Loading...
HomeMy WebLinkAboutSWA000228_Stormwater Report_20240226 TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. STORMWATER REPORT CIRCLE K - NTI DUNN, NORTH CAROLINA rl h N FEBRUARY 22, 2024 PREPARED FOR: Circle K Stores Inc. 1100 Situs Court Suite 100 Raleigh, NC 27606 PREPARED BY: Timmons Group, NC License No. 023728 5410 Trinity Road, Suite 102 Raleigh, North Carolina 27607 www.timmons.com Circle K—NTI Dunn, NC Project Number: 37630.123 Table of Contents StormwaterNarrative......................................................................................................................................... 1 ProjectBackground........................................................................................................................................ 1 Proposed Project Description......................................................................................................................... 1 Proposed Stormwater Management............................................................................................................... 1 Stormwater Runoff Control ......................................................................................................................... 1 TSSRemoval ............................................................................................................................................. 1 SeasonalHigh Water Table........................................................................................................................2 Methodology for Stormwater Modeling .......................................................................................................2 Hydrology...................................................................................................................................................2 Hydraulics ..................................................................................................................................................2 Pre & Post Development Runoff Summary.................................................................................................2 ReferenceMaterial ............................................................................................................................................3 NOAARainfall Data .......................................................................................................................................3 USGSMap.....................................................................................................................................................3 FEMAMap.....................................................................................................................................................3 SoilSurvey Map.............................................................................................................................................3 SHWTReport.................................................................................................................................................3 Pre/Post Development Drainage Area Maps..................................................................................................3 PeakFlow Analysis ...........................................................................................................................................4 Worksheet— Curve Numbers.........................................................................................................................4 HydraflowReport...........................................................................................................................................4 SCMDesign Calculations..................................................................................................................................5 WetPond Worksheets ...................................................................................................................................5 Outlet Protection Calculations........................................................................................................................5 StormwaterSupplement Forms......................................................................................................................5 Stormwater Operation & Maintenance Agreement.............................................................................................6 Hydraulic Grade Line Calculations.....................................................................................................................7 Q10 Analysis Using Hydraflow Software........................................................................................................7 Circle K—NTI Dunn, NC Project Number: 37630.123 Stormwater Narrative Project Background The proposed Circle K project is located on the northwest corner at the intersection of South Lehmon Avenue and East Cumberland Street (US Hwy 421). The project site currently consists of two lots with vacant land. This project will result in one combined parcel. The total tract area of the combined lots is 3.79 acres. For reference, the subject property information is as follows: PINs: 1516-92-7895.000, 1526-02-0796.000 River Basin: Cape Fear Classification: C;Sw Stream: Mingo Swamp Total Project Site Acreage: 3.79 ac Total Disturbed Acreage: 3.80 ac Latitude & Longitude: 35017'45.47"N -78035'49.75"W There are 0.02 acres (0.53%) of existing impervious cover onsite. The site is in hydrologic soil groups "A" and "D". Approximately half of the site flows to a ditch along East Cumberland Street (US Hwy 421). The rest of the site flows to the south end of the property and exits the site through an existing 18" RCP. FIRM Panels 3720150600J & 3720152600K indicate the site does not contain special flood hazard areas. No site development is proposed near a jurisdictional stream. Proposed Project Description This project proposes a convenience store with parking, gas pumps with associated canopy, high speed diesel pumps with associated parking and canopy, driveways and utilities. There is approximately 0.02 AC of existing impervious cover within the property boundary. The proposed improvements will result in a post-developed impervious cover of 2.01 AC (including 0.2 ac (8,712 SF) future impervious), which is approximately 53.0% of the total site area. Proposed Stormwater Management The proposed project consists of a convenience store with parking, gas pumps with associated canopy, high- speed diesel pumps with associated parking and canopy, driveways, and utilities. The proposed development will increase the onsite impervious cover from 0.02 acres to 2.01 acres (including 0.2 ac future impervious). To the extent practical, the onsite impervious runoff will be directed toward two wet detention ponds. The remaining impervious area will flow offsite via a permanent diversion ditch. This design maintains the existing drainage pattern. Stormwater Runoff Control Two wet detention ponds are proposed to improve the quantity and quality of stormwater runoff for the site in compliance with the rules contained in the NCDEQ Stormwater Design Manual. TSS Removal The NCDEQ requirement of 85% Total Suspended Solid removal requirement has been exceeded by the proposed wet pond facilities. TIMMONS GROUP 1 I www.timmons.com YV VI S1VN RCHIL VkU IHNV U--- Circle K—NTI Dunn, NC Project Number: 37630.123 Seasonal High Water Table A seasonal high water table investigation was performed by Piedmont Environmental Associates. The attached report indicates that at the location of Wet Pond #1, the SHWT is at elevation 181'-187'. At the location of Wet Pond #2, the SHWT is at elevation 187.5-189.5'. See the attached report for more detailed information. Methodology for Stormwater Modeling A pre-development and post-development hydrologic analysis was completed for the site using the SCS TR20 method. A hydraulic analysis was completed using Hydraflow modeling software to route these storm events through the proposed wet pond facilities and outlet structures. Hydrology The SCS TR20 method was used to determine the peak discharge rates for the pre-development and post- development conditions, develop runoff hydrographs and size the detention storage for the SCM. Rainfall data used in the design was taken from published NOAA data for the City of Winston-Salem. SCS runoff curve numbers were based on Table 2-2 in the TR55 manual. The Time of Concentration (Tc) values were determined using the TR55 method for sheet, shallow and concentrated flows, with a minimum Tc of 5 minutes. Hydraulics Computer simulated reservoir routing using Hydraflow modeling software was completed for the 1-year, 2-year, 10-year, and 100-year storm events utilizing stage-storage and stage-discharge functions. Stage-storage was determined using the proposed grading contours of the detention system and stage-discharge functions were developed using the proposed outlet structures. The outlet structures were designed to attenuate the post- development discharge rates for the 1 and 2-year events equal to or less than pre-development levels. Pre & Post Development Runoff Summary Total Site: Site Condition Storm Event cfs 1- ear cfs 2-year cfs 10- ear cfs 1 00- ear cfs Pre-Development 3.235 5.309 12.37 26.62 Post-Development 9.744 13.14 23.34 40.92 without Detention Post-Development 1.466 4.157 12.53 39.17 with Detention TIMMONS GROUP 21 www.timmons.com YOUR VISION RCHIk LD THROUGH OURS. Circle K—NTI Dunn, NC Project Number:37630.123 Reference Material NOAA Rainfall Data USGS Map FEMA Map Soil Survey Map SHWT Report Pre/Post Development Drainage Area Maps • r ■ TIMMONS GROUP 31 www.timmons.com YOUR VISION ACHIEVEO THROUGH Ou RS. 6/26/23,7:54 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 ' Location name: Dunn,North Carolina,USA* Latitude:35.29510,Longitude: -78.5974° Elevation: 191 ft** *source:ESRI Maps y� source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration� 2 10 25 50 100 200 500 1000 5-min 5.24 6.17 7.13 7.93 8.86 9.56 10.2 10.9 11.6 12.3 (4.80-5.76) (5.64-6.77) (6.53-7.82) (7.24-8.69) (8.05-9.68) (8.65-10.4) 1 (9.20-11.2) (9.72-11.8) (10.3-12.7) (10.8-13.4) 10-min 4.19 4.93 5.71 6.34 7.06 7.61 8.13 8.60 9.19 9.67 (3.83-4.60) (4.51-5.41) (5.23-6.26) (5.79-6.95) (6.41-7.72) (6.89-8.32) (7.31-8.87) (7.70-9.39) (8.15-10.0) (8.50-10.6) 15-min 3.49 4.13 4.82 5.35 5.96 6.43 6.85 7.24 7.72 8.09 (3.19-3.83) (3.78-4.53) (4.40-5.28) (4.88-5.86) (5.42-6.52) (5.82-7.02) (6.16-7.47) (6.48-7.90) (6.84-8.42) (7.12-8.84) 30-min 2.39 2.85 3.42 3.88 4.42 4.84 5.24 5.63 6.14 6.55 (2.19-2.63) (2.61-3.13) (3.13-3.75) (3.54-4.25) (4.01-4.83) (4.38-5.29) (4.72-5.72) (5.04-6.15) (5.44-6.70) (5.76-7.16) 60-min 1.49 1.79 2.19 2.52 2.94 3.28 3.61 3.95 4.40 4.78 (1.36-1.64) (1.64-1.96) (2.01-2.40) (2.30-2.76) (2.67-3.22) (2.97-3.58) (3.25-3.94) (3.54-4.31) (3.90-4.81) (4.20-5.23) 2-hr 0.874 1.06 1.32 F 1.82 2.07 2.31 2.57 2.92 3.23 (0.790-0.976) (0.956-1.18) 1 (1.19-1.46) 1 (1.63-2.03) (1.84-2.30) (2.05-2.57) (2.26-2.85) (2.55-3.24) (2.79-3.58) 3-hr 0.618 0.746 0.934 1.10 1.32 1.51 1.71 1.92 2.22 2.49 (0.560-0.692) (0.676-0.835) (0.845-1.04) (0.991-1.23) (1.18-1.47) 1 (1.34-1.68) 1 (1.51-1.90) 1 (1.68-2.14) 1 (1.93-2.48) (2.13-2.77) 6-hr 0.369 0.446 0.559 0.659 0.795 0.913 1.04 1.17 1.36 1.53 (0.336-0.411) (0.406-0.496) (0.507-0.621) (0.596-0.732) (0.714-0.881) (0.813-1.01) (0.915-1.14) 1 (1.02-1.29) 1 (1.17-1.50) 1 (1.30-1.69) 12-hr 0.216 0.260 0.328 0.389 0.472 0.546 0.623 0.708 0.831 0.940 (0.195-0.241) (0.236-0.291) (0.296-0.367) (0.349-0.434) (0.421-0.525) (0.483-0.605) (0.545-0.691) (0.613-0.784) (0.708-0.921) (0.789-1.04) 24-hr 0.127 0.154 0.197 0.233 0.283 0.324 0.367 0.414 0.481 0.536 (0.116-0.140) (0.140-0.170) (0.180-0.217) (0.211-0.256) (0.255-0.311) (0.291-0.356) (0.329-0.404) (0.369-0.456) (0.425-0.532) (0.470-0.594) 2-day 0.074 0.090 0.114 0.134 0.161 0.184 0.208 0.234 0.271 0.301 (0.068-0.081) (0.082-0.098) (0.104-0.124) (0.122-0.146) (0.146-0.176) (0.166-0.201) (0.187-0.228) (0.209-0.256) (0.240-0.298) (0.265-0.332) 3-day 0.052 0.063 0.080 0.093 0.112 0.128 0.144 0.162 0.186 0.207 (0.048-0.057) (0.058-0.069) (0.073-0.087) (0.086-0.102) (0.102-0.122) (0.116-0.139) (0.130-0.157) (0.145-0.176) (0.166-0.204) (0.182-0.227) 4-day 0.042 0.050 0.063 0.073 0.088 0.100 0.112 0.125 0.144 0.159 (0.038-0.045) (0.046-0.054) (0.058-0.068) (0.067-0.079) (0.080-0.095) (0.091-0.108) (0.102-0.122) (0.113-0.136) (0.129-0.157) (0.141-0.174) 7-day 0.027 0.033 0.041 0.047 0.056 0.063 0.071 0.079 0.090 0.099 (0.025-0.030) (0.030-0.036) (0.038-0.045) (0.043-0.051) (0.051-0.061) (0.058-0.069) (0.064-0.077) (0.071-0.086) (0.080-0.098) (0.088-0.108) 10-day 0.022 0.026 0.032 0.037 0.043 0.048 0.053 0.058 0.066 0.072 (0.020-0.023) (0.024-0.028) (0.030-0.034) (0.034-0.039) (0.040-0.046) (0.044-0.052) (0.049-0.057) (0.053-0.063) (0.060-0.071) (0.065-0.078) 20-day 0.014 0.017 0.021 0.024 0.028 0.031 0.034 0.037 0.041 0.045 (0.013-0.016) (0.016-0.019) (0.019-0.022) (0.022-0.026) (0.025-0.030) (0.028-0.033) (0.031-0.036) (0.034-0.040) (0.037-0.044) (0.040-0.048) 30-day 0.012 0.014 0.017 0.019 0.022 0.024 0.026 0.028 0.031 0.033 (0.011-0.013) (0.013-0.015) (0.016-0.018) (0.018-0.020) (0.020-0.023) (0.022-0.026) (0.024-0.028) (0.026-0.030) (0.028-0.033) (0.030-0.036) 45-day 0.010 0.012 0.014 0.015 0.017 0.019 0.021 T 0.022 0.024 0.026 (0.009-0.011) (0.011-0.013) (0.013-0.015) (0.014-0.017) (0.016-0.019) (0.018-0.020) (0.019-0.022) (0.020-0.024) (0.022-0.026) (0.024-0.028) 60-day 0.009 0.011 0.012 0.014 0.015 0.016 0.018 0.019 0.021 0.022 (0.008-o.010) (0.010-0.011) (0.012-0.013) (0.013-0.o14) (0.014-0.016) (0.015-0.018) (0.017-0.019) (0.018-o.020) (0.019-O.o22)I(0.020-0.023) Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PIMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.2951&Ion=-78.5974&data=intensity&units=english&series=pds 1/4 National Flood Hazard Layer FIRMette FEMA Legend 78°36'10"W 35°17'58"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT ` ; �� ■' Without Base Flood Elevation(BFE) 4 l Zone A,V,A99 SPECIAL FLOOD With BFE or Depth Zone AE,AO,AH,VE,AR HAZARD AREAS Regulatory Floodway �.: 0.2%Annual Chance Flood Hazard,Areas r' of 1%annual chance flood with average depth less than one foot or with drainage areas of less than one square mile zone x _ Future Conditions 1%Annual Chance Flood Hazard zonex Area with Reduced Flood Risk due to OTHER AREAS OF Levee.See Notes.zone x FLOOD HAZARD Area with Flood Risk due to Leveezone D IT• F DUNK • NO SCREEN Area of Minimal Flood Hazard zonex •+ * E TRATERRrr0FjALJURI5D1CT10-N, * Effective LOMRs I« - �" ?