Loading...
HomeMy WebLinkAboutSWG030055_ Email_20240314 Peck, Kaitlin From: Peck, Kaitlin Sent: Thursday, March 14, 2024 3:30 PM To: HARRIS Laura Cc: Farkas, Jim J; svc_post_construction_stormwater;Joyner, Melissa Subject: SWG030055; Fayetteville Public Works Commission (Cumberland) Attachments: SWG030055_Cover Letter & COC_20240314.pdf, SSW-GPSWG03-20100616-DWQ- SPU.pdf Good Afternoon, On March 14th, 2024,the DEMLR received your application for a Clear and Grade Project to be covered under the State Stormwater General Permit Number SWG030000. In accordance with your application,we are forwarding herewith the subject Certificate of Coverage Number SWG030055, along with a copy of the General Permit,for Clearing and Grading. The General Permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and Title 15A NCAC 2H .1000,the stormwater management rules. Please take notice that this Certificate of Coverage is not transferable except by action to and approval by DEMLR.The DEMLR may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirement to obtain other permits which may be required by the Division of Energy, Mineral and Land Resources, the Division of Water Resources, Coastal Area Management Act, or any other Federal, State, or Local agency, law, rule, or ordinance. The original signed permit package and approved plans are being mailed to the permittee,Aaron Weldon, at the following address (NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deg.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Fayetteville Public Works Commission Attn: David Deschamps, Manager of Electric Engineering 955 Old Wilmington Road Fayetteville, NC 28301 We will hold onto our hard copy of this project for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, it will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact us at postconstruction@deg.nc.gov. Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov i NORTH CAROLINA Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: HARRIS Laura <laura.harris@booth-assoc.com> Sent:Tuesday, March 12, 2024 10:57 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: RE: [External] RE: SWG030055; Fayetteville Public Works Commission (Cumberland) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sounds good, thanks Kaitlin! Proof of submittal for the Rockfish project is attached. Laura Harris Project Engineer 111-Team Lead Booth &Associates, LLC office 919.851.8770 x 179 mobile 252.571.7871 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Tuesday, March 12, 2024 10:49 AM To: HARRIS Laura <laura.harris@booth-assoc.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: RE: [External] RE: SWG030055; Fayetteville Public Works Commission (Cumberland) They are! I had noticed this after I updated the autoreply and updated our database.This will be reflected when I update the autoreply tomorrow. Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov 2 NORTH CAROLINA Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: HARRIS Laura <laura.harris@booth-assoc.com> Sent:Tuesday, March 12, 2024 10:31 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: RE: [External] RE: SWG030055; Fayetteville Public Works Commission (Cumberland) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Kaitlin, Thanks! I'm working on the upload now. I have one question. I noticed there are two projects listed in the General Project Review Queue (see below). Are these (the "Fayetteville Public Works Commission" entry and the "Rockfish—134.9 Solar Utility Station—Tree Clearing" entry) meant to be the same project? General * Queue: OPRIM PubicLN or Orrlrrlii0n -n - Rockfish - B4.9 Solar UtiLity Station - Tree Clearing (General) Town of Rosman and City of Brevard Waterline Interconnect (General) Thanks! Laura Harris Project Engineer III—Team Lead Booth &Associates, LLC office 919.851.8770 x 179 mobile 252.571.7871 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Thursday, March 7, 2024 2:04 PM To: HARRIS Laura <laura.harris@booth-assoc.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: RE: [External] RE: SWG030055; Fayetteville Public Works Commission (Cumberland) 3 Newest set of plans, Newest set of application (and old if that is the only one that's signed), and newest USGS map. (And anything else you would like to include. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.Peck@deg.nc.gov D7:,.E NORTH CAROLINA Department of Environmental duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: HARRIS Laura <laura.harris@booth-assoc.com> Sent:Thursday, March 7, 2024 1:49 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: [External] RE: SWG030055; Fayetteville Public Works Commission (Cumberland) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Kaitlin, Thanks,will do! One question—since we have submitted an updated version of certain documents to have the package considered complete, do you want both versions uploaded (both old/outdated and new/updated)? Or just the new/updated? Laura Harris Project Engineer 111-Team Lead Booth &Associates, LLC office 919.851.8770 x 179 mobile 252.571.7871 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Thursday, March 7, 2024 1:22 PM To: HARRIS Laura <laura.harris@booth-assoc.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, 4 Melissa <melissa.ioyner@deq.nc.gov> Subject: SWG030055; Fayetteville Public Works Commission (Cumberland) Good Afternoon, We received your post-construction stormwater permit application for the subject project on 3/5/24. You can see where this project stands in the review queue by emailing postconstruction@deg.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected,the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SWG030055 Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: HARRIS Laura <laura.harris@booth-assoc.com> Sent:Tuesday, March 5, 2024 3:26 PM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: [External] RE: SWG03- Fayetteville Public Works Commission; Fayetteville, Cumberland County 5 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Kaitlin, As an update, the package was sent in and delivered to your office this morning! Thank you, Laura Harris Project Engineer III-Team Lead Booth &Associates, LLC office 919.851.8770 x 179 mobile 252.571.7871 From: HARRIS Laura Sent:Tuesday, February 27, 2024 10:11 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: RE: SWG03 - Fayetteville Public Works Commission; Fayetteville, Cumberland County Hi Kaitlin, Thank you! We will get this corrected and have updated plans to you—we will aim for the end of this week. Laura Harris Project Engineer 111-Team Lead Booth &Associates, LLC office 919.851.8770 x 179 mobile 252.571.7871 From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Tuesday, February 27, 2024 9:50 AM To: HARRIS Laura <laura.harris@booth-assoc.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: SWG03- Fayetteville Public Works Commission; Fayetteville, Cumberland County Good Morning, We received your application for a new post-construction stormwater permit on 2/23/24. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 3/28/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: • Project boundary delineation labeled with accurate bearings and distances. Please ensure that this is to scale.This is to certify that the total project area on the site plans matches the total project area listed on the NOI (1,205,500 sqft). 6 NOTE: Please be aware that an individual permit will be required prior to the construction of any BUA on this site. Incidental impervious surfaces, such as concrete pads, solar panel foots, access roads, etc. are not exempt per Part E-6 of the manual. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov ,c,- D E '�:" 'W "O) NORTH CAROUNA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 8