HomeMy WebLinkAboutSW6231109_Design Calculations_20240315 PROJECT 50130756-Barker Laydown Yard Dewberry CLIENT Duke Energy Progress, LLC CALCULATION SHEET TITLE Rational Method Peak Flow Designer DLS Reviewer DAR Sheet No. Date 3/12/2024 Date 3/12/2024 1 of 2 Post-Development Ditch 1 (PD-1) Land Use Area(acres) C-Value Impervious 3.00 0.95 C-Values found using the Agricultural Land (Crop) 0.00 0.40 information provided by the NCDEQ. Cumulative 3.00 0.95 PROJECT e r �e50130756-Barker Laydown Yard CLIENT Duke Energy Progress, LLC CALCULATION SHEET TITLE Rational Method Peak Flow Designer I DLS Reviewer DAR I Sheet No. Date 3/12/2024 Date 3/12/2024 2 of 2 Post-Development Ditch 2(PD-2) Land Use Area(acres) C-Value Impervious 2.47 0.95 C-Values found using the Agricultural Land (Crop) 0.00 0.40 information provided by the NCDEQ. Cumulative 2.47 0.95 Project:50130756-Barker Laydown Yard Dewberry® Client:Duke Energy Progress,LLC • Title:Level Spreader Design www.dewberry.com Date:3/13/2024 LS-FS MDC 1:Level Spreader Length The level spreader shall be a minimum often feet in length per one cubic foot per second of stormwater flow that is directed to it. PD1 C= 0.95 10-Yr Storm(5-min Tc) Design Storm l ntensity= 0.75 in/hr �in/hr A= 3 acres Q=F 2.14 cfs 22.80 cfs L=LLE5 LF 228 LF PD2 C= 0.95 10-Yr Storm(5-min Tc) Design Storm Intensity=W.75 in/hr -in/hr A= 2.47 acres Q=F 1.76 cfs 18.77 cfs L=LIL599 LF 187.72 LF Combined C= 0.95 10-Yr Storm(5-min Tc) Design Storm Intensity= 0.75 in/hr - A= 5.47 acres Q= 3.90 cfs L=L38.974 LF <=TARGET REQUIRED LENGTH L= 226 LF 418 LF <=PROPOSED LENGTH MDC Met?Yes Comments: PD1 and PD2 represent the edge swales that will convey runoff to the blind swale(BS)and level spreader(LS).The combined calculations combines PD1 and PD2 to determine final target length of the LS.The BS will be flat to promote ponding and uniform overflow.The BS is sized based on the combined flow,both edge swales are designed based on the max flow in PD1. The LS is oversized to more closely mimic the low lying area on site where the filter strip will be placed;and,to promote longevity and provide reslience LS-FS MDC 2:Required Storm Intensity and Bypass The required storm intensity and bypass system shall be based on the source of the stormwater: (a) A level spreader that receives flow directly from the drainage area shall be sized based on the flow rate during the 0.75 inch per hour storm,with a flow bypass system for larger storm events;or (b) A level spreader that receives flow from an SCM shall be sized based on the draw down rate of the design volume,with a flow bypass for larger storm events. MDC Met?Yes Comments:There are no storm outfalls and no other SCMs.The LS-FS lengths have been designed for the 0.75 in/hr storm event LS-FS MDC 3:Exception from Flow Bypass Requirement A flow bypass system is not needed if the level spreader is sized to handle the flow during 10-year storm event. MDC Met?Yes Comments:Sized for 10-Yr Storm.See MDC 4 calcs 1 of Project:50130756-Barker Laydown Yard Dewberry® Client:Duke Energy Progress,LLC • Title:Level Spreader Design www.dewberry.com Date:3/13/2024 LS-FS MDC 4:Blind Swale Immediately upslope of the level spreader,there shall be a blind swale or other method of ponding water.The blind swale shall be designed to provide for uniform overtopping of the level spreader. Permissible shear stress, Ta up(Ib/ft2) 0.33 (No.57 Stone) 0.45 (Jute Liner) Design storm