� OTHER AREAS Area of Undetermined Flood Hazard zone 1 r 1 r.• . "`�' y V WP GENERAL '---- Channel,Culvert,or Storm Sewer 1 STRUCTURES IIIIIII Levee,Dike,or Floodwall Cross Sections with 1%Annual Chance S 17•5 Water Surface Elevation AREA F MININ1ALFLO0D 8- - - Coastal Transect }r° }[M ^-5fa Base Flood Elevation Line(BFE) rTY OF DULqN Limit of Study Ti 7o2 .'- Jurisdiction Boundary ll' - - .,r -: - — Coastal Transect Baseline r F OTHER _ Profile Baseline r FEATURES Hydrographic Feature .r Digital Data Available N F _ No Digital Data Available MAP PANELS Unmapped ` The pin displayed on the map is an approximate � point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. a The basemap shown complies with FEMA's basemap accuracy standards L The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA.This map was exported on 6/26/2023 at 7:52 AM and does not reflect changes or amendments subsequent to this date and 5 «7•�, time.The NFHL and effective information may change or + k become superseded by new data over time. This map image is void if the one or more of the following map I elements do not appear:basemap imagery,flood zone labels, + legend,scale bar,map creation date,community identifiers, { FIRM panel number,and FIRM effective date.Map images for Feet 78°35'32"W 35°17'28"N unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 1:6'��� regulatory purposes. Basemap Imagery Source:USGS National Map 2023 Custom Soil Resource Report Map—Hydrologic Soil Group M M Ik W 718150 718220 718290 718360 718430 718500 718570 718640 718710 718780 35°17'52"N — _ — 35'17'52"N We 421 a FJ a y'e�fRi7 F o.i,l 35'17 37 N �� '� "' I — 35°17 3T N 718150 718220 718290 718360 718430 718500 718570 718640 718710 718780 3 3 Map Scale:1:3,220 i printed on A landscape(11"x 8.5")sheet. Meters N o 0 45 90 180 270 Feet 0 150 300 600 900 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 17 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) p C The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 0 C/D 1:24,000. Soils D Soil Rating Polygons Warning:Soil Map may not be valid at this scale. A 0 Not rated or not available Enlargement of maps beyond the scale of mapping can cause 0 A/D water Features misunderstanding of the detail of mapping and accuracy of soil 0 B Streams and Canals line placement.The maps do not show the small areas of Transportation contrasting soils that could have been shown at a more detailed 0 B/D Rails scale. � C Interstate Highways Please rely on the bar scale on each map sheet for map 0 C/D US Routes measurements. 0 D Major Roads Source of Map: Natural Resources Conservation Service 0 Not rated or not available Local Roads Web Soil Survey URL: Soil Rating Lines Background Coordinate System: Web Mercator(EPSG:3857) " x A Aerial® Photography Maps from the Web Soil Survey are based on the Web Mercator " r A/D projection,which preserves direction and shape but distorts B distance and area.A projection that preserves area,such as the Albers equal-area conic projection,should be used if more r.r B/D accurate calculations of distance or area are required. " r C This product is generated from the USDA-NRCS certified data as " 0 C/D of the version date(s)listed below. " r D Soil Survey Area: Harnett County, North Carolina " r Not rated or not available Survey Area Data: Version 20,Sep 8,2022 Soil Rating Points 0 A Soil map units are labeled(as space allows)for map scales 1:50,000 or larger. 0 A/D B Date(s)aerial images were photographed: Apr 24,2022—May 9,2022 B/D The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 18 Custom Soil Resource Report Table—Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Ly Lynchburg sandy loam,0 B/D 23.8 53.2% to 2 percent slopes NoA Norfolk loamy sand,0 to A 9.1 20.3% 2 percent slopes NoB Norfolk loamy sand,2 to A 11.5 25.7% 6 percent slopes OrB Orangeburg loamy sand, A 0.4 0.8% 2 to 6 percent slopes Totals for Area of Interest 44.7 100.0% Rating Options—Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff:None Specified Tie-break Rule: Higher 19 o _ - F� Qy _ 421 10 m M: C P T FJ,T F F fT �O �p� iP N`cTT E Greenwood �' �p �P F�CF Resthauem � mi- 09 p• ?�' / �(tP8 P 2 A , \ a Z 301 4 g W r � 08 3 2 Q o Q+ ('3 2 o `GAN LDOP RD , 07Iii P��O WARR=RD " l � Jern-iga-n Pon.d 100 1 r f "(\ DAMES BAREFOOT RD ` 1 � t- �j PIEDMONT 4: ENVIRONMENTAL ASSOC I A T E S , P . A . 3/20/2020 Project#4426 Timmons Group c/o: Jacob Dooley 5410 Trinity Rd, Suite 102 Raleigh,NC 27607 This report details the findings of a seasonally high-water table evaluation at the Circle K site, at 1106 East Cumberland Street, Dunn,NC. Your office gave the location of the proposed storm water control measure (SCM). G. Christopher Murray, Licensed Soil Scientist#1284, conducted the evaluation in June 2023. The results were as follows: Seasonally High-Water Table Soil Borings Soil borings were conducted at the locations specified on the attached map, and the depth to the seasonally high-water table (SHWT)was determined by observing soil indicators, also known as redoximorphic features. SHWT 1: Soil boring locations are shown on the attached map. Signs of a seasonally high-water table was observed from 22 inches to the cessation of boring at 96 inches. The native elevation in this area was approximately 189'. SHWT 2: Soil boring locations are shown on the attached map. Signs of a seasonally high-water table were observed from 13 inches to auger refusal at 38 inches. The native elevation in this area was approximately 190.5'. Boring ID SHWT Depth (inches) SHWT Elevation (feet) 1 22-96 187-181 2 13-38 189.5-187.5 Saturated hydraulic conductivity(Ksat)tests were not performed to predict infiltration as seasonal high-water table was observed within 24 inches of ground surface. 216 S. Swing Rd., Suite 1 Greensboro, NC 27409 336-662-5487 Piedmont Environmental Associates, PA is pleased to perform this work for you. If you have any questions,please feel free to call (336) 662-5487. Sincerely, soii s�,F \G� '�O F H ER w G 2 (.1 D 9l� 1284 ANORT" G. Christopher Murray N.C. Licensed Soil Scientist#1284 SHWT Boring Location - 1106 East Cumberland Street PIEDM40NT Job#4426 ENV 1 RO M M E N TAL 216 S. Swing Rd. Suite 1 pate: 6/9/2023 Assoc , A T e s , a . A . Greensboro, NC 27409 Client: Timmons Group pied montsoil.com County: Harnett P\NCT VAL1 WTT o P0R ��. Y °. n k r �� 11 wQlr BAR L� Or w eox' vue Y`,E.,66.e2, * SHV T Boring Locations &V; 14 371+0'�' , z. Pro e Line - +-- - � i,l SEtBACsc '�•�A �`,r�setpr r� Wr � IEy 1. nan>j �g r•. p r s'a-a,r ■ , to°nr't• >�m°.r �, , F S `�- ,u r ewL,xc> SHWF2! M% I�C,f•1 lI ■ �. a L ��MT'•C�r 1 1+ i �,1 CHIMP TOP 4 `r Ct°i0.-my k. ti^' `'J E't=4A' ,xs �r ,,. �' ■.• r'I,ien`" „use K :.:t:w.•a - = .!' Qf Rp� - two11 S�,1 5,' 11 "• wr�• �� sncaa `an,a xtux ',■ � V. cau i 1 �I , 7 L, . '�1A 11>t "U�.vLmi",W ]° !1 xtnh, alvca. =tnM „m(� .xt 1 '•,�� 1 �1 1�71'■�/�.�1 ��j} Y 1QtiAc . C7 � I ' S �1 ,'•Nl,s,e_,�_ ,tea °' , �„Y .�.,, >� � Teas o00 , �+ � ,,.� �,r .,.� .,.,a •, �>P`, M" BHT 1 ; 7S 4C Q °.v p,•n„�`a 1�✓ I a 5 PB 2Rs1-72 one _ S 1 1 yA + �¢ xtirq 've, ,xrnt � 'gym �n�• w .uva x"Q,., .tna i.,n.,. x,o,a, - .,na° rtnv eta xtn.r 1 �ao� ' tss+ • � . �r rear -Mn L ss • 1 'REBAR 1 t PT Ir �urq f! TRACT G .n,.a '`_ ,' •5~' i 11 + PINf,526-Q2-9796.OW •1 11 1 4 _ C'i • „A - 539.;4- „�vw .tan .tna �` .,oue 4y�M 2^�6 A1/{¢-ry 3 kTTL6 x, �,555�[si i5 11-G t,.ty �t"x •m,v "5,ax 1 °.. ,Hkr^° °v.n PT 57g' i O "NO' ,BUILDINGS 20Ce e� V; 1 55 aTancr a x „ 1 5 r a 2.989 ACRES 11 1 1 �, „� 5�, it r'' i �q� r i 1 I ► +r xtNav e, Y ',.1 1•' � '� �' x,we xtp=° xra� R,4eel 'xa°m +nn.x .msv � � q,cm � 4 1Ir ftoom �';�• , lV �•„i� •�oia \ xtWv xtny Ym1e xltlJr xtyti •,Wy xt�p°+ x,r.,.. atwpN a,y xnOae _ r.4cn x,py 2 E ,,�tt � , 1 * r� /2. OA ss �� ; o ' _ ..�.,� SHWT 1�. °r „gyp ti ia. -'` x,w r `i SOIL \ W� --- =+1D.Ta fJ` r -._��� IPF 112' �hYq I 9EBA9 BENT AR Gk' ,SOP HER f�� , � -_�f --2°' ,8 "- t �A�kAll rtrre°.to J EtE9lr,9,.37' r . 4 =' = - , -- ,"x•�m ;.xtny 1,.inchx—, -fig „ �j i264 �� n�'a1 °�\\ ;."tvui xncn =naa „•ad .-. epsue tY K)Ms y, a 1 } 95 WA \\ 'su _��� '.r��_ r� �� E1P \ ti - -` n6 yam.vv `S= lE OUT=186.30 /E=186.99 \BDI ON CON C - c� \\\ \ \ \ \ � ` _ TO�_ 0J 19o-54' \\ \\ \ \ SCS Weighted Curve Numbers - Pre-Development PIN# 1516-93-8114.000 /E 187 _ � ,N� \GA \ \ S N/F \- - - ' N � G \\\ \ \ JESSIE GASPER LLC& C/O CBOCS INC i ` U` \\ CB /Ot(V ON DA 1.0 (Analysis Point 1 \ DB 2504-0124 \ i o \\ c� TO =199. 7 Y \ I CD m I \�\ \\�E= FULL OF d TE Category *CN; A;(AC) CN;x A; ZONED: C-3 / 18�i.82\ Lawns/Managed O en S ace A Soils 39 0.41 16 RESTAURANT \ \ p p ( ) \ _ - - - - \'9� �� \ I \\ G�G-+ 300�x45tN1� \ Lawns/Managed Open Space (D Soils) 80 1.40 112 193- - - - - - - - - - - - \ OV�LRG\' \ Impervious 95 0.02 2 v, a� _ _ - - - T \ T _ \ °" ---L 1E=1\86.51� ANALYSIS POINT #2 1.83 130 ANALYSIS POINT #3 °H - _ - "T-- , ' -°HT HT C,_ °"�--\-- °NT G- T \ \ _ \ 24'RCP Ai �L CO \� - - _ _ °y' ' / - - G _ IE=185.51 y H OHP DA 1.1 (Analysis Point 2) \\ LS( VP) � `\ I \�=1\86.5�\ _ Category *CN; A;(Ac) CN;x A; - - _ ( ��40 I I / - \ FLOOD PP/EM TPEtl \ \\ Woods(A Soils) 30 0.28 8 H I I / \ LAMP \ \ \ \ \ \ Woods(D Soils) 77 0.55 42 f� 2 ^ `_ _�-___/_ - ___ OHP� / • I� II/^93' \\ \\ TRIANGLE \ I \\ \\ \ \\\\ \ \ Lawns/Managed Open Space (A Soils) 39 0.23 9 195 P�� \ / I \ FLOOD WAFFLE/JJ \G \ \ \ \ \ \\ Lawns/Managed Open Space (D Soils) 80 0.77 62 0\� I - \ LAMP PLUMBING SIGN \-� \ \ \ \ 1.83 121 G VND R�AD \\ \ Ai \ WORK SIGMDASHED \\ \ '\\ \I \ \ \ \ \ \ WHITE LINE DA 1.2 (Analysis Point 3) \ \ ` 0y` / / \ ` \ \ Category *CN; A;(AC) CN;x A; \ \ s \ M I \ \ \ \ \ CONC Woods A Soils 30 0.01 0 `�\ \ \ �` ♦ TC SEGMENT 1 : �� / �, \ \ \ \ \ MEDIAN ( ) SHEET FLOW � ' 'I� ' � 93' � � � I � \ \ Gr \\ \ \ \ \ \ Lawns/Managed Open Space (A Soils) 39 0.11 4 0.12 5 \\\ \ 50 LF @ 0.8% _ _ \ \\ \ \ (ci xAi) \ \ \ \\ 6 \ \ \ DA1 .2 r \ �\ \ I 1 C = = 38 \ \ \ �� `\ \\ \ o \\\ ZAi � \ \ \o \ \ \ SOLID \ \ \� \ TC SEGMENT 1 : / z \ \ YELLOWLINE SHEET FLOW x ♦ DA1 A . 1 ' TC SEGMENT 2: \\� ` ` � \`\\ ♦ � � , \ \� \ \ N \\ \ \ ♦ 50 LF @ 0.5% /�..,.; . \ SHALLOW \� \ \ \ \ \\\\ \ \\ \ \ \ • , / CONCENTRATED \ \ \ m \ \ m LEGEND TC SEGMENT 1 : \ \ ; ♦ W , , , \ FLOW SHEET FLOW \ o - _ 390 LF @ 2.4% R I G H T-O F-WAY � ONSITE IMPERVIOUS AREA \ 0 \ \ \ \ \\ \ 79 \ \\ \\ \ \ \\ ■ ■ ■ ■ DRAINAGE AREA BOUNDARY \ I �/ I �, \ \\ \ \ \ o 73 �� TIME OF CONCENTRATION \ \ N `\ �� ,♦ I 2 CD � I \\ \ \ \\ \\ `\ \\ \ \ (TC) PATH \ \� 2 \ M I I \ 12"INCH AoV u � cr I ♦ I _ \ SOIL TYPE BOUNDARY WATERL/NE \\ \\\\ NOV1 1B IPES ♦ ` I� �� I ` `o \\p \ \ \ \ n\ \ \ ♦ \• , G)\ \ \ \ 18 RCkV t \ A \ m \ \\ \ \ \Y , • �,;\ \ \ \ 1E=187.22\ \ \ \ A \ 192- - - - -, \ \ \ \ \ \ \ NO VISIBLE PIPES\ 10'WIDE o \ 72 \\ \ \ �/ CALC. l �, \ \ DIRT PT. \ t\� �; \ ROAD \ \ \ \ \ \ I ♦ \ \ \ \ \ I\ �� \ c \ \ \\\ \ \ \ \ -WWI, s79° 35 I I \ \ TBM TC SEGMENT 2 - - \�, TOP OF FIRE HYDRANT \ \ I \ \� / : �'A - /92- , \ �I� M 1 \ I \ \ (SEE DETAIL) ` \ \ \ / / SHALLOW CONCENTRATED FLOW 18"R'cP ELEV=197.94' \ \2 \ • I �/E-1 ' .44 I\ \ PPILP ,/ 448 LF @ 1 .5%AMH `~ TOP=96\\17 \\ IEIT2 IE OU =185.5 85.8� \ / \\No\ \ tea \\ 194 _ , � DA1 .0 \ \ \ \// 797. IE=18 .Id \ \ I \ \ \ ems \ I 0 CA PPILP SS-FM 8'EP \\ ` \ "RCP ' 10-0 toc \\ \ COD MARKING \ \ \ \ 190>51\ I' / ' L, SOLID \\\ \\ \ \ \ \\ I 8'WIDE \ �� \ \ ` DIRT ROAD WHITE LINE \\ \ 1 0 \ \ �; •-� - - - - - _ - _ - _ - TBM I ON ROAD \ - - - - - - - F - - - R I G H T-O F-WAY AG NAIL , LEHI \ - \, ELEV=191 7 \ oy `\ � \\\ \ �,- ��F_ _ - SANITARY SEWER _ -� ANALYSIS POINT #1 (PER PB. 2011-274 SOLID \ \` FORCE MAIN \ --- � 9, _ \\�• \ �� I \ - _ PER 811 ONE ` - WHITE LINE\1 1$ \\ \ \ \� \�L \ `\\\ \ CALL MARKINGS DOUBLE YELLOW\\\\ _ _ 190 - - - - c \ \\ \cl LINE �,\\ _ - - --__ � - 188 1\I,\ \\ 12"INCH \ \ � \ _ _ - - - - - _ _ - g9 \ �xx WATER LINE I \\ \ �, \\ \ _ _ _ _ - - \ I - - 24"RCP 1 d\ ` y2y \ \\\ \ , _ _ _ - - _189 - - 18"RCP 1E=185.20 \ \ � '"190� IE=188.05 \ P/N# 1526-02 -1445.000 N/F GA(TYP) SOUTH MCCULLEN ROAD, LLC PP/LP DB 4184-2642 PB 2011-724 Il ZONED: C-3 N \ \ / \ `\\ VACANT 37630m123 CIRCLE K DUNN NC 7 SCALE 1"=30' 0 30' 60' ORE DEVELOPMENT DRAINAGE AREA MAP - July 26 , 2023 TIMMONS GROUP S:\332\37630-123-NTI_CumberlandDunnNC\DWG\Sheet\Exhibit\37630.123-DA-PRE.dwg I Plotted on 8/7/2023 3:38 PM I by April Blye SCS Weighted Curve Numbers - Post-Development s PIN# 1516-93-8114.000 \ _ _ _ _ Z / \ \\ \ DA 2.0 (TO SC M 1) \ N/F \ �� `\\ \\ \ \ \ Category *CN; A;(Ac) CN;x A; JESSIE CASPER LLC& C/O CBOCS INC o � \\ \ \ Impervious 98 1.31 128 \ \ DB 2504-0124 / �� 11, \ '� \\ \ \ Lawns/Managed Open Space(A Soils) 39 0.28 11 \ 2 ZONED: C-3 , � m le \\ \ \ \ \ \ Lawns/Managed Open Space(D Soils) 80 0.18 14 RESTAURANT \ „92 �\ \�\ \ �\ \\ 1.77 154 � \ �/ OHT T _ 1 \ \ c_ nn �i M / OH7-� \ ANALYSIS POINT go , �' ' °y'� _ OHT — "T _ _ ANALYSIS POINT #2 DA 2.1 (TO SCM 2) NP OHT �""— Category *CN; A;(Ac) CN;x A; u, 1ss _ _ _ °y> _ _ G ' _ _\___ __ _ Impervious 98 0.68 67 \ 72 — — i � 1 Ilr'�'� �; 9 — — 1g2� \I \\ \ \ —____—_ Lawns/Managed Open Space(A Soils) 39 0.14 5 \ / 10S — — — — — / 1 / A � 1 \\ \ \a Lawns/Managed Open Space(D Soils) 80 0.33 26 \ \ \ vA v _ 1g3 — — —� �� — _ I �� / 1g3 \'�> V �\ Woods(A Soils) 30 0.12 4 s, \ \\ \ / / _ _ _ — _ Y ot 1ss — / 1 I I �. I \ \ \\\ \ \\ Woods (D Soils) 77 0.12 9 u' \\ N _ _ _192 _ _ _ — — —_—__ _ — — �oHP , I I �� ■ \ . \ \ \ \ 1.39 111 7Zy \\ `\ \ \ _1994- _ ` ' I l / ■ \ 1$8 ` \ \ \\\ \ (Ci x Ai) —195 OR \ r �� , I , 182 • \\ \ \\ \ \ \ N rn C�� UC6 • \ \ \\ \ \ DA 2.2 (Bypass to Analysis Point 1) 11 \\ \ \ / / I / ° \ \ \ �' ` 1 \ \\ \\ Category *CN; Ai(AC) CN;x Ai /9 I -e \ DASHED \� ` \ \ • I o _ I ` `\ \ WHITE LINE Impervious 98 0.02 2 \o?o\ ' .