Loading...
HomeMy WebLinkAbout20240183 Ver 1_More Info Requested_20240307From: Snider, Hollev To: Shaver. Brad E CIV USARMY CESAW (USA); dlutheran(oseai.us Cc: bilKbcapefearcommercial.com Subject: RE: [External] RE: The Proximity at Watermark Date: Thursday, March 7, 2024 8:22:00 AM Good morning, The DWR has reviewed the application materials for this project (DWR Project #20240183) and supports the USACE request for additional information sent to the applicant to clarify and quantify the impacts associated with the development. The ePCN was received on 1/26/24. DWR received the application fee as required by 15A NCAC 02H .0502 (State application completeness requirements) on 1/31/24 which started the 60-day State review clock and began the 180-day federal reasonable period of time pursuant to 40 CFR Part 121.6, which ends on 7/29/24. Based on the pending request for additional information that is necessary to complete the 401 review, DWR will be placing the project on -hold until the request for additional information has been satisfied. Please feel free to call or email me if you have any questions. Sincerely, Holley Snider' - Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 *please note my email address has changed ho11ey.snider@deq.nc.gov* Q Fm Q� nun i • i : ,c;� :, Rr. SJPOF�o MpvVrwN al 6mMu.mMnlil O�MK 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Shaver, Brad E CIV USARMY CESAW (USA) <Brad.E.Shaver@usace.army.mil> Sent: Thursday, March 7, 2024 7:22 AM To: dlutheran@segi.us Cc: bill @capefearcommercial.com; Snider, Holley <holley.snider@deq.nc.gov> Subject: [External] RE: The Proximity at Watermark CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Morning Dana, I need to withdraw this application for lack of response. When you have addressed the needs outlined below please provide those items with an email requesting for the action to be reopened. Thanks, :..J Brad Shaver Project Manager US Army Corps of Engineers 69 Darlington Ave Wilmington, INC 28403 (910) 251-4611 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: https://regulatory.ops.usace.army.mil/customer-service-survevZ From: Shaver, Brad E CIV USARMY CESAW (USA) Sent: Tuesday, January 30, 2024 4:15 PM To: dlutheranPsegi.us Cc: bill (@capefearcommercial.com; Snider, Holley <holle)J.snider(@cIeq.nc.gov> Subject: RE: The Proximity at Watermark Sorry failed to provide a suspense for the response. Please return a response by the end of February, Feb 29, 2024. Thank you, Brad Brad Shaver Project Manager US Army Corps of Engineers 69 Darlington Ave Wilmington, NC 28403 (910) 251-4611 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: https://regulatory.ops.usace.army.mil/customer-service-survey[ From: Shaver, Brad E CIV USARMY CESAW (USA) Sent: Tuesday, January 30, 2024 4:14 PM To: dlutheran(cDsegi.us Cc: 'bill@capefearcommercial.com' <bill(@capefearcommercial.com>; Snider, Holley <hol le)1.snider(cDdeq.nc.gov> Subject: The Proximity at Watermark Dana, As opposed to waiting for DCM to confirm the project is outside their AEC I went ahead and reviewed the package for completeness. The following items are needed to make the package complete and ready for further processing: • Agent authorization statement provided was not signed the applicant, please have signed. • The adjacent waterbody was listed as SA which would have in turn required an individual cert however after confirmation with the State the proper designation would have been SC for the Cape Fear and C Sw for Barnards Creek. Please correct this on the PCN to avoid any confusion regarding the need for an Individual water quality certification. • The Corps will need the floodplain approval before any verifications can be rendered. • The PCN states a 40' long pipe whereas the drawings show a 38' pipe, please clarify. • Why is an approximate 40' crossing necessary for two opposing lanes of traffic? Most NCDOT secondary roads only have 2 (12') lanes, could further minimization be realized? • The grading limits appear to cross the wetland line in two additional areas, please refer to the grading drawing with highlighted areas. If grading is extending into the 404 areas authorization will be required. • There is a statement on the permit drawings "proposed pier access" but the drawing is cut short of the entire pier structure. If there will be pier improvements associated with the apartments this would need to be disclosed and authorized as part of a single and complete project. If you have any questions, please let me know, Brad Brad Shaver Project Manager US Army Corps of Engineers 69 Darlington Ave Wilmington, NC 28403 (910) 251-4611 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: https://regulatory.ops.usace.army.mil/customer-service-survey/