Loading...
HomeMy WebLinkAboutNCG020096_Tier 1 Report_20230413 AdhkMartin Jay Nivens Uariettc Regional Manager Environmental Services East Division April 12,2023 Submitted FedEx DEQ Winston Salem Regional Office Attn:DEMLR Stormwater Program NC Department of 450 West Hanes Mill Road Environmental Quality Winston Salem,NC 27105 Received APR 13 2023 RE: Martin Marietta Salem Stone Quarry NPDES Permit#NCG020096 Winston-Salem Stormwater Sample Tier 1 Exceedance Report Regional Office Dear DEMLR Stormwater Program: This letter is to complete the required sample exceedance notifications as outlined in Part F, Sect. F-7 of the NPDES permit for our Salem Stone Quarry located at 4572 High Point Road Kernersville,NC. I have attached the Stormwater Sample Exceedance Report for the first quarter 2023 stormwater sample which resulted in an exceedance of the Turbidity baseline. Should you have any questions or need any additional information,please contact me at 704-409-1475 or via e- mail at jay.nivens@martinmarietta.com Sincerely, Charlotte District Office 8701 Red Oak Blvd.Suite 540,Charlotte,NC 28217 t.(704)409-1475 m.(980)613-9009 e.jay.nivens@martinmarietta.com www.martinmarietta.com Martin Marietta Stormwater Sample Exceedance Report Site: Salem Stone Quarry Date sample was collected: March 27, 2023 Outfall location: Stormwater Outfall #1 Benchmark Parameter Exceeded: • Turbidity—84 NTU (Tier l Exceedance for Turbidity benchmark of 50 NTU) Date of Lab Results: April 4, 2023 Date of Stormwater Management Inspection: April 6, 2023 Personnel in attendance: Ryan Balint—Asst. Plant Manager, Salem Stone Quarry Barry McConnell—Forman, Salem Stone Quarry Inspection Observations: Maintenance needed at inlet of basin. Proposed Actions: Provide maintenance at inlet of basin and upstream to provide better treatment of stormwater runoff. Date Actions Implemented: Completed by the end of April 2023.