• / \ , \` \\ \\\ CONC Lawns/Managed Open Space(D Soils) 80 00.38.40 302 \\ \ \ \\ v2 \ \ \ \ ' 194 ` O ` \ \ \ \ MEDIAN \\ s q IN,\ v \ \ / A � 4 � I I \ \\ DA 2.3 (Bypass to Analysis Point 2) 42�1\ \ \ \ \ \\ ••• — \\ \\ \ \ \\` \ YELLOW LINE LID Category *CN; A;(Ac) CN;x A; \ '°s \' \ \ \ ■ v��� DA2. 1 ® I \ \ \ \ \\\ \ Lawns/Managed Open Space(D Soils) 80 0.10 8 �s s_ \ NN \ ■ I �� \ . \�, \ \\ \ \ Woods(D Soils) 77 0.01 1 N \ \ \ ■ 1 8 . \ \ \ \ \ 0.11 9 \\\\ FDA-2.4 \ i o.. . o o \ \ \ \\ c __ Z (Ci x Ai) = 80 \\ \ \ v ■ / �9 1� v \ V vv --A \ \ a` \ \ \ \ ■ / ° \\ \ \\ \ DA 2.4 (Bypass to Analysis Point 3) \ \ \ \ \\ \ \ i— _ _ _ // • ' \\ \ \\ \ \ \ Category *CN; A;(Ac) CN;x A; \ \ \ \ \\ \ o ■ `` • \ \\ \ \ \ rns m Lawns/Managed Open Space (D Soils) 80 0.12 10 \ \ \ \ ■ �, C� • \ c >w� 1�m ° \ �\ O 0.12 10 \ \ \ N \ ■ S (/) co �\ \ \ \ r- 12 /NCH \\ y \\ \ ` �s2 \ \\ \\ \\\ \ \ c �Ai WATER LINE \ \ ` \\ \ \ 'N — \ \ \\ \ \\ �ohi /�; � •• — ?�'� :\ \\ \ \ \�\ \\ \\ m LEGEND cy)W � •� J. �'�r ' �� � \ j \ \' \\ � ONSITE IMPERVIOUS AREA -A w \ J \ \ \ \ 0�O \� \ 2 SA '' \I •• \ �� \ \\ \\ \\ ROW IMPERVIOUS AREA 1 ` ^ \ \\ \ \\ M ■ ■ M DRAINAGE AREA BOUNDARY \\ 1 �� - 1\ \ TIME OF CONCENTRATION \ �\ \ I \\ \ �, •\ \ \\ (TC) PATH 1 � 2� \\ \ \ © 0 1\ \ `� DA2.2 \\ \\ SOIL TYPE BOUNDARY o\ \ y \ 5200 SQ. FT. (R3) / \\\ \ \N\ \• \ • 79 \ l I \\ 1 \ \\ \\\\ \ O O 2\ • \ • I \ \ \ \ \ \\� QNN 1-31 NN 1 \ \ \ \ \\ \�2 \ \ / •♦ / / \\ II I 1 I \o\ \\ \ Gm a\ \ \ / A88 1g3 �\ II i 1 \ \ \ \ \ a \ \ \ \ \� \\\\\\ `\ ,% NN ' N � _ SOLID . \ \ \ 31 \ \ \ \ '�'�_ _, a — — \\ w WHITE LINE o II �EH MON R \ \ 2 � _ 192- - - \ r 0. \\ o \\ ' \ \ \ _ \ — (PER PB SOLID 111�8g — ANALYSIS POINT #1 \ \ \ _ / \\ WHITE LINE\1 j 1 _ - - - \ \� DOUBLE YELLOW \\ \ \ \ \\ o - / LINE ss 12"INCH \\ \ WATER LINE 1 \\ \ 111: _t9 I \ \ \ \ / \\�\�\ \\�\ \ / / RAW PIN# 1526-02-1445.000 \ \ N/F \\\\ \ \ p���� \NN, I SOUTH MCCULLEN ROAD, LLC \ \ \\ \ i� \ DB 4184-2642 \ \\ \`� l PB 2011-724 \ \ , ZONED: C-3 \ \ U) \ \ VACANT 37630m123 CIRCLE K DUNN NC SCALE 1"=30' 0 30' 60' POST DEVELOPMENT DRAINAGE AREA MAP - February 21 , 2024 TIMMONS GROUP S:\332\37630-123-NTI_CumberlandDunnNC\DWG\Sheet\Exhibit\37630.123-DA-POST.dwg I Plotted on 2/26/2024 11:52 AM I by April Blye Circle K—NTI Dunn, NC Project Number: 37630.123 Peak Flow Analysis Worksheet — Curve Numbers Hydraflow Report TIMMONS GROUP 41 www.timmons.com YOUR VISION RCHIE-D THROUGH OURS. TIMMONS GROUP Project: Circle K- Dunn, NC Project No.: 37630.123 Calculated By: Alexis Pocai Date: 07/26/2023 SCS Weighted Curve Numbers - Pre-Development DA 1.0 (Analysis Point 1) Category *CN; A;(Ac) CN;x A; Lawns/Managed Open Space(A Soils) 39 0.41 16 Lawns/Managed Open Space(D Soils) 80 1.40 112 Impervious 95 0.02 2 1.83 130 Cc_ (CI x Ai) =ALL DA 1.1 (Analysis Point 2) Category *CN; A;(Ac) CN;x A; Woods(A Soils) 30 0.28 8 Woods(D Soils) 77 0.55 42 Lawns/Managed Open Space(A Soils) 39 0.23 9 Lawns/Managed Open Space(D Soils) 80 0.77 62 1.83 121 C'_ 7 (Ci x Ai) = 66 �A DA 1.2 (Analysis Point 3) Category *CN; A;(Ac) CN;x A; Woods(A Soils) 30 0 Lawns/Managed Open Space(A Soils) 39 4 0.12 5 Cc_ (CI x Ai) = 38 7 A; TIMMONS GROUP SCS Weighted Curve Numbers - Post-Development Category c ;x Ai Impervious 98 1.31 128 Lawns/Managed Open Space(A Soils) 39 0.28 11 Lawns/Managed Open Space(D Soils) 80 0.18 14 1.77 154 Cc_ (Ci x Aj) = IEI IA DA 2.1 (TO SCM 2) Category *CN; A;(Ac) CN;x A; Impervious 98 0.68 67 Lawns/Managed Open Space(A Soils) 39 0.14 5 Lawns/Managed Open Space(D Soils) 80 0.33 26 Woods(A Soils) 30 0.12 4 Woods(D Soils) 77 0.12 9 1.39 111 Cc_ (Ci x Aj) = 80 I A; DA 2.2 (Bypass to Analysis Point 1) Category *CN; A;(Ac) CN;x A; Impervious 98 0.02 2 Lawns/Managed Open Space(D Soils) 80 0.38 30 0.40 32 Cc_ (Ci x Aj) = 81 I A; DA 2.3 (Bypass to Analysis Point 2) Category *CN; A;(Ac) CN;x A; Lawns/Managed Open Space(D Soils) 80 0.10 8 Woods(D Soils) 77 0.01 1 0.11 9 C,_ I (Ci x Aj) = 80 I A; DA 2.4 (Bypass to Analysis Point 3) Category *CN; A;(Ac) CN;x A; Lawns/Managed Open Space(D Soils) 80 0.12 10 0.12 10 Cc_ (Ci x Aj) = 80 I A; 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 CD NX b 6 4 19p 4 13 Legend Hyd. Origin Description 1 SCS Runoff DA1.0(AnalysisPoint1) 2 SCS Runoff DA1.1(Analysis Poi nt2) 3 SCS Runoff DA1.2(AnalysisPoint3) 4 SCS Runoff DA(ToSCM1) 5 SCS Runoff DA2.1(ToSCM2) 16 6 SCS Runoff DA2.2(Bypass to Analysis Pt 1) 7 SCS Runoff DA2.3(Bypass to Analysis Pt 2) 8 SCS Runoff DA2.4(To Analysis Pt 3) 17 9 Combine Pre-Development Total 11 Reservoir Wet Pond#1 12 Reservoir Wet Pond#2 13 Combine Post Analysis Pt 1 14 Combine Post Analysis Pt 2 16 Combine Total Post(Detained) 17 Combine Post-Development(Undetained) Project: 37630.123-2023-08-04_SCM.gpw Wednesday, 02/21 /2024 Hydraflow Table of Contents 37630.123-2023-08-04_SCM.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, DA1.0(AnalysisPoint1).......................................................... 4 TR-55 Tc Worksheet........................................................................................................... 5 Hydrograph No. 2, SCS Runoff, DA1.1(AnalysisPoint2).......................................................... 6 TR-55 Tc Worksheet........................................................................................................... 7 Hydrograph No. 3, SCS Runoff, DA1.2(AnalysisPoint3).......................................................... 8 TR-55 Tc Worksheet........................................................................................................... 9 Hydrograph No. 4, SCS Runoff, DA(ToSCM1�...................................................................... 10 Hydrograph No. 5, SCS Runoff, DA2.1(ToSCM2�................................................................. 11 Hydrograph No. 6, SCS Runoff, DA2.2(Bypass to Analysis Pt 1).......................................... 12 Hydrograph No. 7, SCS Runoff, DA2.3(Bypass to Analysis Pt 2).......................................... 13 Hydrograph No. 8, SCS Runoff, DA2.4(To Analysis Pt 3)..................................................... 14 Hydrograph No. 9, Combine, Pre-Development Total............................................................ 15 Hydrograph No. 11, Reservoir, Wet Pond #1......................................................................... 16 PondReport -Wet Pond #1............................................................................................... 17 Hydrograph No. 12, Reservoir, Wet Pond #2......................................................................... 18 PondReport -Wet Pond #2............................................................................................... 19 Hydrograph No. 13, Combine, Post Analysis Pt 1.................................................................. 20 Hydrograph No. 14, Combine, Post Analysis Pt 2.................................................................. 21 Hydrograph No. 16, Combine, Total Post (Detained�............................................................ 22 Hydrograph No. 17, Combine, Post-Development (Undetained)........................................... 23 2 - Year SummaryReport....................................................................................................................... 24 HydrographReports................................................................................................................. 25 Hydrograph No. 1, SCS Runoff, DA1.0(AnalysisPoint1)........................................................ 25 Hydrograph No. 2, SCS Runoff, DA1.1(AnalysisPoint2)........................................................ 26 Hydrograph No. 3, SCS Runoff, DA1.2(AnalysisPoint3)........................................................ 27 Hydrograph No. 4, SCS Runoff, DA(ToSCM1�...................................................................... 28 Hydrograph No. 5, SCS Runoff, DA2.1(ToSCM2�................................................................. 29 Hydrograph No. 6, SCS Runoff, DA2.2(Bypass to Analysis Pt 1).......................................... 30 Hydrograph No. 7, SCS Runoff, DA2.3(Bypass to Analysis Pt 2).......................................... 31 Hydrograph No. 8, SCS Runoff, DA2.4(To Analysis Pt 3)..................................................... 32 Hydrograph No. 9, Combine, Pre-Development Total............................................................ 33 Hydrograph No. 11, Reservoir, Wet Pond #1......................................................................... 34 Hydrograph No. 12, Reservoir, Wet Pond #2......................................................................... 35 Hydrograph No. 13, Combine, Post Analysis Pt 1.................................................................. 36 Hydrograph No. 14, Combine, Post Analysis Pt 2.................................................................. 37 Hydrograph No. 16, Combine, Total Post (Detained�............................................................ 38 Hydrograph No. 17, Combine, Post-Development (Undetained)........................................... 39 10 - Year Contents Continued... 37630.123-2023-08-04_SCM.gpw SummaryReport....................................................................................................................... 40 HydrographReports................................................................................................................. 41 Hydrograph No. 1, SCS Runoff, DA1.0(AnalysisPoint1)........................................................ 41 Hydrograph No. 2, SCS Runoff, DA1.1(AnalysisPoint2)........................................................ 42 Hydrograph No. 3, SCS Runoff, DA1.2(AnalysisPoint3)........................................................ 43 Hydrograph No. 4, SCS Runoff, DA(ToSCM1�...................................................................... 44 Hydrograph No. 5, SCS Runoff, DA2.1(ToSCM2�................................................................. 45 Hydrograph No. 6, SCS Runoff, DA2.2(Bypass to Analysis Pt 1).......................................... 46 Hydrograph No. 7, SCS Runoff, DA2.3(Bypass to Analysis Pt 2).......................................... 47 Hydrograph No. 8, SCS Runoff, DA2.4(To Analysis Pt 3)..................................................... 48 Hydrograph No. 9, Combine, Pre-Development Total............................................................ 49 Hydrograph No. 11, Reservoir, Wet Pond #1......................................................................... 50 Hydrograph No. 12, Reservoir, Wet Pond #2......................................................................... 51 Hydrograph No. 13, Combine, Post Analysis Pt 1.................................................................. 52 Hydrograph No. 14, Combine, Post Analysis Pt 2.................................................................. 53 Hydrograph No. 16, Combine, Total Post (Detained�............................................................ 54 Hydrograph No. 17, Combine, Post-Development (Undetained)........................................... 55 25 - Year SummaryReport....................................................................................................................... 56 HydrographReports................................................................................................................. 57 Hydrograph No. 1, SCS Runoff, DA1.0(AnalysisPoint1)........................................................ 57 Hydrograph No. 2, SCS Runoff, DA1.1(AnalysisPoint2)........................................................ 58 Hydrograph No. 3, SCS Runoff, DA1.2(AnalysisPoint3)........................................................ 59 Hydrograph No. 4, SCS Runoff, DA(ToSCM1�...................................................................... 60 Hydrograph No. 5, SCS Runoff, DA2.1(ToSCM2�................................................................. 61 Hydrograph No. 6, SCS Runoff, DA2.2(Bypass to Analysis Pt 1).......................................... 62 Hydrograph No. 7, SCS Runoff, DA2.3(Bypass to Analysis Pt 2).......................................... 63 Hydrograph No. 8, SCS Runoff, DA2.4(To Analysis Pt 3)..................................................... 64 Hydrograph No. 9, Combine, Pre-Development Total............................................................ 65 Hydrograph No. 11, Reservoir, Wet Pond #1......................................................................... 66 Hydrograph No. 12, Reservoir, Wet Pond #2......................................................................... 67 Hydrograph No. 13, Combine, Post Analysis Pt 1.................................................................. 68 Hydrograph No. 14, Combine, Post Analysis Pt 2.................................................................. 69 Hydrograph No. 16, Combine, Total Post (Detained�............................................................ 70 Hydrograph No. 17, Combine, Post-Development (Undetained)........................................... 71 100 - Year SummaryReport....................................................................................................................... 72 HydrographReports................................................................................................................. 73 Hydrograph No. 1, SCS Runoff, DA1.0(AnalysisPoint1)........................................................ 