 to 15 2.8 1.9% percent slopes DhA Dothan loamy sand,0 to 2 33.5 22.7% percent slopes FuB Fuquay sand,0 to 4 percent 52.3 35.5% slopes GdB Gilead loamy sand,2 to 8 0.1 0.0% percent slopes JT Johnston loam 24.4 16.5% Pg Pantego loam 4.6 3.1% VaD Vaucluse loamy sand,8 to 15 15.7 10.6% percent slopes Totals for Area of Interest 147.6 100.0% USDA Natural Resources Web Soil Survey 8/24/2023 Conservation Service National Cooperative Soil Survey Page 3 of 3 APPENDIX E r" - �REAS POW psi •s , 0 oppp 41 1p MW Y � 0 APPENDIX E MSCBS Map so tiF �'p� Fs ITE - - - __ 300 APPENDIX E SUCK i1MAVER FORMS RMS SUPPLE n1C HU—M /QC�C�QC�C�In�n1C�Mn 4 Mp SUPPLEInvi RHU FORM G3M SUPPLEMENT-EZ COVER PAGE ORMS LOADI PROJECT INFORMATION 1 Project Name Buffalo Creek Subdivision 2 Project Area ac 52.2 3 Coastal Wetland Area ac 4 Surface Water Area ac 0 5 Is this project High or Low Density? Low 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003 4 c-d? Yes 10 1 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader-Filter Strip LS-FS 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 IFilterra 1 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jarrod E.Hilliard, PE 28 Or anization: Hilliard Engineering,PLLC. 29 Street address: P.O.Box 249 30 City,State,Zip: Sanford,NC 27331 31 Phone numbers : 919 352-2834 32 Email: ihilliard(aDhilliardenaineerina.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Signature of Designer Seal Date DRAINAGE AREAS 1 Is this a hi h density project? No 2 If so,number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so number of low density drainage areas 3 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LID 1 LID 2 LID 3 4 Type of SCM 5 Total drainage area(sq ft 2273832 6 Onsite drainage area(sq ft 2273832 7 Offsite drainage area(sq ft 8 Total BUA in project(sq ft 323151 sf New BUA on subdivided lots(subject to 9 ermitting)(sq ft 164500 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 158651 sf 11 Offsite BUA(sq ft 12 Breakdown of new BUA not on subdivided lots: -Parking (sq ft -Sidewalk(s ft 22177 sf -Roof(sq ft -Roadway s ft 136474 sf -Future s ft -Other,please specify in the comment box below(sq ft New infiltrating permeable pavement on 13 subdivided lots(sq ft New infiltrating permeable pavement not on 14 subdivided lots(sq ft Existing BUA that will remain(not subject to 15permitting) s ft 16 Existing BUA that is already permitted(sq ft 17 Existing BUA that will be removed(sq ft 18 Percent BUA 14% 19 Design storm inches 20 IDesign volume of SCM cu ft 21 lCalculation method for design volume ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Percent BUA is based on total Property area. LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 021-1.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per.1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances(H:V) 3 sf 5 1 Maximum velocity in the vegetated conveyances during the 10-year storm? 3.04 6 JAre curb outlet swales proposed? Yes 7 Maximum longitudinal slope of curb outlet swale(s)(%) 4 8 Bottom width of curb outlet swale(s)(feet) 2 It 9 Maximum side slope of curb outlet swale(s)(H:V) 3:1 10 Minimum length of curb outlet swale(s)(feet) 100 It 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? No 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule.1003 proposed? No ADDITIONAL INFORMATION 15 JPlease use this space to provide any additional information about this low density project: *BUA&Pervious areas are for the swale drainage areas only 1A=PD1;2=PD1B;3=PD2A;4=PD2B;5=PD2C;6=PD3A;7=PD3B;8=PD4;9=PD5;10=PD6;11=PD7;12=PD8;13=PD9; 14=PD10;15=PD100;16=PD200;17=PD300;18=PD1000 Swale V- Drainage BUA Pervious Q Slope V,,,o,,, , Flow depth # Area (ac) area C (cfs) (/) (fps) (fps) (ft) ac ac 1 13.70 0.00 13.70 0.30 1965. 0.60 5.00 3.75 1.03 2 34.80 0.14 34.65 0.30 49.90 0.60 5.00 4.79 1.56 3 15.30 3.44 11.86 0.30 36.63 0.50 5.00 4.12 1.42 4 15.80 3.55 1225 0.30 37.83 3.00 9.00 8.08 0.96 5 18.70 420 14.50 0.30 44.77 2.00 9.00 723 1.14 6 2.19 0.49 1.70 0.30 524 0.50 5.00 2.48 0.57 7 6.08 1.36 4.72 0.30 14.56 0.50 5.00 321 0.94 8 1.86 0.41 1.45 0.30 4.45 1.00 5.00 3.09 0.44 9 1.13 025 0.88 0.30 2.71 0.50 5.00 2.05 0.41 10 2.05 0.46 1.59 0.30 4.91 0.50 5.00 2.38 0.56 11 1.50 0.33 1.17 0.30 3.59 0.50 5.00 3.64 0.33 12 0.80 0.18 0.62 0.30 1.92 0.50 5.00 2.94 024 13 1.60 0.36 124 0.30 3.83 0.50 5.00 3.64 0.33 14 4.57 1.02 3.55 0.30 10.94 0.80 5.00 3.58 0.73 15 1933. 