HomeMy WebLinkAboutNCC203484_NOT Closeout Documents_20240312 From: Gabrielle Bryson <Gabrielle.Bryson@rockymountnc.gov>
Sent: Wednesday, March 6, 2024 3:05 PM
To: Luke Rhoades; Allen Goff
Subject: RE: Sun Farms VIII Permit/Project Closeout
You don't often get email from gabrielle.bryson@rockymountnc.gov.Learn why this is important
Luke,
To reiterate,the previous email from me is confirming that even if you do not have a final inspection
report from the city, everything related to the ESC permit with the city has been closed out.We
cannot revisit a site and provide a letter/inspection report for a construction project that has been
inactive for three years, as this project is closed out in our eyes. Hope this provides clarification.
Respectfully,
Gabby Bryson,Stormwater Engineer
City of Rocky Mount,Engineering
331 Franklin Street
Rocky Mount, NC 27802
Office:252-972-1340
Cell:252-343-9459
gabrielle.bryson Prockymountnc.gov
(41 ROCKY MOUNT, NC
THE CENTER OF IT ALL
SM
From: Luke Rhoades<Irhoades@pgrenewables.com>
Sent: Wednesday, March 6, 2024 2:08 PM
To: Gabrielle Bryson <Gabrielle.Bryson@rockymountnc.gov>; Allen Goff
<allen.goff@rockymountnc.gov>
Subject: RE: Sun Farms VIII Permit/Project Closeout
[EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.
Allen/Gabrielle,
I've not had luck chasing down the final inspection report, which is required for close out of our COC. Is
there any way you could assist in finding a copy? Perhaps there is someone who may have been closer
to these inspections?
Thanks in advance,
rIMM Luke Rhoades
IVA N N Manager,Project Development Engineering
0:(828)407-1161
1....1 pinegaterenewables.com
From: Luke Rhoades
Sent: Friday, February 23, 2024 12:43 PM
To: Gabrielle Bryson <Gabrielle.Bryson@rockymountnc.gov>; Allen Goff
<allen.goff@rockymountnc.gov>
Subject: RE: Sun Farms VIII Permit/Project Closeout
Thank you for following up,that's good news. I do think I will need a copy of the final inspection report
to submit the Notice of Termination with DEQ, so if you manage to find it I would appreciate you sharing
it here. In the meantime, I'll ask around and see if we have a copy somewhere.
Thanks again for your help!
♦U U U Luke Rhoades
IVAMOI Sr Development Engineer
I 0:(828)407-1161
■■■■ pinegaterenewables.com
From: Gabrielle Bryson <Gabrielle.Bryson@rockymountnc.gov>
Sent: Friday, February 23, 2024 8:23 AM
To:Allen Goff<allen.goff@rockymountnc.gov>; Luke Rhoades<Irhoades@pgrenewables.com>
Subject: RE: Sun Farms VIII Permit/Project Closeout
' You don't often get email from gabrielle.bryson@rockymountnc.gov.Learn why this is important
Luke,
Since the project has been closed out,the city also considers any permits associated with
stormwater to also be closed out with the city.
Gabby Bryson,Stormwater Engineer
City of Rocky Mount,Engineering
331 Franklin Street
Rocky Mount, NC 27802
Office:252-972-1340
Cell:252-343-9459
gabrielle.bryson@rockymountnc.gov
(13) ROCKY MOUNT, NC
THE CENTER OF IT ALL
From: Allen Goff<allen.goff@rockymountnc.gov>
Sent: Friday, February 23, 2024 7:02 AM
To: Gabrielle Bryson <Gabrielle.Bryson@rockymountnc.gov>; Luke Rhoades
<Irhoades@pgrenewables.com>
Subject: Re: Sun Farms VIII Permit/Project Closeout
Yes, this project was closed out. I can't find the final report showing all measures were
removed, but they were.
Allen Goff
City of Rocky Mount
Construction Inspector Supervisor
Engineering Department
Office (252)467-4941
Cell (252)343-3158
From: Gabrielle Bryson <Gabrielle.Bryson@rockymountnc.gov>
Sent:Thursday, February 22, 2024 2:47 PM
To: Luke Rhoades<Irhoades@pgrenewables.com>; Allen Goff<allen.goff@rockymountnc.gov>
Subject: RE: Sun Farms VIII Permit/Project Closeout
Hello Allen,
Can you confirm that this project has closed out? It is located in the county, but was
reviewed/permitted by the city. It was Sun Farms VIII, munis code 2018-03271
Gabby Bryson,Stormwater Engineer
City of Rocky Mount,Engineering
331 Franklin Street
Rocky Mount, NC 27802
Office:252-972-1340
Cell:252-343-9459
gabrielle.bryson@rockymountnc.gov
ROCKY MOUNT, NC
THE CENTER OF IT ALL
From: Luke Rhoades<Irhoades@pgrenewables.com>
Sent:Thursday, February 22, 2024 2:26 PM
To: Gabrielle Bryson <Gabrielle.Bryson@rockymountnc.gov>
Subject: Sun Farms VIII Permit/Project Closeout
[EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.
Good afternoon,
As we just discussed in our call, I'm interested in obtaining confirmation of permit and project close out
for the Sun Farm VIII solar project. I've not been able to find any inspection reports for the project, only
a couple permit renewal fees which have since been paid. If any work needs to be done to close the
project out, I'd love to get that kicked off as soon as possible.
Any guidance and documentation you can provide would be greatly appreciated!
Thanks,
r I M E Luke Rhoades
I/M MI Sr Development Engineer
0: (828)407-1161
.... pinegaterenewables.com