73 Hydrograph No. 2, SCS Runoff, DA1.1(AnalysisPoint2)........................................................ 74 Hydrograph No. 3, SCS Runoff, DA1.2(AnalysisPoint3)........................................................ 75 Hydrograph No. 4, SCS Runoff, DA(ToSCM1�...................................................................... 76 Hydrograph No. 5, SCS Runoff, DA2.1(ToSCM2�................................................................. 77 Hydrograph No. 6, SCS Runoff, DA2.2(Bypass to Analysis Pt 1).......................................... 78 Hydrograph No. 7, SCS Runoff, DA2.3(Bypass to Analysis Pt 2).......................................... 79 Hydrograph No. 8, SCS Runoff, DA2.4(To Analysis Pt 3)..................................................... 80 Hydrograph No. 9, Combine, Pre-Development Total............................................................ 81 Hydrograph No. 11, Reservoir, Wet Pond #1......................................................................... 82 Contents continued... 37630.123-2023-08-04_SCM.gpw Hydrograph No. 12, Reservoir, Wet Pond #2......................................................................... 83 Hydrograph No. 13, Combine, Post Analysis Pt 1.................................................................. 84 Hydrograph No. 14, Combine, Post Analysis Pt 2.................................................................. 85 Hydrograph No. 16, Combine, Total Post (Detained�............................................................ 86 Hydrograph No. 17, Combine, Post-Development (Undetained)........................................... 87 OFReport.................................................................................................................. 88 2 Hydrograph Return Period Recce draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 1.962 3.073 ------- ------- 6.788 9.373 ------- 13.98 DA1.0(AnalysisPoint1) 2 SCS Runoff ------ 1.273 2.236 ------- ------- 5.595 7.986 ------- 12.41 DA1.1(AnalysisPoint2) 3 SCS Runoff ------ 0.000 0.000 ------- ------- 0.011 0.064 ------- 0.222 DA1.2(AnalysisPoint3) 4 SCS Runoff ------ 5.300 6.948 ------- ------- 11.78 14.80 ------- 19.95 DA(ToSCM1) 5 SCS Runoff ------ 3.055 4.228 ------- ------- 7.917 10.30 ------- 14.39 DA2.1(ToSCM2) 6 SCS Runoff ------ 0.921 1.267 ------- ------- 2.336 3.022 ------- 4.200 DA2.2(Bypass to Analysis Pt 1) 7 SCS Runoff ------ 0.242 0.335 ------- ------- 0.627 0.815 ------- 1.139 DA2.3(Bypass to Analysis Pt 2) 8 SCS Runoff ------ 0.264 0.365 ------- ------- 0.683 0.889 ------- 1.242 DA2.4(To Analysis Pt 3) 9 Combine 1,2,3, 3.235 5.309 ------- ------- 12.37 17.42 ------- 26.62 Pre-Development Total 11 Reservoir 4 0.631 3.083 ------- ------- 9.109 13.45 ------- 18.99 Wet Pond#1 12 Reservoir 5 0.080 0.205 ------- ------- 0.503 5.888 ------- 13.81 Wet Pond#2 13 Combine 6, 11, 0.950 3.727 ------- ------- 10.92 16.39 ------- 23.06 Post Analysis Pt 1 14 Combine 7, 12, 0.253 0.348 ------- ------- 0.980 6.284 ------- 14.91 Post Analysis Pt 2 16 Combine 8, 13, 14, 1.466 4.157 ------- ------- 12.53 21.12 ------- 39.17 Total Post(Detained) 17 Combine 4,5,6, 9.744 13.14 ------- ------- 23.34 29.83 ------- 40.92 Post-Development(Undetained) 7,8, Proj. file: 37630.123-2023-08-04_SCM.gpw Wednesday, 02/21 /2024 3 Hydrograph Summary Report Hydraf low Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.962 2 722 5,447 ------ ------ ------ DA1.0(AnalysisPoint1) 2 SCS Runoff 1.273 2 722 3,930 ------ ------ ------ DA1.1(AnalysisPoint2) 3 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ DA1.2(AnalysisPoint3) 4 SCS Runoff 5.300 2 716 10,792 ------ ------ ------ DA(ToSCM1) 5 SCS Runoff 3.055 2 718 6,127 ------ ------ ------ DA2.1(ToSCM2) 6 SCS Runoff 0.921 2 718 1,851 ------ ------ ------ DA2.2(Bypass to Analysis Pt 1) 7 SCS Runoff 0.242 2 718 485 ------ ------ ------ DA2.3(Bypass to Analysis Pt 2) 8 SCS Runoff 0.264 2 718 529 ------ ------ ------ DA2.4(To Analysis Pt 3) 9 Combine 3.235 2 722 9,377 1,2,3, ------ ------ Pre-Development Total 11 Reservoir 0.631 2 736 10,473 4 190.63 5,609 Wet Pond#1 12 Reservoir 0.080 2 922 5,295 5 190.17 4,049 Wet Pond#2 13 Combine 0.950 2 718 12,324 6, 11, ------ ------ Post Analysis Pt 1 14 Combine 0.253 2 718 5,779 7, 12, ------ ------ Post Analysis Pt 2 16 Combine 1.466 2 718 18,632 8, 13, 14, ------ ------ Total Post(Detained) 17 Combine 9.744 2 716 19,783 4, 5,6, ------ ------ Post-Development(Undetained) 7,8, 37630.123-2023-08-04_SCM.gpw Return Period: 1 Year Wednesday, 02/21 /2024 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 1 DA1.0(AnalysisPoint1) Hydrograph type = SCS Runoff Peak discharge = 1.962 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 5,447 cuft Drainage area = 1.830 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.30 min Total precip. = 3.06 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.0(AnalysisPoint1) Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 5 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. No. 1 DA1.0(AnalysisPoint1) Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.150 0.150 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.71 0.00 0.00 Land slope (%) = 0.80 0.00 0.00 Travel Time (min) = 7.54 + 0.00 + 0.00 = 7.54 Shallow Concentrated Flow Flow length (ft) = 448.00 0.00 0.00 Watercourse slope (%) = 1.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.98 0.00 0.00 Travel Time (min) = 3.78 + 0.00 + 0.00 = 3.78 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 11.30 min 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 2 DA1.1(AnalysisPoint2) Hydrograph type = SCS Runoff Peak discharge = 1.273 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 3,930 cuft Drainage area = 1.830 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.70 min Total precip. = 3.06 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.1(AnalysisPoint2) Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 7 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. No. 2 DA1.1(Analysis Poi nt2) Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.71 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 9.10 + 0.00 + 0.00 = 9.10 Shallow Concentrated Flow Flow length (ft) = 390.00 0.00 0.00 Watercourse slope (%) = 2.43 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =2.52 0.00 0.00 Travel Time (min) = 2.58 + 0.00 + 0.00 = 2.58 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 11.70 min 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 3 DA1.2(AnalysisPoint3) Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 0.120 ac Curve number = 38 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.00 min Total precip. = 3.06 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.2(AnalysisPoint3) Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 1 1 .01 0.00 0.00 0 20 40 60 80 100 120 Hyd No. 3 Time (min) 9 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. No. 3 DA1.2(AnalysisPoint3) Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 51.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.71 0.00 0.00 Land slope (%) = 1.00 0.00 0.00 Travel Time (min) = 7.01 + 0.00 + 0.00 = 7.01 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter(ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 7.00 min 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 4 DA(ToSCM1) Hydrograph type = SCS Runoff Peak discharge = 5.300 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 10,792 cuft Drainage area = 1.770 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.06 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA(ToSCM1) Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 4 Time(min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 5 DA2.1(ToSCM2) Hydrograph type = SCS Runoff Peak discharge = 3.055 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 6,127 cuft Drainage area = 1.390 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.06 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1(ToSCM2) Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 5 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 6 DA2.2(Bypass to Analysis Pt 1) Hydrograph type = SCS Runoff Peak discharge = 0.921 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 1,851 cuft Drainage area = 0.400 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.06 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2(Bypass to Analysis Pt 1) Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 7 DA2.3(Bypass to Analysis Pt 2) Hydrograph type = SCS Runoff Peak discharge = 0.242 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 485 cuft Drainage area = 0.110 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.06 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.3(Bypass to Analysis Pt 2) Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 8 DA2.4(To Analysis Pt 3) Hydrograph type = SCS Runoff Peak discharge = 0.264 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 529 cuft Drainage area = 0.120 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.06 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.4(To Analysis Pt 3) Q (cfs) Hyd. No. 8 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 8 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 9 Pre-Development Total Hydrograph type = Combine Peak discharge = 3.235 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 9,377 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 3.780 ac Pre-Development Total Q (cfs) Hyd. No. 9 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 — Hyd No. 1 Hyd No. 2 Hyd No. 3 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 11 Wet Pond #1 Hydrograph type = Reservoir Peak discharge = 0.631 cfs Storm frequency = 1 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 10,473 cuft Inflow hyd. No. = 4 - DA(ToSCM1) Max. Elevation = 190.63 ft Reservoir name = Wet Pond #1 Max. Storage = 5,609 cuft Storage Indication method used. Wet Pond #1 Q (cfs) Hyd. No. 11 -- 1 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 11 Hyd No. 4 I_I_I_I_I_I_1 Total storage used = 5,609 cuft Pond Report 17 Hydraf low Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Pond No. 1 - Wet Pond #1 Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation= 189.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cuft) Total storage(cuft) 0.00 189.00 3,443 0 0 1.00 190.00 3,443 3,443 3,443 2.00 191.00 3,443 3,443 6,886 3.00 192.00 3,443 3,443 10,329 4.00 193.00 3,443 3,443 13,772 4.50 193.50 3,443 1,722 15,494 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 1.00 4.00 0.00 Crest Len(ft) = 14.00 20.00 2.00 0.00 Span(in) = 24.00 1.00 20.00 0.00 Crest El.(ft) = 191.50 192.00 190.50 0.00 No.Barrels = 1 1 1 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 188.40 189.00 190.50 0.00 Weir Type = 1 Broad Rect --- Length(ft) = 32.00 0.50 0.50 0.00 Multi-Stage = Yes No Yes No Slope(%) = 0.95 1.00 1.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 194.00 4.00 193.00 3.00 192.00 2.00 191.00 1.00 190.00 0.00 189.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 Total Q Discharge(cfs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 12 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 0.080 cfs Storm frequency = 1 yrs Time to peak = 922 min Time interval = 2 min Hyd. volume = 5,295 cuft Inflow hyd. No. = 5 - DA2.1(ToSCM2) Max. Elevation = 190.17 ft Reservoir name = Wet Pond #2 Max. Storage = 4,049 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 12 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 12 Hyd No. 5 III Total storage used =4,049 cuft Pond Report 19 Hydraf low Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Pond No. 2 - Wet Pond #2 Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation= 189.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(tuft) Total storage(cuft) 0.00 189.00 3,327 0 0 1.00 190.00 3,549 3,438 3,438 2.00 191.00 3,769 3,659 7,097 3.00 192.00 3,988 3,879 10,976 4.00 193.00 4,207 4,098 15,073 5.00 194.00 4,316 4,262 19,335 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 24.00 0.75 4.00 0.00 Crest Len(ft) = 16.00 20.00 0.00 0.00 Span(in) = 24.00 0.75 4.00 0.00 Crest El.(ft) = 191.50 192.00 0.00 0.00 No.Barrels = 1 1 1 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 187.25 189.00 190.00 0.00 Weir Type = 1 Broad --- --- Length(ft) = 58.00 0.50 0.50 0.00 Multi-Stage = Yes No No No Slope(%) = 0.86 1.00 1.