HomeMy WebLinkAboutSAW-2024-00384 Revised Impacts TableSAW-2024-00384, Rhoda Street Culvert Replacement and Flood Damage Repair- Town of Canton
D. 3. Stream Impacts Table - Revised 3/14/2024
3a. Reason for impact*
3b.lmpact type*
3c. Type of impact*
3d. S. name*
3e. Stream Type*
3f. Type of Jurisdiction*
3g. S. width*
3h. Impact length*
S1
Equipment Access/Dewatering
Permanent
Bank Stabilization
UT -Pigeon River
Perennial
Both
13 Average (feet)
46 (linearfeet)
S2
Culvert Replacement/Maintenance
Permanent
Dewatering
UT -Pigeon River
Perennial
Both
8 Average (feet)
48 (linear feet)
S3
Culvert
Permanent
Culvert
UT -Pigeon River
Perennial
Both
12 Average (feet)
26 (linear feet)
S4
Equipment Access/Dewatering
Permanent
Bank Stabilization
UT -Pigeon River
Perennial
Both
18 Average (feet)
244 (linearfeet)
3i. Totaljurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
364
3i. Total temporary stream impacts:
0
3i. Total stream and ditch impacts:
364