LS-FS MDC Required Flow,Q(cfs) 41.57 22.80 PD1 Required Flow-Edge Conditions,Q(cfs) Unit weigt of water,y(lb/ft') 62.4 18.77 PD2 Required Flow-Edge Conditions,Q(cfs) Channel slope,s(ft/ft) 0.003 m � m V-Shaped v v Y s > U U v a v a - b:m 0 0 0 T ¢ ; E `�° E� � o v x o v o a a . o' o) o o 3 d = U a n > > U C7 U U n U (ft) (ft) (ft2) (ft) (ft) (ft) (lb/ft2) (ft/s) (cfs) (lb/ft2) Q � J W Z CO PD1 3 0 1.5 9.0 6.75 9.49 0.71 3.56 0.022 0.45 2.96 U 19.96 > 0.28 0 U W W Of z z PD2 3 0 1.47 8.8 6.48 9.30 0.70 3.49 0.022 0.45 2.92 U 18.91 0 0.28 0 U W Of o `m A v a t0 a > � 0) V -c L K U a+ o), N 4) 4) V-Shaped-BS o o z v _ N = N > a 0 a -No.57 Stone " "~ y x g a �Y �o � 2 o o c, L L� Check N N o f `° o o 0 0-.. o o (ft) (ft) (ft2) (ft) (ft) 5 (lb/ft2) (ft/s) (cfs) (lb/ft2) Q O o z w 71, F F -ml w z CO PD1 3 0 1.5 9.0 6.75 9.49 0.71 3.56 0.022 0.33 2.96 U 19.96 > 0.28 0 U W W Of } z PD2 3 0 1.47 8.8 6.48 9.30 0.70 3.49 0.022 0.33 2.92 U 18.91 0 0.28 0 U W > MDC Met?Yes Comments:The V-Shaped channel calculations confirm capacity and velocity based on a jute liner during the 10-Yr storm. Note that PD1 does not meet the target Q10 of 22.8 CFS--the drainage areas for PD1 and PD2 are highly conservative in that roughly 50%of the drainage areas actually flow directly to the blind swale;therefore,the velocity and capactiy check are considered valid for meeting the 10- Yr MDC.The BS will be at a constant 0.0%slope to allow ponding and overtopping.The BS No.57 Stone check is used to confirm that the No.57 Stone liner in the BS can withstand the entrant shear stresses from PD-1 and PD-2. 2 of Project:50130756-Barker Laydown Yard Dewberry® Client:Duke Energy Progress,LLC • Title:Level Spreader Design www.dewberry.com Date:3/13/2024 LS-FS MDC 6:Level Spreader Shape The level spreader shall be straight or convex in plan view. MDC Met?Yes Comments:See plan LS-FS MDC 7:Transition Zone Immediately downslope of the lev re shall be a one to three-inch drop followed by a transition zone that is protected from erosion via aggregate or high pert nforcement matting.The transition zone shall be a minimum of 12 inches wide. MDC Met?Yes Comments:Transition zone consists of No.57 stone see detail LS-FS MDC 8:Minimum Width of the Filter Strip The minimum width of the filter strip shall be 30 feet,measured perpendicular to the level spreader lip. Filter Strip Provided:30 LF MDC Met?Yes Comments: LS-FS MDC 9:No Draws or Channels in the Filter Strip The filter strip shall not contain draws or channels. MDC Met?Yes Comments: LS-FS MDC 10:Filter Strip Specifications (a) Filter strips shall be graded with a uniform transverse slope of eight percent or less; (b) The pH,compaction and other attributes of the first 12 inches of the soil shall be adjusted if necessary to promote plant establishment and growth; (c) The filter strip and side slopes shall be planted with non-clumping,deep-rooted grass sod;and (d) Soils shall be stabilized with temporary means such as straw or matting until the permanent vegetative cover has taken root or the runoff shall be directed elsewhere until vegetation has been established. (a)Max Slope: 3.50% (b)pH Requirements: See Plans (c)Sod Regs: See Plans (d)Stabilization: See Plans MDC Met?Yes Comments:The LS detail calls for 8%maximum slope to ensure contractor flexibility for meeting grades if site conditions differfrom plans;however,anticipated slope based on surveyed and observed conditions is 1.7% 3 of