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a Yes Yes No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 194.00 4.00 193.00 3.00 192.00 2.00 191.00 1.00 190.00 0.00 189.00 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 200.0 Total Q Discharge(cfs) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 13 Post Analysis Pt 1 Hydrograph type = Combine Peak discharge = 0.950 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 12,324 cuft Inflow hyds. = 6, 11 Contrib. drain. area = 0.400 ac Post Analysis Pt 1 Q (cfs) Hyd. No. 13 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 13 Hyd No. 6 Hyd No. 11 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 14 Post Analysis Pt 2 Hydrograph type = Combine Peak discharge = 0.253 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 5,779 cuft Inflow hyds. = 7, 12 Contrib. drain. area = 0.110 ac Post Analysis Pt 2 Q (cfs) Hyd. No. 14 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 14 Hyd No. 7 Hyd No. 12 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 16 Total Post (Detained) Hydrograph type = Combine Peak discharge = 1.466 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 18,632 cuft Inflow hyds. = 8, 13, 14 Contrib. drain. area = 0.120 ac Total Post (Detained) Q (cfs) Hyd. No. 16 -- 1 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 5760 Time (min) Hyd No. 16 Hyd No. 8 Hyd No. 13 Hyd No. 14 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 17 Post-Development (Undetained) Hydrograph type = Combine Peak discharge = 9.744 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 19,783 cuft Inflow hyds. = 4, 5, 6, 7, 8 Contrib. drain. area = 3.790 ac Post-Development (Undetained) Q (cfs) Hyd. No. 17 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 17 Hyd No. 4 Hyd No. 5 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 8 24 Hydrograph Summary Report Hydraf low Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 3.073 2 722 8,218 ------ ------ ------ DA1.0(AnalysisPoint1) 2 SCS Runoff 2.236 2 722 6,281 ------ ------ ------ DA1.1(AnalysisPoint2) 3 SCS Runoff 0.000 2 1440 5 ------ ------ ------ DA1.2(AnalysisPoint3) 4 SCS Runoff 6.948 2 716 14,288 ------ ------ ------ DA(ToSCM1) 5 SCS Runoff 4.228 2 716 8,536 ------ ------ ------ DA2.1(ToSCM2) 6 SCS Runoff 1.267 2 716 2,559 ------ ------ ------ DA2.2(Bypass to Analysis Pt 1) 7 SCS Runoff 0.335 2 716 676 ------ ------ ------ DA2.3(Bypass to Analysis Pt 2) 8 SCS Runoff 0.365 2 716 737 ------ ------ ------ DA2.4(To Analysis Pt 3) 9 Combine 5.309 2 722 14,504 1,2,3, ------ ------ Pre-Development Total 11 Reservoir 3.083 2 722 13,968 4 190.91 6,568 Wet Pond#1 12 Reservoir 0.205 2 792 7,693 5 190.37 4,784 Wet Pond#2 13 Combine 3.727 2 722 16,527 6, 11, ------ ------ Post Analysis Pt 1 14 Combine 0.348 2 718 8,368 7, 12, ------ ------ Post Analysis Pt 2 16 Combine 4.157 2 720 25,633 8, 13, 14, ------ ------ Total Post(Detained) 17 Combine 13.14 2 716 26,796 4, 5,6, ------ ------ Post-Development(Undetained) 7,8, 37630.123-2023-08-04_SCM.gpw Return Period: 2 Year Wednesday, 02/21 /2024 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 1 DA1.0(AnalysisPoint1) Hydrograph type = SCS Runoff Peak discharge = 3.073 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 8,218 cuft Drainage area = 1.830 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.30 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.0(AnalysisPoint1) Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 2 DA1.1(AnalysisPoint2) Hydrograph type = SCS Runoff Peak discharge = 2.236 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 6,281 cuft Drainage area = 1.830 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.70 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.1(AnalysisPoint2) Q (cfs) Hyd. No. 2 --2 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 3 DA1.2(AnalysisPoint3) Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 1440 min Time interval = 2 min Hyd. volume = 5 cuft Drainage area = 0.120 ac Curve number = 38 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.2(AnalysisPoint3) Q (cfs) Hyd. No. 3 --2 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 4 DA(ToSCM1) Hydrograph type = SCS Runoff Peak discharge = 6.948 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 14,288 cuft Drainage area = 1.770 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA(ToSCM1) Q (cfs) Hyd. No. 4 --2 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 4 Time (min) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 5 DA2.1(ToSCM2) Hydrograph type = SCS Runoff Peak discharge = 4.228 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 8,536 cuft Drainage area = 1.390 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1(ToSCM2) Q (cfs) Hyd. No. 5 --2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 6 DA2.2(Bypass to Analysis Pt 1) Hydrograph type = SCS Runoff Peak discharge = 1.267 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 2,559 cuft Drainage area = 0.400 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2(Bypass to Analysis Pt 1) Q (cfs) Hyd. No. 6 --2 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 7 DA2.3(Bypass to Analysis Pt 2) Hydrograph type = SCS Runoff Peak discharge = 0.335 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 676 cuft Drainage area = 0.110 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.3(Bypass to Analysis Pt 2) Q (cfs) Hyd. No. 7 --2 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 8 DA2.4(To Analysis Pt 3) Hydrograph type = SCS Runoff Peak discharge = 0.365 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 737 cuft Drainage area = 0.120 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.71 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.4(To Analysis Pt 3) Q (cfs) Hyd. No. 8 --2 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 8 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 9 Pre-Development Total Hydrograph type = Combine Peak discharge = 5.309 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 14,504 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 3.780 ac Pre-Development Total Q (cfs) Hyd. No. 9 --2 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 1 Hyd No. 2 Hyd No. 3 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 11 Wet Pond #1 Hydrograph type = Reservoir Peak discharge = 3.083 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 13,968 cuft Inflow hyd. No. = 4 - DA(ToSCM1) Max. Elevation = 190.91 ft Reservoir name = Wet Pond #1 Max. Storage = 6,568 cuft Storage Indication method used. Wet Pond #1 Q (cfs) Hyd. No. 11 --2 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 Time (min) Hyd No. 11 Hyd No. 4 �I Total storage used = 6,568 cuft 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 12 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 0.205 cfs Storm frequency = 2 yrs Time to peak = 792 min Time interval = 2 min Hyd. volume = 7,693 cuft Inflow hyd. No. = 5 - DA2.1(ToSCM2) Max. Elevation = 190.37 ft Reservoir name = Wet Pond #2 Max. Storage = 4,784 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 12 --2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 12 Hyd No. 5 A I I I I I II Total storage used =4,784 cuft 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 13 Post Analysis Pt 1 Hydrograph type = Combine Peak discharge = 3.727 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 16,527 cuft Inflow hyds. = 6, 11 Contrib. drain. area = 0.400 ac Post Analysis Pt 1 Q (cfs) Hyd. No. 13 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 6 Hyd No. 11 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 14 Post Analysis Pt 2 Hydrograph type = Combine Peak discharge = 0.348 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 8,368 cuft Inflow hyds. = 7, 12 Contrib. drain. area = 0.110 ac Post Analysis Pt 2 Q (cfs) Hyd. No. 14 --2 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 14 Hyd No. 7 Hyd No. 12 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 16 Total Post (Detained) Hydrograph type = Combine Peak discharge = 4.157 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 25,633 cuft Inflow hyds. = 8, 13, 14 Contrib. drain. area = 0.120 ac Total Post (Detained) Q (cfs) Hyd. No. 16 --2 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 Time (min) Hyd No. 16 Hyd No. 8 Hyd No. 13 Hyd No. 14 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 17 Post-Development (Undetained) Hydrograph type = Combine Peak discharge = 13.14 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 26,796 cuft Inflow hyds. = 4, 5, 6, 7, 8 Contrib. drain. area = 3.790 ac Post-Development (Undetained) Q (cfs) Hyd. No. 17 --2 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 17 Hyd No. 4 Hyd No. 5 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 8 40 Hydrograph Summary Report Hydraf low Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 6.788 2 720 17,674 ------ ------ ------ DA1.0(AnalysisPoint1) 2 SCS Runoff 5.595 2 722 14,716 ------ ------ ------ DA1.1(AnalysisPoint2) 3 SCS Runoff 0.011 2 724 127 ------ ------ ------ DA1.2(AnalysisPoint3) 4 SCS Runoff 11.78 2 716 24,910 ------ ------ ------ DA(ToSCM1) 5 SCS Runoff 7.917 2 716 16,189 ------ ------ ------ DA2.1(ToSCM2) 6 SCS Runoff 2.336 2 716 4,793 ------ ------ ------ DA2.2(Bypass to Analysis Pt 1) 7 SCS Runoff 0.627 2 716 1,281 ------ ------ ------ DA2.3(Bypass to Analysis Pt 2) 8 SCS Runoff 0.683 2 716 1,398 ------ ------ ------ DA2.4(To Analysis Pt 3) 9 Combine 12.37 2 722 32,517 1,2,3, ------ ------ Pre-Development Total 11 Reservoir 9.109 2 720 24,588 4 191.50 8,600 Wet Pond#1 12 Reservoir 0.503 2 760 15,323 5 191.47 8,937 Wet Pond#2 13 Combine 10.92 2 720 29,381 6, 11, ------ ------ Post Analysis Pt 1 14 Combine 0.980 2 718 16,604 7, 12, ------ ------ Post Analysis Pt 2 16 Combine 12.53 2 718 47,383 8, 13, 14, ------ ------ Total Post(Detained) 17 Combine 23.34 2 716 48,571 4, 5,6, ------ ------ Post-Development(Undetained) 7,8, 37630.123-2023-08-04_SCM.gpw Return Period: 10 Year Wednesday, 02/21 /2024 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 1 DA1.0(AnalysisPoint1) Hydrograph type = SCS Runoff Peak discharge = 6.788 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 17,674 cuft Drainage area = 1.830 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.30 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.0(AnalysisPoint1) Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 2 DA1.1(AnalysisPoint2) Hydrograph type = SCS Runoff Peak discharge = 5.595 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 14,716 cuft Drainage area = 1.830 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.70 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.1(AnalysisPoint2) Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 3 DA1.2(AnalysisPoint3) Hydrograph type = SCS Runoff Peak discharge = 0.011 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 127 cuft Drainage area = 0.120 ac Curve number = 38 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.2(Ana1ysisPoint3) Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 4 DA(ToSCM1) Hydrograph type = SCS Runoff Peak discharge = 11.78 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 24,910 cuft Drainage area = 1.770 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA(ToSCM1) Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 4 Time (min) 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 5 DA2.1(ToSCM2) Hydrograph type = SCS Runoff Peak discharge = 7.917 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 16,189 cuft Drainage area = 1.390 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1(ToSCM2) Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 5 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 6 DA2.2(Bypass to Analysis Pt 1) Hydrograph type = SCS Runoff Peak discharge = 2.336 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 4,793 cuft Drainage area = 0.400 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2(Bypass to Analysis Pt 1) Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) 47 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 7 DA2.3(Bypass to Analysis Pt 2) Hydrograph type = SCS Runoff Peak discharge = 0.627 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,281 cuft Drainage area = 0.110 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.3(Bypass to Analysis Pt 2) Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 7 Time (min) 48 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 8 DA2.4(To Analysis Pt 3) Hydrograph type = SCS Runoff Peak discharge = 0.683 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,398 cuft Drainage area = 0.120 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.4(To Analysis Pt 3) Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 Time (min) 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 9 Pre-Development Total Hydrograph type = Combine Peak discharge = 12.37 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 32,517 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 3.780 ac Pre-Development Total Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 1 Hyd No. 2 Hyd No. 3 50 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 11 Wet Pond #1 Hydrograph type = Reservoir Peak discharge = 9.109 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 24,588 cuft Inflow hyd. No. = 4 - DA(ToSCM1) Max. Elevation = 191.50 ft Reservoir name = Wet Pond #1 Max. Storage = 8,600 cuft Storage Indication method used. Wet Pond #1 Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 11 Hyd No. 4 I_I_I_I_I_I_1 Total storage used = 8,600 cuft 51 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 12 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 0.503 cfs Storm frequency = 10 yrs Time to peak = 760 min Time interval = 2 min Hyd. volume = 15,323 cuft Inflow hyd. No. = 5 - DA2.1(ToSCM2) Max. Elevation = 191.47 ft Reservoir name = Wet Pond #2 Max. Storage = 8,937 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 12-- 10 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 L 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 12 Hyd No. 5 A I I I I I II Total storage used = 8,937 cuft 52 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 13 Post Analysis Pt 1 Hydrograph type = Combine Peak discharge = 10.92 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 29,381 cuft Inflow hyds. = 6, 11 Contrib. drain. area = 0.400 ac Post Analysis Pt 1 Q (cfs) Hyd. No. 13-- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hyd No. 6 Hyd No. 11 53 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 14 Post Analysis Pt 2 Hydrograph type = Combine Peak discharge = 0.980 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 16,604 cuft Inflow hyds. = 7, 12 Contrib. drain. area = 0.110 ac Post Analysis Pt 2 Q (cfs) Hyd. No. 14-- 10 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 IL 0.10 j 0.10 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 Time (min) Hyd No. 14 Hyd No. 7 Hyd No. 12 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 16 Total Post (Detained) Hydrograph type = Combine Peak discharge = 12.53 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 47,383 cuft Inflow hyds. = 8, 13, 14 Contrib. drain. area = 0.120 ac Total Post (Detained) Q (cfs) Hyd. No. 16-- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 16 Hyd No. 8 Hyd No. 13 Hyd No. 14 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 17 Post-Development (Undetained) Hydrograph type = Combine Peak discharge = 23.34 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 48,571 cuft Inflow hyds. = 4, 5, 6, 7, 8 Contrib. drain. area = 3.790 ac Post-Development (Undetained) Q (cfs) Hyd. No. 17-- 10 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 17 Hyd No. 4 Hyd No. 5 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 8 56 Hydrograph Summary Report Hydraf low Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 9.373 2 720 24,301 ------ ------ ------ DA1.0(AnalysisPoint1) 2 SCS Runoff 7.986 2 720 20,828 ------ ------ ------ DA1.1(AnalysisPoint2) 3 SCS Runoff 0.064 2 722 273 ------ ------ ------ DA1.2(AnalysisPoint3) 4 SCS Runoff 14.80 2 716 31,783 ------ ------ ------ DA(ToSCM1) 5 SCS Runoff 10.30 2 716 21,291 ------ ------ ------ DA2.1(ToSCM2) 6 SCS Runoff 3.022 2 716 6,275 ------ ------ ------ DA2.2(Bypass to Analysis Pt 1) 7 SCS Runoff 0.815 2 716 1,685 ------ ------ ------ DA2.3(Bypass to Analysis Pt 2) 8 SCS Runoff 0.889 2 716 1,838 ------ ------ ------ DA2.4(To Analysis Pt 3) 9 Combine 17.42 2 720 45,402 1,2,3, ------ ------ Pre-Development Total 11 Reservoir 13.45 2 718 31,460 4 191.65 9,124 Wet Pond#1 12 Reservoir 5.888 2 722 20,416 5 191.71 9,868 Wet Pond#2 13 Combine 16.39 2 718 37,735 6, 11, ------ ------ Post Analysis Pt 1 14 Combine 6.284 2 722 22,101 7, 12, ------ ------ Post Analysis Pt 2 16 Combine 21.12 2 720 61,674 8, 13, 14, ------ ------ Total Post(Detained) 17 Combine 29.83 2 716 62,873 4, 5,6, ------ ------ Post-Development(Undetained) 7,8, 37630.123-2023-08-04_SCM.gpw Return Period: 25 Year Wednesday, 02/21 /2024 57 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 1 DA1.0(AnalysisPoint1) Hydrograph type = SCS Runoff Peak discharge = 9.373 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 24,301 cuft Drainage area = 1.830 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.30 min Total precip. = 6.