4.34 14.99 0.30 4628 4.00 18.00 9.41 0.99 16 1.12 025 0.87 0.30 2.68 2.70 5.00 3.71 026 17 1 2.04 0.45 1.59 0.30 4.88 4.00 9.00 1 4.95 0.33 18 0.60 0.14 0.46 0.30 1.44 4.00 5.00 3.37 0.17 19 20 21 22 23 24 25 26 27 28 29 30 Operation & Maintenance Agreement Project Name: Buffalo Creek Subdivision Project Location: Hoke County, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s)on this project include (check all that apply&corres ondin O&M sheets will be added automatically): Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: Location(s): Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader-Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: Yes Type: Curb outlets stem I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Graceland Development, LLC. -Joey Peinfield Title&Organization: Owner/Developer Street address: P.O. Box 531 City,state, zip: Parkton, NC 28371 Phone number(s): (910)709-8711 Email: Signature: Date: I, , a Notary Public for the State of County of do hereby certify that personally appeared before me this day of and acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, Seal My commission expires STORM-EZ 8/28/2023 Version 1.5 O&M Agreement Pagel of 4 Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area. After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. The vegetated conveyance or vegetated receiving area will be inspected quarterly . Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetation Vegetation is too short or Maintain grassed vegetation such that the swale or vegetated too long. area does not erode during the peak flow from the 10-year storm Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re- erosive gullies have sod (or plant with other appropriate species) and water until Vegetated receiving formed. established. Provide lime and a one-time fertilizer application. areas Trees and/or other woody Remove the trees and woody vegetation from the swale, regrade vegetation are present in the swale if necessary and re-establish grass as shown on the the swale. approved plans. Trash/debris is present. Remove the trash/debris. Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re- erosive gullies have sod (or plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application. Sediment covers the grass Remove sediment and dispose in an area that will not impact Vegetated conveyances at the bottom of the swale. streams or SCMs. Re-sod if necessary. / swales / roadside Regrade the slopes to the permitted configuration per the ditches (other than curb The side slope is steeper than the approved approved plan and reestablish vegetation. If as-built or existing outlet swales) pp conditions do not allow the slopes to be regraded, contact the configuration. applicable permitting agency. Determine the source of the problem: soils, hydrology, disease, Grass is dead, diseased or etc. Remedy the problem and replace plants. Provide a one-tim dying. fertilizer application to establish the ground cover if necessary. Trees and/or other woody Remove the trees and woody vegetation from the vegetated vegetation are present in conveyance, regrade the vegetated conveyance if necessary the vegetated conveyance. and re-establish grass as shown on the approved plans. The longitudinal slope Regrade to meet the permitted longitudinal slope as shown on th exceeds 5%. approved plans. Curb outlet swales or The swale profile does not Regrade the swale to the approved profile as shown on the vegetated areas match the approved detail. approved plans. The length of the swale or Extend the swale to achieve the 100-foot minimum length. If as- vegetated area is less built or existing conditions do not allow the slopes to be regraded, than 100 feet. contact the applicable permitting agency. Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device (if applicable) The outlet device is Repair or replace the outlet device. damaged Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the site are causing erosion or sedimentation in the Contact the local NCDEQ Regional Office. receiving water.