HomeMy WebLinkAboutNCG090006_Mallard Creek Polymers Report_20240315 C h a ff o Mfl-Jlf ec4m burg STORM Facility Inspection Wi E Storm W ate r.CharMeck,org swiceS u Facility Name: Mallard Creek Polymers Incorporated Inspection#: 82873 Contact: Jens Schoenfuss, EH&S Manager Permit#: NCG090006 Inspector: Michael Schley Receiving Stream: Mallard Creek Inspection Date: 03/12/2024 Entry Time: 1:00 pm Exit Time: 2:00 pm SIC#: Ar� SUMMARY Facility Description: Mallard Creek Polymers is located at 2800 Morehead Road in Charlotte, NC on two parcels,which total approximately 65 acres.The facility recently added a storage building to the facility on the second parcel. Mallard Creek Polymers manufactures a variety of latex polymer products. File Review/History: Charlotte-Mecklenburg Storm Water Services (CMSWS)previously inspected the facility on 2/18/2 021 and the report was issued as satisfactory. The facility received NOVs relating to two separate spills on 2/23/2022 and 2/14/2023. Inspection Summary: Mallard Creek Polymers was observed to be in compliance with the City of Charlotte Stormwater Pollution Control Ordinance. Please refer to the report for comments and recommendations. —910 Site Inspection Deficiency Comments Stormwater system (catch basins, Satisfactory Stormwater flows through the site via sheet flow. The facility inlets, outfalls, etc.) has four SCMs which receive sheet flow from different areas of the site and stormwater discharges via four outfalls. No stormwater pollution issues were observed. Erosion issues Satisfactory No stormwater erosion issues were observed. Structural stormwater control Satisfactory Four SCMs were observed onsite. Per facility staff,the SCMs measures(SCMs) act as additional containment in case of a spill at the facility. No stormwater pollution issues were observed. Illicit discharges/connections Satisfactory No illicit discharges or connections were observed onsite during the inspection. Aboveground storage tank(s)(ASTs) Satisfactory The facility has many ASTs throughout the facility.A and any associated venting and/or complete list of AST contents, locations, sizes, and dispenser(s)—list tank size(s)and containment can be found in the the SWPPP and SPCC. No contents stormwater pollution issues were observed. Underground storage tank(s)(USTs) N/A and any associated fill port area(s) and dispenser(s)—list tank size(s) and contents Outdoor material storage area(s) Satisfactory 275-gallon totes and 55-gallon drums of assorted polymer products were observed to be kept sealed and labeled outdoors.Assorted equipment, scrap metal, and wood pallets were observed to be kept outdoors uncovered. No stormwater pollution issues were observed. Outdoor processing area(s) Satisfactory The facility's manufacturing process occurs in outdoor and indoor areas throughout the facility. No stormwater pollution issues were observed. Loading/unloading area(s) Satisfactory Per facility staff, liquid products are loaded and unloaded from tanker trucks in designated areas of the site. No stormwater pollution issues were observed. To report pollution or drainage problems call: 311 CHARLOTTE. http://stormwater.charmeck.org �� .. 3/15/2024 9:40:57AM Page 1 of 3 Site Inspection Deficiency Comments Vehicle/equipment area(s)-fueling, Satisfactory Per facility staff, equipment maintenance is completed inside maintenance,washing, storage, etc. the facility. Fueling is conducted outside at the onsite diesel fuel AST.Vehicles and equipment are stored outdoors. No vehicle or equipment washing is conducted onsite. No stormwater pollution issues were observed. Oil/water separator and/or Satisfactory Per facility staff,the facility has an industrial wastewater pretreatment pretreatment system and permit with Charlotte Water. Once treated and tested, onsite wastewater can be discharged to the Charlotte Water sanitary sewer system. No stormwater pollution issues were observed. Waste storage/disposal area(s)- Recommendation Two general waste open top containers and one scrap metal open tops,waste containers, scrap open top container were observed to be kept uncovered metal bins, etc. outdoors. CMSWS recommends all outdoor waste containers are kept covered to prevent stormwater exposure. Food service area(s) N/A Indoor material storage area(s) Satisfactory Assorted supplies and equipment for manufacturing were observed to be stored inside the facility. No stormwater pollution issues were observed. Indoor processing area(s) Satisfactory The facility manufacturing process occurs in indoor and outdoor areas throughout the facility. No stormwater pollution issues were observed. Floor drains Satisfactory Per facility staff,floor drains inside the facility discharge to the wastewater treatment system. No stormwater pollution issues were observed. Spill response equipment Satisfactory Spill response equipment was observed throughout the facility. SWPPP Section Observed Comments Does the facility have a Stormwater Satisfactory Pollution Prevention Plan (SWPPP)? Reviewed and updated annually Satisfactory The SWPPP was reviewed and updated on 12/20/2023. Responsible party Satisfactory General location (USGS)map Satisfactory Detailed site map Satisfactory Narrative description of industrial Satisfactory processes Feasibility study Satisfactory Evaluation of stormwater outfalls(non Satisfactory A non-stormwater discharge evaluation was recorded on 5/23/ -stormwater discharge evaluation) 2023. Stormwater best management Satisfactory practice(BMP)summary Secondary containment plan (all Satisfactory necessary secondary containment provided and documented) Records on every release from a Satisfactory secondary containment system (for the last 5 years) Spill prevention and response Satisfactory procedures(SPRP) List of significant spills or leaks(for Satisfactory A list of significant spills was included in the SWPPP and a the last 3 years) notation of'No spills'was included for years in which a spill did not occur. Solvent management plan (SMP) Satisfactory To report pollution or drainage problems call: 311 CHARIAI'TE_ http://stormwater.charmeck.org 3/15/2024 9:40:57AM Page 2 of 3 SWPPP Section Observed Comments Preventative maintenance and good Satisfactory housekeeping program (PMGHP) Facility inspections conducted as Recommendation Stormwater discharge checks are conducted daily throughout required the site using a provided checklist and are recorded in the SWPPP. Per facility staff, complete stormwater inspections are conducted semi-annually and are recorded in the SWPPP, most recently on 8/18/2023.The facility should conduct facility inspections quarterly per the NCG090006 permit, part B-11. Employee training (provided and Satisfactory Employee training was provided and documented in the documented) I I SWPPP between October 2023 and January 2024. Qualitative/Analytical Monitoring Observed Comments Qualitative monitoring conducted as Satisfactory Qualitative monitoring was conducted and recorded as required required on 8/3/2023, 12/8/2023, and 3/7/2024. Analytical monitoring conducted as Satisfactory Analytical monitoring was conducted and recorded as required required on 8/3/2023, 12/8/2023, and 3/7/2024. Analytical monitoring for onsite N/A vehicle and equipment maintenance as required Permit and Outfalls Observed Comments Copy of permit and certificate of Satisfactory NCG090006. coverage onsite All outfalls observed Yes No stormwater pollution issues were observed. Number of Outfalls Observed 4 Representative outfall status N/A documented by DEMLR Annual no-exposure self re-certificatio N/A n documented (& To report pollution or drainage problems call: 311 CHARLUFTE http://stormwater.charmeck.org 3/15/2024 9:40:57AM Page 3 of 3