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.0(AnalysisPoint1) Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 58 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 2 DA1.1(AnalysisPoint2) Hydrograph type = SCS Runoff Peak discharge = 7.986 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 20,828 cuft Drainage area = 1.830 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.70 min Total precip. = 6.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.1(AnalysisPoint2) Q (cfs) Hyd. No. 2 --25 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 3 DA1.2(AnalysisPoint3) Hydrograph type = SCS Runoff Peak discharge = 0.064 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 273 cuft Drainage area = 0.120 ac Curve number = 38 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.00 min Total precip. = 6.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.2(AnalysisPoint3) Q (cfs) Hyd. No. 3 --25 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 60 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 4 DA(ToSCM1) Hydrograph type = SCS Runoff Peak discharge = 14.80 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 31,783 cuft Drainage area = 1.770 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA(ToSCM1) Q (cfs) Hyd. No. 4 --25 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 4 Time (min) 61 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 5 DA2.1(ToSCM2) Hydrograph type = SCS Runoff Peak discharge = 10.30 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 21,291 cuft Drainage area = 1.390 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1(ToSCM2) Q (cfs) Hyd. No. 5 --25 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 5 Time (min) 62 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 6 DA2.2(Bypass to Analysis Pt 1) Hydrograph type = SCS Runoff Peak discharge = 3.022 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 6,275 cuft Drainage area = 0.400 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2(Bypass to Analysis Pt 1) Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) 63 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 7 DA2.3(Bypass to Analysis Pt 2) Hydrograph type = SCS Runoff Peak discharge = 0.815 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,685 cuft Drainage area = 0.110 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.3(Bypass to Analysis Pt 2) Q (cfs) Hyd. No. 7 --25 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 7 Time (min) 64 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 8 DA2.4(To Analysis Pt 3) Hydrograph type = SCS Runoff Peak discharge = 0.889 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,838 cuft Drainage area = 0.120 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.79 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.4(To Analysis Pt 3) Q (cfs) Hyd. No. 8 --25 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 Time (min) 65 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 9 Pre-Development Total Hydrograph type = Combine Peak discharge = 17.42 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 45,402 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 3.780 ac Pre-Development Total Q (cfs) Hyd. No. 9 --25 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 1 Hyd No. 2 Hyd No. 3 66 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 11 Wet Pond #1 Hydrograph type = Reservoir Peak discharge = 13.45 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 31,460 cuft Inflow hyd. No. = 4 - DA(ToSCM1) Max. Elevation = 191.65 ft Reservoir name = Wet Pond #1 Max. Storage = 9,124 cuft Storage Indication method used. Wet Pond #1 Q (cfs) Hyd. No. 11 --25 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 11 Hyd No. 4 I_I_I_I_I_I_1 Total storage used = 9,124 cuft 67 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 12 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 5.888 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 20,416 cuft Inflow hyd. No. = 5 - DA2.1(ToSCM2) Max. Elevation = 191.71 ft Reservoir name = Wet Pond #2 Max. Storage = 9,868 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 12--25 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hyd No. 5 A I I I I I II Total storage used = 9,868 cuft 68 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 13 Post Analysis Pt 1 Hydrograph type = Combine Peak discharge = 16.39 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 37,735 cuft Inflow hyds. = 6, 11 Contrib. drain. area = 0.400 ac Post Analysis Pt 1 Q (cfs) Hyd. No. 13--25 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 13 Hyd No. 6 Hyd No. 11 69 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 14 Post Analysis Pt 2 Hydrograph type = Combine Peak discharge = 6.284 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 22,101 cuft Inflow hyds. = 7, 12 Contrib. drain. area = 0.110 ac Post Analysis Pt 2 Q (cfs) Hyd. No. 14--25 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 7 Hyd No. 12 70 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 16 Total Post (Detained) Hydrograph type = Combine Peak discharge = 21.12 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 61,674 cuft Inflow hyds. = 8, 13, 14 Contrib. drain. area = 0.120 ac Total Post (Detained) Q (cfs) Hyd. No. 16--25 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 16 Hyd No. 8 Hyd No. 13 Hyd No. 14 71 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 17 Post-Development (Undetained) Hydrograph type = Combine Peak discharge = 29.83 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 62,873 cuft Inflow hyds. = 4, 5, 6, 7, 8 Contrib. drain. area = 3.790 ac Post-Development (Undetained) Q (cfs) Hyd. No. 17--25 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 17 Hyd No. 4 Hyd No. 5 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 8 72 Hydrograph Summary Report Hydraf low Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 13.98 2 720 36,360 ------ ------ ------ DA1.0(AnalysisPoint1) 2 SCS Runoff 12.41 2 720 32,179 ------ ------ ------ DA1.1(AnalysisPoint2) 3 SCS Runoff 0.222 2 720 617 ------ ------ ------ DA1.2(AnalysisPoint3) 4 SCS Runoff 19.95 2 716 43,729 ------ ------ ------ DA(ToSCM1) 5 SCS Runoff 14.39 2 716 30,308 ------ ------ ------ DA2.1(ToSCM2) 6 SCS Runoff 4.200 2 716 8,888 ------ ------ ------ DA2.2(Bypass to Analysis Pt 1) 7 SCS Runoff 1.139 2 716 2,398 ------ ------ ------ DA2.3(Bypass to Analysis Pt 2) 8 SCS Runoff 1.242 2 716 2,616 ------ ------ ------ DA2.4(To Analysis Pt 3) 9 Combine 26.62 2 720 69,155 1,2,3, ------ ------ Pre-Development Total 11 Reservoir 18.99 2 718 43,403 4 191.82 9,705 Wet Pond#1 12 Reservoir 13.81 2 718 29,420 5 191.89 10,567 Wet Pond#2 13 Combine 23.06 2 718 52,291 6, 11, ------ ------ Post Analysis Pt 1 14 Combine 14.91 2 718 31,819 7, 12, ------ ------ Post Analysis Pt 2 16 Combine 39.17 2 718 86,726 8, 13, 14, ------ ------ Total Post(Detained) 17 Combine 40.92 2 716 87,939 4, 5,6, ------ ------ Post-Development(Undetained) 7,8, 37630.123-2023-08-04_SCM.gpw Return Period: 100 Year Wednesday, 02/21 /2024 73 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 1 DA1.0(AnalysisPoint1) Hydrograph type = SCS Runoff Peak discharge = 13.98 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 36,360 cuft Drainage area = 1.830 ac Curve number = 71 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.30 min Total precip. = 8.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.0(AnalysisPoint1) Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 74 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 2 DA1.1(AnalysisPoint2) Hydrograph type = SCS Runoff Peak discharge = 12.41 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 32,179 cuft Drainage area = 1.830 ac Curve number = 66 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 11.70 min Total precip. = 8.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.1(AnalysisPoint2) Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 75 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 3 DA1.2(AnalysisPoint3) Hydrograph type = SCS Runoff Peak discharge = 0.222 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 617 cuft Drainage area = 0.120 ac Curve number = 38 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.00 min Total precip. = 8.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA1.2(Ana1ysisPoint3) Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 76 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 4 DA(ToSCM1) Hydrograph type = SCS Runoff Peak discharge = 19.95 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 43,729 cuft Drainage area = 1.770 ac Curve number = 87 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA(ToSCM1) Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 4 Time (min) 77 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 5 DA2.1(ToSCM2) Hydrograph type = SCS Runoff Peak discharge = 14.39 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 30,308 cuft Drainage area = 1.390 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.1(ToSCM2) Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 5 Time (min) 78 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 6 DA2.2(Bypass to Analysis Pt 1) Hydrograph type = SCS Runoff Peak discharge = 4.200 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 8,888 cuft Drainage area = 0.400 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.2(Bypass to Analysis Pt 1) Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 6 Time (min) 79 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 7 DA2.3(Bypass to Analysis Pt 2) Hydrograph type = SCS Runoff Peak discharge = 1.139 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 2,398 cuft Drainage area = 0.110 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.3(Bypass to Analysis Pt 2) Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 7 Time (min) 80 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 8 DA2.4(To Analysis Pt 3) Hydrograph type = SCS Runoff Peak discharge = 1.242 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 2,616 cuft Drainage area = 0.120 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.83 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA2.4(To Analysis Pt 3) Q (cfs) Hyd. No. 8-- 100 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 8 Time (min) 81 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 9 Pre-Development Total Hydrograph type = Combine Peak discharge = 26.62 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 69,155 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 3.780 ac Pre-Development Total Q (cfs) Hyd. No. 9-- 100 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 1 Hyd No. 2 Hyd No. 3 82 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 11 Wet Pond #1 Hydrograph type = Reservoir Peak discharge = 18.99 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 43,403 cuft Inflow hyd. No. = 4 - DA(ToSCM1) Max. Elevation = 191.82 ft Reservoir name = Wet Pond #1 Max. Storage = 9,705 cuft Storage Indication method used. Wet Pond #1 Q (cfs) Hyd. No. 11 -- 100 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 11 Hyd No. 4 I_I_I_I_I_I_1 Total storage used = 9,705 cuft 83 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 12 Wet Pond #2 Hydrograph type = Reservoir Peak discharge = 13.81 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 29,420 cuft Inflow hyd. No. = 5 - DA2.1(ToSCM2) Max. Elevation = 191.89 ft Reservoir name = Wet Pond #2 Max. Storage = 10,567 cuft Storage Indication method used. Wet Pond #2 Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hyd No. 5 A I I I I I II Total storage used = 10,567 cuft 84 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 13 Post Analysis Pt 1 Hydrograph type = Combine Peak discharge = 23.06 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 52,291 cuft Inflow hyds. = 6, 11 Contrib. drain. area = 0.400 ac Post Analysis Pt 1 Q (cfs) Hyd. No. 13 -- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 13 Hyd No. 6 Hyd No. 11 85 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 14 Post Analysis Pt 2 Hydrograph type = Combine Peak discharge = 14.91 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 