Loading...
HomeMy WebLinkAbout20050675 Ver 3_More Info Letter_20071115.,. W a r o~oF FgQG Michael F. Easley, Governor ~ William G. Ross Jr., Secretary ~ ~ North Carolina Department of Environment and Natural Resources ~ ~ p -r Coleen H. Sullins, Director Division of Water Quality November 15, 2007 DWQ Project # OS-0675, Ver. 3 Johnston County Mr. William R. O'Neal, V 5 Nicklaus Way . Clayton, NC 27520 Subject Property: Moss Creek Village Business Park Ut to Little Creek [030402, 27-43-12, C, NSW] REQUEST FOR MORE INFORMATION: DIFFUSE FLOW PLAN Dear Mr. O'Neal: On July 10, 2007, the Division of Water Quality (DWQ) issued an After-the-Fact 401 Water Quality Certification to place fill within or otherwise permanently impact 8 linear feet of perennial stream, and temporarily impact 882 square feet of Zone 1 Neuse River basin protected riparian buffers, to construct the proposed stormwater drainage connection. In order to meet Condition 8 of the 401 Certification for this. project, a diffuse flow plan was received by the DWQ on October 15, 2007. The DWQ has determined that your diffuse. flow plan was incomplete as discussed below Additional Information Requested The slope in the filter strip (i.e., the land between the level spreader lip and the top of streambank) appears to be greater than 16 percent (assuming one-foot contour intervals -the contour lines are not labeled). This slope exceeds the 8 percent maximum filter strip slope that is allowed downslope of a level spreader. Since diffuse flow cannot be established at this location, a stormwater BMP (or combination of BMPs) that removes a minimum of 85 percent of TSS and 30 percent of total nitrogen must provided. All BMPs must be designed in accordance with the most recent version of the DWQ BMP Manual and should be designed to handle the stormwater flows at the ultimate build-out condition. 2. In your resubmittal, please provide one completed BMP Supplement Form for each proposed stormwater BMP. The BMP Supplement Form must include both worksheets (Design Summary and Required Items Checklist) as well as all required items. The BMP Manual and BMP Supplement Forms are available at the following web site: http://h2o.enr.state.nc.us/s1.llbrn~ forms.htm. The DWQ will require the above additional information to finalize review of the stormwater management plan for the subject property. Please provide the following information so that we may continue to review your project. You are welcome to contact me at 919-715-3425 if you have questions or would like to set up a meeting. 401 Oversight/Express Review Permitting Unit 1650 Mai] Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: http:Nh2o.c~~rstate.nc.us~ncwetlands An Equa] Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. William R. O'Neal, V Page 2 of 2 November 15, 2007 Sincerely, h h,e.~..' e~ Annette Lucas, Environmental Engineer III 401 Oversight/Express Review Permitting Unit AML/aml cc: USACE Raleigh Regulatory Field Office Lauren Cobb, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Daniel W. Blackburn, Blackburn Consulting Engineering, 234 East Main Street, Clayton, NC 27520 Filename: 050675 Ver3MossCreekVillageBusinessPark(Johnston)_S W_Hold