Loading...
HomeMy WebLinkAbout20221395 Ver 2_CAMA Application_20240201Permit Application Report Application ID Application Type Submitted App Complete Deadline Decision Expiration PA-1140 DCM Major Modification 11-14-2023 02-01-2024 04-16-2024 Primary Applicant Information Applicant Type Title Business Name Name Email Business Phone Mobile Phone Individual Mr. Barney McLaughlin barneymac2@gmail.com 8046410423 8046410423 Physical Address Mailing Address Street 1 City State Zip Street 1 City State Zip 509 Turner St Beaufort NC 28516 509 Turner St Beaufort NC 28516 Additional Applicant Information Applicant Type Title Business Name Name Email Business Phone Mobile Phone Individual Mr. Andre Webb webbddc@gmail.com 252-665-4378 252-665-4378 Physical Address Mailing Address Street 1 City State Zip Street 1 City State Zip 3413 Old Airport Rd New Bern NC 28562 3413 Old Airport Rd New Bern NC 28562 Registered Agent Information Agent Type Title Business Name IName Email Business Phone Mobile Phone Individual Mr. Andre Webb webbddc@gmail.com 252-665-4378 252-665-4378 Physical Address Mailing Address Street 1 City State Zip Street 1 City State Zip 3413 Old Airport Rd New Bern NC 28562 3413 Old Airport Rd New Bern NC 28562 Project Information Project Name Project Type Disturbed Land Area (Scl Ft/Acres) McLaughlin, Barney & Martha Private/Community 1800 Sq. Ft. / Acres Is proposed project located in national registered historic district or national register listed/eligible: False List of previous state or federal permits for work on project tract: Project Location Information Address County River Basin Subdivision County Parcel ID Latitude Longitude 517 Turner Street Beaufort, NC 28516 Carteret White Oak Project Discharges to State Waters Discharge Type Surface Runoff Sanitary Wastewater Industry/Commercial Effluent Vessel Wash Down Residential Other Wastewater/Stormwater Discharged Into Wetland? Discharge Same Salinity as Receiving Waters Is There Any Mitigation Proposed False False False Detailed Description of the Existing Development Located on the Property Existing Man -Made Features: docking facility with boat lifts and wet slip Covered pump house Existing Land Uses: Residential Existing Wastewater Treatment/Disposal: Solid Waste/Fish Offal/Trash Disposal: Use and Daily Operations of the Protect When Complete Proposed Development Purpose: Recreational boating, fishing, wildlife observation and relaxation Buildings/Facilities/Units/Structures: Use & Daily Operations: Recreational boating, fishing, wildlife observation and relaxation Construction Methodology & Equipment: Barge and excavator Development Activities Narrative Specifics: Application Narrative: Project Narrative for Barney McLaughlin located at 517 Pine Street in Beaufort, INC. We are proposing to dredge the existing 30'x60' wet slip to -6.0' water depth at low tide. The existing water depth is -4.0' at low tide and more water depth is needed for lager boats that the slip can accomodate. We also proposing a 8'x24' roof cover over the existing dock platform to provide share for the existing sitting area. We propose a 170' of bulkhead and 1,430sgft of pavers outside the 30' buffer. The site consists of one parcel on 0.18 acres of land. The adjacent lot to the South is the location of townhomes owned by Turner Westward, LLC and the adjacent lot to the North is owned by NCDOT. The dredging method will include bucket and barge. The property is in Beaufort city limits and is zoned residential. Thank you for you time and consideration on this proposal. The project proponent hereby certifies that all information contained heroines true, accurate and complete to the best of my knowledge and belief. The project proponent hereby requests the the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. Thankyou Andre Webb 252-665-4378 Boat Ramp Development Activity Included: False Shoreline Stabilization Development Activity Included: True HasThere Been Erosion in the Preceding 12 Months Amount of Erosion (Feet Within the Past 12 Months) False Source of Erosion Amount Information Living Shoreline Development Activity Included: False Piers & Docking Facilities Development Activity Included: False Excavation Development Activity Included: True Excavation Details Amount & Type of Material to be Excavated From Below NHW or NWL Volume (Cu Yds) Area (Sq Ft) Type of Material "Other" Material Description 162 2,178.00 Mud/Fines; Sand Will Material Be Excavated From Any Of The Following Areas Area Sq. Ft. Affected Purpose of Fill in This Area Coastal Wetland/Marsh (CW) Submerged Aquatic Vegetation (SAV) Shell Bottom (SB) Other Non -Coastal Wetlands (WL) Wetlands Crossed Transporting Equipment to Site Steps Taken to Avoid/Minimize Environmental Impact False Excavation Purposes Purpose Length Width Avg Existing Depth Final Project Depth Access Channel (NWL or NLW) 66.00 33.00 4.00 6.00 Bridges & Culverts Development Activity Included: False Oceanfront Erosion Control Development Activity Included: False Temporary Structures Development Activity Included: False Utility Crossings Development Activity Included: False Freestanding Moorings, Buoys & Bird Nesting Poles Development Activity Included: False Log Removal/Marine Debris Development Activity Included: Yes/No Navigational Aids Development Activity Included: False Other Fill Below Water Level Development Activity Included: False Stormwater Structures Development Activity Included: False "Upland Development" Development Activity Included: True Upland Development Details # of Lots/Parcels Created Lots Platted & Recorded Date #Residential Units Units per Acre Area Size to be Disturbed (sq ft) Tract Has State or Local Approval 0 1430 False Date Site Development Plan Submitted Date Sedimentation & Erosion Control Plan Submitted Impervious Coverage (% Within AEC) Impervious Coverage (% of Entire Tract) Project Includes Innovative Stormwate Design 16.50 18.40 False Energy Facilities Development Activity Included: False Aquaculture Development Activity Included: False Submerged Lands Mining Development Activity Included: False General Development Activity Details Required Marina Development Activity Details Required