31,819 cuft Inflow hyds. = 7, 12 Contrib. drain. area = 0.110 ac Post Analysis Pt 2 Q (cfs) Hyd. No. 14 -- 100 Year Q (cfs) 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 14 Hyd No. 7 Hyd No. 12 86 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 16 Total Post (Detained) Hydrograph type = Combine Peak discharge = 39.17 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 86,726 cuft Inflow hyds. = 8, 13, 14 Contrib. drain. area = 0.120 ac Total Post (Detained) Q (cfs) Hyd. No. 16 -- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 16 Hyd No. 8 Hyd No. 13 Hyd No. 14 87 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Hyd. No. 17 Post-Development (Undetained) Hydrograph type = Combine Peak discharge = 40.92 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 87,939 cuft Inflow hyds. = 4, 5, 6, 7, 8 Contrib. drain. area = 3.790 ac Post-Development (Undetained) Q (cfs) Hyd. No. 17 -- 100 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 17 Hyd No. 4 Hyd No. 5 Hyd No. 6 Time (min) Hyd No. 7 Hyd No. 8 88 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2023 Wednesday,02/21 /2024 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 65.9292 12.5000 0.8847 -------- 2 75.2309 12.6000 0.8724 -------- 3 0.0000 0.0000 0.0000 -------- 5 81.2314 13.0000 0.8422 -------- 10 81.4959 12.7000 0.8110 -------- 25 71.1332 11.3000 0.7467 -------- 50 63.3230 10.1000 0.6966 -------- 100 58.0693 9.2000 0.6556 -------- File name:Dunn NC.IDF Intensity= B/(Tc + D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.24 4.20 3.51 3.03 2.67 2.39 2.17 1.98 1.83 1.70 1.59 1.49 2 6.16 4.95 4.16 3.60 3.18 2.85 2.59 2.37 2.19 2.04 1.90 1.79 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 7.12 5.79 4.91 4.27 3.80 3.42 3.12 2.87 2.66 2.48 2.32 2.19 10 7.93 6.48 5.51 4.82 4.29 3.88 3.55 3.27 3.04 2.84 2.67 2.52 25 8.85 7.25 6.19 5.44 4.87 4.42 4.06 3.76 3.51 3.29 3.10 2.94 50 9.56 7.83 6.71 5.91 5.31 4.84 4.46 4.14 3.88 3.65 3.45 3.28 100 10.20 8.37 7.19 6.36 5.73 5.24 4.84 4.51 4.24 4.00 3.79 3.61 Tc=time in minutes.Values may exceed 60. Precip.file name:S:\332\37630-123-NTI CumberlandDunnNC\Calc\Stm\H draflow\Dunn NC.pc Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.06 3.71 0.00 4.40 5.60 6.79 6.70 8.83 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Circle K—NTI Dunn, NC Project Number: 37630.123 SCM Design Calculations Wet Pond Worksheets Outlet Protection Calculations Stormwater Supplement Forms TIMMONS GROUP 51 www.timmons.com YOUR VISION RCHIE-D THROUGH OURS. TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Circle K-Dunn, NC Project No.: 37630.123 Calculated By: Date: 02/21/2024 Wet Pond DesignSCM 1 Pollutant/Nutrient Removal Total Suspended Solids(TSS) 85% Nitrogen 30% Phosphorus n/a Basin Characteristics Post-Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Qty Inc Area Total Area Impervious 1.31 0.00 Lawns/Managed Open Space 0.46 Subtotal 0.00 Streets and SW Description Length Imp/Ft Total Area 0.00 0.00 Subtotal 0.00 Other Total to Pond 1.77 Pond Basin CN 81 lGrand Total 0.00 Surface Area to Drainage Area Ratio for Permanent Pool Sizing Drainage Area to SCM Required Surface Area of Permanent Pool Impervious Area Acres (Foreboy&Main Pond Combined) Offsite Impervious Area 0.00 Onsite Impervious Area 1.31 Average Depth(ft)= 3.5 Total Impervious Area 1.31 SA/DA Ratio= 2.45 Required SA(ft2)= 1,889 Total Drainage Area To SCM 1.77 SA as Shown(ft2)= 3,443 Percent Impervious Area 74% SA/DA Ratio from latest NCDENR BMP Manual • • Volumes and •w Permanent/Normal Pool) Elevation Main Forebay Depth Main Forebay Total (ft) Area(sf) Area(sf) (ft) Inc.Vol(cf) Inc.Vol(cf) Vol(cf) 181.0 Bottom of Sediment Storage 182.0 71 0 0.0 Top of Sediment Storage 183.0 251 0 1.0 161 0 161 184.0 452 0 2.0 352 0 513 185.0 684 40 3.0 568 20 1,101 186.0 949 108 4.0 817 74 1,991 187.0 1,242 209 5.0 1,096 159 3,245 188.0 1,561 335 6.0 1,402 1 272 4,919 189.0 2,633 810 7.0 2,097 573 7,588 Total 7.0 1 6,491 1,097 7,588 Verify the Forebay Volume Is Approximately(15%-20%)of the Permanent Pool Volume. 17% Water Quality and Quantity Volumes •• • Pool) -7 Elevation Main Forebay Depth Inc Total Accum'Total (ft) Area(sf) Area(sf) (ft) Vol(cf) Vol(cf) 189.0 3,443 0.00 Permanent Pool Elevation Notes 190.0 3,443 1.00 3,443 3,443 190.5 3,443 1.50 1,722 5,165 WQE/TPE 191.0 3,443 2.00 1,722 6,886 192.0 3,443 3.00 3,443 10,329 0.00 0 10,329 0.00 0 10,329 0.00 0 10,329 AverageVerify the • of •• davg=[Vperm pool-[O.5 X Depth max over shelf X Perimeter perm pool X Width submerged part of shelf]/Abottom of shelf Vperm= 6,491 C.F.(Main Pond) Abottom shelf= 1,561 S.F.(Main Pond) Depth of Water over shelf= 1.0 FT Perimeter perm pool= 211 L.F.(Main Pond) Width submerged part of shelf= 6.0 FT Davg= 3.75 FT Depth for SA/DA= 3.50 FT(Round Dav down to nearest 0.5 ft) 1.0" Quality Using the runoff volume calculations in the"Simple Method"as described by Schueler(1987) Where: Rv= Runoff Coefficient, in/in I=Percent Impervious 1= 74.0% Rv=0.05+0.009(I) Rv= 0.716 1.0 inch runoff volume(Required) Runoff volume,S=(Design rainfall)(Rv)(Drainage Area) Design Rainfall= 1.0 inch Drainage Area= 1.77 acres Storage Required= 4,601 cu.ft. Volume • • For 1 " Runoff Above Permanent Pool (Provided) Depth PPE SA(SF) Top Temp Pool SA(SF) Volume(CF) Elevation 1.50 3,443 3,443 5,165 190.50 Size Water e Day Drawdown Qj. CdA 2 h l Z (Orifice Equation;Cd=0.60) 1.00 Orfice Diameter(inches) 0.49 Driving Head to Centroid of Office(ft)(1-1/3) 0.02 Q1.0"Drawdown Rate(cfs) 4,601 Water Quality Volume(Vw() Vw /(Q1"x 86,400) Drawdown Time(days) 2.9 Drawdown Time(days) 2-5 days) '• • Riser Data& Elevations Pond Type Wet Detention TSS Removal 85% Top of Pond/Berm 193.50 ft Secondary Spillway Width 20.00 ft Bottom of Secondary Spillway 192.00 ft Top of Riser 191.50 ft Riser Type/Size 4x4 ft Top of Water Quality/Temp Pool Elev 190.50 ft Top of Shelf 189.00 ft Permanent Pool Elevation(Normal Pool) 189.00 ft Orifice Elevation&Size 189.00 ft 1.00 in Secondary Orifice Elevation&Size 190.50 ft 4x20 in Bottom of Shelf 188.00 ft Top of Sediment Storage/Pond Bottom 182.00 ft Bottom of Sediment Storage 181.00 ft (Min 1 ft) Invert Out of Riser 188.40 ft Outlet Pipe Size 24.00 in Diameter RCP Outlet Pipe Length&Slope 32.00 ft 0.95 % Downstream Outlet Elevation 188.10 ft 2 Yr Water Surface Elev/Peak Flow(CFS) 190.91 ft 3.08 CFS 10 Yr Water Surface Elev Peak Flow(CFS) 191.50 ft 9.11 CFS 25 Yr Water Surface Elev Peak Flow(CFS) 191.65 ft 13.45 CFS 100 Yr Water Surface Elev Peak Flow(CFS) 191.82 ft 18.99 CFS Pond Detail Top of Riser: 191.50 1 in Orifice Elev 189.00 10'Berm 193.50 Spillway 192.00 100 Yr 191.82 25 Yr 191.65 10 Yr 191.50 2 Yr 190.91 Pond Bottom 182.00 See Plan for accurate outlet design Inv Out: 188.10 Perm Pool Sediment Bottom Invert Out: 188.40 32 LF of 24"RCP @ 189.00 181.00 ft Base: 187.40 0.94% Anti-Bouyancy Calculations for the Riser Structure Riser Dimensions Weight of Structure Displaced Volume Outside Width 5.00 ft Walls= 4,185 LBS V=LxWx(HT+Base)=C.F. Inside Width 4.00 ft Base= 3,750 LBS Outside Length 5.00 ft Displaced Water= Inside Length 4.00 ft C.F."62.4 PCF=LBS Height 3.10 ft Outlet Pipe= 236 LBS Base Thick'(ft) 1.00 ft WQ Orifice= 0 LBS Add 15%Factor of Safety Wall Thick'(ft) 0.50 ft Ext Base(ft) 0.00 ft Weir#1 = 41.66666667 LBS V= 78 C.F. Areas Removed from Riser Weir#2= 1.041666667 LBS Disp.Water= 4,836 LBS Outlet Pipe 3.14 ft Weir#3= 0 LBS 15%F.S.= 725 LBS WQ Orifice 0.01 ft Weir#4= 0 LBS Orifice#1 0.56 ft Other#1 = 0 LBS Safety Factor 58.32% Orifice#2 0.01 ft Orifice#3 0.00 ft Weight= 7,656 LBS Weight= 5,561 LBS Orifice#4 0.00 ft Precast Concrete Riser Structure to be 4 ft x 4 ft x 3.1 ft Tall,With a 1 ft Thick Concrete Other 0.00 ft I Ballast TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Project: Circle K- Dunn, NC Project No.: 37630.123 Calculated By: A. Blye Date: 02/22/2024 Wet • Design CalculationsSCM 2 Pollutant/ Nutrient Removal Total Suspended Solids (TSS) 85% Nitrogen 30% Phosphorus n/a Basin Characteristics Post-Development Drainage Area Estimated Impervious Area to Pond Lots Description Acres Description Qty Inc Area Total Area Impervious 0.00 Lawns/Managed Open Space Subtotal 0.00 Streets and SW Description Length Imp/Ft Total Area 0.00 0.00 Subtotal 0.00 Other Total to Pond 1.39 Pond Basin CN 81 lGrand Total 0.00 Surface Area to Drainage Area Ratio for Permanent Pool • Drainage Area to SCM Required Surface Area of Permanent Pool Impervious Area Acres (Forebay& Main Pond Combined) Offsite Impervious Area Onsite Impervious Area 0.68 Average Depth (ft)= 3.5 Total Impervious Area 0.68 SA/DA Ratio= 1.62 Required SA(ft2)= 981 Total Drainage Area To SCM 1.39 SA as Shown (ft2)= 3,327 Percent Impervious Area 49% SAIDA Ratio from latest NCDENR BMP Manual • • Volumes and (Below • •• Elevation Main Forebay Depth Main Forebay Total (ft) Area(sf) Area(sf) (ft) Inc.Vol(cf) Inc.Vol(cf) Vol(cf) 181.0 Bottom of Sediment Storage 182.0 103 0 0.0 Top of Sediment Storage 183.0 240 0 1.0 172 0 172 184.0 417 0 2.0 329 0 500 185.0 623 31 3.0 520 16 1,036 186.0 859 109 4.0 741 70 1,847 187.0 1,121 221 5.0 990 165 3,002 188.0 1,408 352 6.0 1,265 287 4,553 189.0 2,414 913 7.0 1,911 633 7,096 Total 1 7.0 5,927 1,170 7,096 Verify the Forebay Volume Is Approximately(15%-20%)of the Permanent Pool Volume. 20% Water Quality and Quantity Volumes (Above Permanent/Normal Pool) Elevation Main Forebay Depth Inc Total Accum'Total (ft) Area(sf) Area(sf) (ft) Vol(cf) Vol(cf) 189.0 3,327 0.00 Permanent Pool Elevation Notes 190.0 3,549 1.00 3,438 3,438 WQE/TPE 191.0 3,769 2.00 3,659 7,097 WQE/TPE 192.0 3,988 3.00 3,879 10,976 193.0 4,207 4.00 4,098 15,073 193.5 4,316 4.50 2,131 17,204 0.00 0 17,204 0.00 0 17,204 Verify the Average Depth of • •- davg=[Vperm pool-[0.5 X Depth max over shelf X Perimeter perm pool X Width submerged part of shelf]/Abottom of shelf Vperm= 5,927 C.F.(Main Pond) Abottom shelf= 1,408 S.F.(Main Pond) Depth of Water over shelf= 1.0 FT Perimeter perm pool= 192 L.F.(Main Pond) Width submerged part of shelf= 6.0 FT Davg= 3.80 FT Depth for SA/DA= 3.50 FT(Round Dav down to nearest 0.5 ft) 1.0"Water Quality Runoff • - Using the runoff volume calculations in the"Simple Method"as described by Schueler(1987) Where: Rv=Runoff Coefficient, in/in I=Percent Impervious 1= 48.9% Rv=0.05+0.009(1) Rv= 0.490 1.0 inch runoff volume(Required) Runoff volume,S=(Design rainfall)(Rv)(Drainage Area) Design Rainfall= 1.0 inch Drainage Area= 1.39 acres Storage Required= 2,474 cu.ft. Volume Storage For 1.0" Runoff Above Permanent Pool (Provided) Depth PPE SA(SF) Top Temp Pool SA(SF) Volume(CF) Elevation 1.00 3,327 3,549 3,438 190.00 Size Water Quality Orifice forDay Drawdown Q „=CdA 2 h (Orifice Equation;Cd=0.60) 0.75 Orfice Diameter inches 0.32 Driving Head to Centroid of Orfice(ft)(1-1/3) 0.01 Q1.0"Drawdown Rate cfs 2,474 Water Quality Volume(Vw ) Vw /(Q1"x 86,400) Drawdown Time(days) 3.4 Drawdown Time(days) 2-5 days) ' • • Riser Data&Elevations Pond Type Wet Detention TSS Removal 85% Top of Pond/Berm 193.50 ft Secondary Spillway Width 20.00 ft Bottom of Secondary Spillway 192.00 ft Top of Riser 191.50 ft Riser Type/Size 4x4 ft Top of Water Quality/Temp Pool Elev 190.00 ft Top of Shelf 189.00 ft Permanent Pool Elevation(Normal Pool) 189.00 ft Orifice Elevation&Size 189.00 ft 0.75 in Secondary Orifice Elevation&Size 190.00 ft 44 in Bottom of Shelf 188.00 ft Top of Sediment Storage/Pond Bottom 182.00 ft Bottom of Sediment Storage 181.00 ft Min 1 ft Invert Out of Riser 187.25 ft Outlet Pipe Size 24.00 in Diameter RCP Outlet Pipe Length&Slope 58.00 ft 0.86 % Downstream Outlet Elevation 186.75 ft 2 Yr Water Surface Elev/Peak Flow(CFS) 190.37 ft 0.21 CFS 10 Yr Water Surface Elev Peak Flow(CFS) 191.47 ft 0.50 CFS 25 Yr Water Surface Elev Peak Flow(CFS) 191.71 ft 5.89 CFS 100 Yr Water Surface Elev Peak Flow(CFS) 191.89 ft 13.81 CFS Pond Detail Top of Riser: 191.50 0.75 in Orifice Elev 189.00 10'Berm 193.50 Spillway 192.00 100 Yr 191.89 25Yr 191.71 10 Yr 191.47 2 Yr 190.37 Pond Bottom 182.00 See Plan for accurate outlet design IF Inv Out: 186.75 Perm Pool Sediment Bottom Invert Out: 187.25 58 LF of 24"RCP @ 189.00 181.00 ft Base: 186.25 0.86% Anti-Bouyancy Calculations for the Riser Structure Riser Dimensions Weight of Structure Displaced Volume Outside Width 5.00 ft Walls= 5,738 LBS V=LxWx(HT+Base)=C.F. Inside Width 4.00 ft Base= 3,750 LBS Outside Length 5.00 ft Displaced Water= Inside Length 4.00 ft C.F.*62.4 PCF=LBS Height 4.25 ft Outlet Pipe= 236 LBS Base Thick'(ft) 1.00 ft WQ Orifice= 0 LBS Add 15%Factor of Safety Wall Thick' ft 0.50 ft Ext Base(ft) 0.00 ft Weir#1 = 0 LBS V= 106 C.F. Areas Removed from Riser Weir#2= 0 LBS Disp.Water= 6,630 LBS Outlet Pipe 3.14 ft Weir#3= 0 LBS 15%F.S.= 995 LBS WQ Orifice 0.00 ft Weir#4= 0 LBS Orifice#1 0.00 ft Other#1 = 6.541666667 LBS Safety Factor 39.45% Orifice#2 0.00 ft Orifice#3 0.00 ft Weight= 9,245 LBS Weight= 7,625 LBS Orifice#4 0.00 ft Precast Concrete Riser Structure to be 4 ft x 4 ft x 4.25 ft Tall,With a 1 ft Thick Concrete Other 0.09 ft Ballast a ' Circle K- Dunn, NC ro� IMIIIIIIIIIII April Blye , T I M M O N S GROUP . •>Ln 37630 123 Pipe Outlet Protection (NYDOT Method) Structure Name: 11 Pipe Diameter= 24 in From Fig. 8.06.c: ZONE = 2 Pipe Slope= 0.0095 ft/ft Mannings n = 0.013 Rip Rap Class= B Velocity Flowing Full = 7.04 fps Apron Thickness= 18 in Apron Length = 12.0 ft Apron Width = 3xDia.= 6.0 ft From Fig. 8.06.e: y 3 Length Structure Name: 11 Pipe Diameter= 24 in From Fig. 8.06.c: ZONE = 2 Pipe Slope= 0.0086 ft/ft Mannings n = 0.013 Rip Rap Class= B Velocity Flowing Full = 6.70 fps Apron Thickness= 18 in Apron Length = 12.0 ft Apron Width = 3xDia.= 6.0 ft From Fig. 8.06.e: LIM 7 3 Length LATEST REVISION:8/15/2023 1:52 PM SUPPLEMENT-EZ COVER PAGE FORMS LOADED (PROJECT INFORMATION 1 Project Name CIRCLE K-DUNN,NC 2 Project Area ac _ _ 3.8 3 Coastal Wetland Area ac T N/A 4 Surface Water Area ac N/A 5 Ils this 2roject Hi h or Low Density? High 6 1 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 'Width of vegetated setbacks 2rovided feet 0 8 Will the.vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003 4 c-d? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration S stem 12 _Bioretention Cell 13 'Wet Pond 2 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader-Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 StormFilter _ 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 1 Name and Title: Jacob Dooley, 28 Organization: Timmons Group 29 Street address: 5410 Trinty Rd Suite 102 30 Cit ,State,Zip: _ Raleigh NC 27607 31 Phone numbers: 919-866-4937 32 Email: jacob.dooley@timmons.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer �,o�Essia���ti•.,� �=¢ 7 S SignstA of Designer =z a SEAL 2 048231 x '-.mac►ry•�.Nc�Nti(� o�,��' �/�y�z 3 Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 5 3 Does this Droiect have low densit areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 5 4 Type of SCM Wet Pond#1 Wet Pond#2 N/A(Bypass) 5 Total drainage area(sq ft 164907 77099 60505 27303 6 Onsite drainage area(sq ft 164907 77099 60505 27303 7 Offsite drainage area(sq ft 0 0 0 0 8 Total BUA in project(sq ft 87728 sf 57148 sf 29818 sf 762 sf New BUA on subdivided lots(subject to 9permitting) s ft New BUA not on subdivided lots(subject to 10permitting) sf 87728 sf 57148 sf 29818 sf 762 sf 11 Offsite BUA(sq ft sf sf sf sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft 66589 sf 44580 sf 21393 sf 616 sf -Sidewalk(sq ft 6413 sf 3014 sf 3253 sf 146 sf -Roof(sq ft 6014 sf 5198 sf 816 sf sf -Roadway s ft -Future(sq ft 8712 sf 4356 sf 4356 sf sf -Other,please specify in the comment box below(sq ft New infiltrating permeable pavement on 13 subdivided lots(sq ft New infiltrating permeable pavement not on 14 subdivided lots(sq ft Existing BUA that will remain(not subject to 15permitting) s ft 16 1 Existing BUA that is already permitted(sq ft 752 sf 1403 sf 820 sf 583 sf 17 Existing BUA that will be removed(sq ft 752 sf 1403 sf 820 sf 583 sf 18 Percent BUA 53% 74% 49% 3% 19 Design storm inches 1.0 in 1.0 in 20 Design volume of SCM cu ft 4601 cf 2474 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1 Drainage area number 1 2 21 Minimum required treatment volume cu ft 4601 cf 2474 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM(H:V)? 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered Yes Yes side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes 10- ear storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC 10? N/A N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes 161 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensedprofessional? Yes Yes WET POND MDC FROM 02H.1053 181 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth(bottom of sediment 181.00 181.00 removal)(fmsl 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 182.00 182.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 188.00 188.00 23 Elevation of the permanent pool(fmsl) 189.00 189.00 24 Elevation of the top of the vegetated shelf(fmsl) 189.00 189.00 25 Elevation of the temporary pool(fmsl) 190.50 190.00 26 Surface area of the main permanent pool(square feet) 2633 2368 27 Volume of the main permanent pool(cubic feet) 6491 cf 5904 cf 28 Average depth of the main pool(feet) 3.50 ft 3.50 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3,main pool perimeter(feet) 211.0 ft 192.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 6.0 ft 6.0 ft 32 Volume of the forebay(cubic feet) 1097 cf 1170 cf 33 Is this 15-20%of the volume in the main pool? Yes Yes 34 Clean-out depth for forebay(inches) 60 in 60 in 35 Design volume of SCM(cu ft) 4601 cf 2474 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice,orifice diameter(inches) 1 in 1 in 38 If weir,weir height(inches) N/A N/A 39 If weir,weir length(inches) N/A N/A 40 Drawdown time for the temporary pool(days) 2.9 3.4 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes Yes circuitin ? 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance(inches) 60 in 60 in 44 Depth of forebay at exit(inches) 48 in 48 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 6 ft 6 ft 47 Slope of vegetated shelf(H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the Yes Yes permanentpool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes Yes r,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No No MDC(9)is met. 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Bermuda Bermuda 54 Hasa planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): 2 Circle K—NTI Dunn, NC Project Number:37630.123 Stormwater Operation & Maintenance Agreement • r ■ TIMMONS GROUP 61 www.timmons.com YOUR VISION ACHIEVEO THROUGH Ou RS. Operation & Maintenance Agreement Project Name: Circle K- NTI E. Cumberland & Lehmon - Dunn, NC Project Location: E. Cumberland & Lehmon Ave; Dunn, NC 28334 Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired,or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the pollutant removal efficiency of the SCM(s). The SCM(s)on this project include(check all that apply&corres ❑nding O&M sheets will be added automaticall Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 2 Location(s): South&North Sides of the Property Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader-Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above,and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Meredith Will Rice,Jr. Title&Organization: Vice President-Circle K Stores,Inc. Street address: 1100 Situs Court;Suite 100 City,state,zip: Raleigh,NC 27606 Phone number(s): 919-774-6700 Email:I wrice@circlek.com ` Signature: Date:: 1, a Notary Public for the State of _�-�r` '-��1� ,J County of do hereby certify that ?LiC� fir` personally appeared before me this day of ' (] and acknowledge the due execution of the Opegations and M We Agree Witness my hand and official seal, ROBIN F. ALFORD Notary Public, North Car :flinaJohnston County My Commission Expir April23,2026 Seal My commission expires Q— STORM-Fl 7/28/2023 Version 1.5 O&M Agreement Page 1 of 1 Wet Pond Maintenance Requirements Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground pond erosive gullies have cover and water until it is established. Provide lime and a one- formed. time fertilizer application. The inlet pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site. applicable). The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design depth for sediment where it will not cause impacts to streams or the SCM. The forebay storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. 1 Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design sediment storage where it will not cause impacts to streams or the SCM. depth. The main treatment area Algal growth covers over Consult a professional to remove and control the algal growth. 50% of the area. p g Cattails, phragmites or other invasive plants cover Remove the plants by wiping them with pesticide (do not spray). 50% of the basin surface. Best professional practices show that pruning is Prune according to best professional practices. needed to maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, disease, Plants are dead, diseased etc. Remedy the problem and replace plants. Provide a one- or dying. time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. The embankment A tree has started to grow Consult a dam safety specialist to remove the tree. on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clogging has occurred. Clean out the outlet device and dispose of any sediment in a gg g The outlet device location where it will not cause impacts to streams or the SCM. The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees. a Floating wetland island re growing on the mat. (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state. missing. 1 Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the wet pond are causing erosion Contact the local NCDEQ Regional Office. or sedimentation in the receiving water. 1 Wet Detention Pond Design Summary WET POND ID FOREBAY MAIN POND 1 Permanent Pool El. 189 Permanent Pool El. 189 Temporary Pool El: 190.5 Temporary Pool El: 190.5 Pretreatment other No Clean Out Depth: 5 Clean Out Depth: 8 than forebay? Sediment Removal EI 184 Sediment Removal El 181 Has Veg. Filter? No Bottom Elevation: 185 Bottom Elevation: 182 WET POND ID FOREBAY MAIN POND 2 Permanent Pool El. 189 Permanent Pool El. 189 Temporary Pool El: 190 Temporary Pool El: 190 Pretreatment other No Clean Out Depth: 5 Clean Out Depth: 8 than forebay? Sediment Removal EI 184 Sediment Removal El 181 Has Veg. Filter? Bottom Elevation: 185 Bottom Elevation: 182 ATTACH ADDITIONAL SHEETS IF NECESSARY 1 Circle K—NTI Dunn, NC Project Number: 37630.123 Hydraulic Grade Line Calculations Q10 Analysis Using Hydraflow Software TIMMONS GROUP 71 www.timmons.com YOUR VISION RCHIE-D THROUGH OURS. Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan Outfall 11 OCS201 Outfall CB203 9 10 CB204 D1107 CB105 6 D1106 8 3 B102 4 MH108 CB104 1 ES402 Outfal1OCS101 5 13 7 CB109 MH400 Outfall 12 Outfall Project File: 2023-08-14 37630.123 Storm .stm Number of lines: 13 Date: 8/15/2023 Storm Sewers v2023.00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (fUs) (in) M (ft) (ft) (ft) (ft) (ft) (ft) 1 End 20.437 0.00 1.31 0.00 0.00 1.11 0.0 7.4 7.1 7.95 10.39 6.12 18 0.98 186.50 186.70 187.48 187.79 188.71 193.30 JB102-EW100 2 1 20.978 0.50 0.75 0.85 0.43 0.64 5.0 5.9 7.6 4.85 6.31 4.65 15 0.95 186.65 186.85 187.79 187.74 193.30 191.54 CB112-JB102 3 1 107.513 0.20 0.56 0.85 0.17 0.48 5.0 6.8 7.3 3.48 6.47 4.94 15 1.00 187.45 188.53 188.10 189.28 193.30 192.74 D1104 -JB102 4 3 37.193 0.00 0.15 0.00 0.00 0.13 0.0 6.1 7.6 0.96 4.62 1.51 15 0.51 188.53 188.72 189.28 189.29 192.74 193.10 MH108-D1104 5 4 52.566 0.15 0.15 0.85 0.13 0.13 5.0 5.0 7.9 1.01 4.54 2.31 15 0.49 188.72 188.98 189.32 189.39 193.10 192.94 CB110-MH108 6 3 55.008 0.21 0.21 0.85 0.18 0.18 5.0 5.0 7.9 1.41 6.46 2.59 15 1.00 188.53 189.08 189.28 189.55 192.74 192.75 D1106-D1104 7 End 31.631 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 9.11 22.03 5.98 24 0.95 188.10 188.40 189.00 189.48 190.38 191.50 1 (27) 8 2 73.810 0.25 0.25 0.85 0.21 0.21 5.0 5.0 7.9 1.68 6.47 2.67 15 1.00 186.85 187.59 187.74 188.10 191.54 192.60 CB114-CB112 9 End 16.702 0.37 0.83 0.85 0.31 0.71 5.0 5.4 7.8 5.49 6.51 5.72 15 1.02 187.00 187.17 187.88 188.12 188.44 191.50 CB302-EW300 10 9 59.977 0.46 0.46 0.85 0.39 0.39 5.0 5.0 7.9 3.10 6.46 3.71 15 1.00 187.17 187.77 188.12 188.48 191.50 192.31 CB304-CB302 11 End 58.470 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.85 20.92 2.96 24 0.86 186.75 187.25 187.03 187.57 189.00 191.50 3(3) 12 End 82.272 0.00 0.43 0.00 0.00 0.37 0.0 5.5 7.8 2.84 21.45 4.21 24 0.90 185.20 185.94 185.69 186.53 187.57 189.22 7 13 12 26.181 0.43 0.43 0.85 0.37 0.37 5.0 5.0 7.9 2.90 31.88 3.74 24 1.99 185.94 186.46 186.53 187.05 189.22 188.71 ES402-MH400 Project File: 2023-08-14 37630.123 Storm.stm Number of lines: 13 Run Date: 8/15/2023 NOTES:Intensity=81.50/(Inlet time+ 12.70)^0.81; Return period=Yrs. 10 c=cir e=ellip b=box Storm Sewers v2023.00 Storm Sewer Profile Proj. file: 2023-08-14 37630.123 Storm .stm � N 0 � s J 0 C J 0 ' O V O W O M MOO co O O 000 0 Elev. (ft) o W CD0N P v P 0 a W o Www o wW m E > ca E » }q E > 65 Rs 65 Rs 199.00 199.00 196.00 196.00 193.00 193.00 190.00 190.00 187.00 187.00 20.437E - 184.00 184.00 0 10 20 30 40 50 60 70 80 90 100 HGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 2023-08-14 37630.123 Storm .stm co o= o � LO� CD,a) � 0 00 �qLO Q � Elev. (ft) o� �co ,� �r CD W W o w w >w E > m E �R c c cn ry > c 199.00 199.00 196.00 196.00 193.00 193.00 190.00 190.00 187.00 187.00 184.00 184.00 0 10 20 30 40 50 60 70 80 90 100 HGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 2023-08-14 37630.123 Storm .stm co � C � 7 C � C 7 0 C J O S J 0 J O S J 0 O OOtn co co ONN co O coo 0 M M�� ��in V CAO O 00 O OO co O co O`0 0)coco (M co Elev. (ft) O w O N N o aW o WWW WWW ; WWW N WW c i ; B E ; ; m E ; ; BE > ; M E > cnC�S (n WEE in WE5 to Wcs in [if_S� 204.00 204.00 200.00 200.00 196.00 196.00 192.00 192.00 0 188.00 0 188.00 0 184.00 184.00 0 25 50 75 100 125 150 175 200 225 HGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 2023-08-14 37630.123 Storm .stm O C J Q C O S J O O V ' LO COCDMOB i ^`M LO 00 �0 OLO O 00 V W c6 1� O N w 06 06 O �OA Elev. (ft) o W N �C2� N �Ou w � 2 0 o w + Www + www + Ww m > m E > > E > > E > in C� in I c cn x s s Co 5 204.00 204.00 200.00 200.00 196.00 196.00 192.00 192.00 0 188.00 0 188.00 0 184.00 184.00 0 25 50 75 100 125 150 175 200 HGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 2023-08-14 37630.123 Storm .stm O co c J G 0 0 CDC) v or' CO C2 Elev. (ft) g w co o -o tit o W u1 caE > E > cn 0 r to ry 5 201.00 201.00 198.00 198.00 195.00 195.00 192.00 192.00 189.00 189.00 0 186.00 186.00 0 10 20 30 40 50 60 70 80 90 100 HGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 2023-08-14 37630.123 Storm .stm N M (V � :3 C iz J O S J O N O N 1 NOM LO co LO O QO N a0 Oo 6 q _coElev. (ft) g w o - o w o -a w o www + ow co E > @ 9 » B E > U) ry U) Ur S 202.00 202.00 198.00 198.00 194.00 194.00 190.00 190.00 186.00 8 186.00 182.00 182.00 0 10 20 30 40 50 60 70 80 90 100 110 HGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 2023-08-14 37630.123 Storm .stm 0 D C J 000 C J O O T CY)r Elev. (ft) g w 6 �°2!° 6 � O o -oW o WWW o ww ca E m E» 3 E > fA 0 c (A RE c (n D�S 199.00 199.00 196.00 196.00 193.00 193.00 190.00 190.00 187.00 Lf-15" 1.00% 187.00 184.00 1 1 184.00 0 10 20 30 40 50 60 70 80 90 100 HGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: 2023-08-14 37630.123 Storm .stm oo � o� u)LO f� N O (D O O Elev. (ft) o w � OD 0 o -6W o wW caE > E � 199.00 199.00 196.00 196.00 193.00 193.00 190.00 190.00 187.00 187.00 .470Lf-2 0.86% 184.00 184.00 0 10 20 30 40 50 60 70 80 90 100 HGL Reach (ft) Storm Sewers