Loading...
HomeMy WebLinkAboutSW8071221_Current Permit_20080114 O�QF W R rFgpG Michael F.Easley,Governor William G.Ross Jr.,Secretary r North Carolina Department of Environment and Natural Resources > O '< Coleen H.Sullins,Director Division of Water Quality January 14,2008 Cumbee Rd. Partners, LLC Attn.:Adam.Gsk,Member-Manager 6263 Ingleside Drive Wilmington, NC 28411 Subject: Permit No.SW8071221 Sea Wynde Plantation, Phase III High Density Stormwater Project Brunswick County Dear Mr. Lisk: The Washington Regional Office received a completed Stormwater Application for the subject project on December 27, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8071221 dated January 14, 2008 to Cumbee Road Partners, LLC for a wet detention pond to serve the Sea Wynde Plantation, Phase III development located at the intersection of Cumbee Road and NC 1.7 near Shallotte, NC. This permit shall be effective from the date of issuance until January 14, 2018 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. The issuance of this permit does not resolve any previous violations of the stormwater rules for construction without a permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings,6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor or me at(252)946-6481. kSincy, Al Hodg ,ttid-lnlk— -visor Surface Water Protection Section Washington Regional Office AH/sd: J:\WPDATA\WQS\State SW-SD\Permits—Wet Pond cc: John F.Oglesby, PE,Trigon Engineering(700 Blue Ridge Rd. St. 101, Raleigh, NC 27606) Brunswick County Building Inspections Department Vashington Regional Office Wilmington Regional Office Central.Files North Carolina Division of Water Quality Internet: NN-'ww.ncwatergualir,.oro One 943 Washington Square Mall Phone(252)946-6481 NorthCarohna Washington,NC 27889 Fax (252)946-9215 Naturally An Equal Opportunity/Affirmative Action Employer—50%Recyded110%Post Consumer Paper State Stormwater Management Systems +y Permit No. SW8071221 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143' General*Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HERESY GRANTED TO Cumbee Road Partners,LLC Sea Wynde Plantation, Phase III FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.10W (hereafter referred to as the-"stoa*mter.,rules.J and the approved stomrnwater management plans and specfications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for a wet detention pond b serve the Sea Wynde Plantation, Phase III development located at the intersection of Cumbee Road and NC 17 near Shallotts, NC. This permit shall be effective from the date of issuance until January 14, 2018 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwatier'described in the application and other supporting data. 2. Each of the 144 lots in this 48.4 acres residential development is limited to a'ma)dmum-°of 3,820 square feet of built-upon area, as indicated in the approved plans 3. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit,the Project Data Sheet 4. A maximum of 17.66 acres(769,077 square feet)of built upon area is allowed on this 484 acre site. S. All stormwater collection and treatment systems must be looted in either dedicated common arm or recorded easements.The final plats for the project will be-recorded showing all such reduired easentts, in accordance with approved plans. 6. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit DIVISION OF WATER QUALITY WET POND-PROJECT DATA Project Name: Sea Wynde Plantation, Phase III Permit Number: SW8071221 Location: Brunswick County Applicant Cumbee Rd. Partners, LLC Mailing Address: 6263 Ingleside Drive Wilmington, NC 28411 .Application Date: 12/27/2007 Receiving Stream: Williams Branch Classification of Water Body: C; SW; HOW Total Site Area: 48.4 ac Design Storm: 1.5"(per Phase If requirement) WET DETENTION BASIN Drainage area: 35.49 ac Total Impervious allowed on site: 17.66 ac. Wet Pond Depth: 4.0 ft Permanent Pool elevation FMSL: 37.50 ft Temporary Pool elevation FMSL: 38.23 ft Required Storage Volume: 96,156 cf Provided Storage Volume: 101,997 cf Required Surface Area: 86,109 sf Provided Surface Area: 87,717 sf Controlling Orifice: 4"@ el. 37.5 ft 7. .No homeowner/lot owner/developer°shsll be allowed-to-fill in, alter, or pipe any vegetative practices(such as swales) shown on the.approved.plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 8. The following items will requiPe'a modification to the permit a. Any revision to the approved plans,regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built-upon area e. Further subdivision of the project area. In-addition,the Dlrector may determine that other revisions to the'project should require,a modification to the permit. 9. The Director may notify the WMittoe when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and!certification h writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 11. The permittee will comply'with-the following schedule for construction and maintenance of the stormwater -.-,management system. a. The stormwater management system shall be constructed in its'entirety,'vegetatdd and operational for its intended use prior to the construction of any built upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3. Prior to the sale of the permitted lot or future development areas, the following deed restrictions must-be recorded: a.- The following covenants are intended to ensure ongoing compliance-with State Sinrmwater Management Permit Number SW8071221, as issued by the Division of Water Quality under NCAC 2H.1000. ..b. The.State of North Carolina is made a beneficiary,of these covenants to the extent necessary to maintain compliance with the stormwater management permit. G. These covenants are to run with the land and be binding on all persons and parties claiming under them., d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the .drainage as shown 'on the approved plan may not take place without the concurrence of the Division of Water Quality. f. The maximum allowable built-upon area per lot is 3,820 square feet. This allotted amount includes any built-upon area constructed within the lot property boundaries; and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and paridr7g areas,.but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff from the built-upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including tuof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swa/es to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to.provide these additional measures. 4. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to:. a. Semiannual scheduled inspections(every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes . d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. . Debris removal-and unclogging of outlet structure,orifice.device and catch basins and piping. 5. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ.:The records will indicate the date,activity, name of person performing the work and what actions were taken. 6. This permit shall become voidable unless the facilities are constructed:in accordance with the conditions of this permit,the approved plans and specifications, and other supporting data. 7. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina,27889,attention Division of Water Quality. 8. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL CONDMONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215.6(a)to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and'all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to.perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including.those as may be required by.this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. The Permittee,at.least six(6)months prior to the expiration of this permit, shall submit in writing a request for an extension along with appropriate application fee. Permit issued this the fourteenth day of January,2008. NORTH CAROLINA ENVIRONMENTAL MANAQEMENT CwQ;6M,ISGI0N for Colson H.Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8071221 Cumbee Road Partners, LLC-Sea Wynde Plantation, Phase III Stormwater Permit No. SW8071221 Designer's Certification I, ,as a duly Registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. 9 ne outievoypass structure elevations are per toe approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outiet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. Wet Detention Basin Inspection and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system(check one): ❑does N does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does N does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established,the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed,until the plants become established(commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance,the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year,a dam safety expert should inspect the embankment. After the wet detention pond is established,it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches(or 1.5 inches if in a Coastal County). Records of inspection and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the blem: The entire BMP Trash/debris is present Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Degrade the soil if necessary to detention basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of 14 1 approxilm.,tel six inches. BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise dams d. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying, The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead,diseased or Determine the source of the dying- problem: soils,hydrology,disease, etc.. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary, Weeds are present Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. ' The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth Cattails,phragmites or other Remove the plants by wiping them invasive plants cover 50%of with pesticide(do not spray). the basin surface. BMP element: Potential blew How I will remediate the roblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embanlmient. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs re The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-sine. The outlet device is damaged Repair or replace the outlet device. The receiving,water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office,or outlet the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 34.5 feet in the main pond,the sediment shall be removed. When the permanent pool depth reads 34.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 37.5 Sediment Removal .34.5 P en Pool -------------- -- Volume Sediment Removal Elevation 34.5 ---- Volume Bottom Elevatio 33.5 ft Min. ---------------------------------------- ------ Sediment Bottom Elevation 33.5 l-ft Storage Sediment Storage POREBAY MAIN POND { I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name:Adam Lisk Title:Managing Member of Cumbee Road Partners, LLC Address:7616 Hawk Road, Wilmington, NC 28411 Phone:910-352-0634 Signature: Date: 3 Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, '�✓��. J ���r�.r. (,LL,.) , a Notary Public for the State of County of�c,N 4" ,. , do hereby certify that personally appeared before me this 3 day of DCD'7 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, n.rx.� QUA WARRpW&�o a° 0 T A 91- 4'2 f Z t A VE �iUBLOG 9�OW R COS w, SEAL My commission expires '��� DWQ USE ONLY Date Received Fee Paid Permit Number a State of North Carolina 5w CK lx/g,'Po Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name(specify the name of the corporation,individual,etc.who owns the project): Cumbee Road Partners 2. Print Owner/Signing Officiars name and title(person legally responsible for facility and compliance): Adam Lisk,Managing Member 3. Mailing Address for person listed in item 2 above: 6263 Ingleside Drive City:Wilmington State:NC Zip:28411 Phone: (910 352-0634 Fax: { ) Ema:H:adandisk@mnail.com 4. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Sea Wvnde Plantation,Phase 3 5. Location of Project(street address): Anvr.0.5 miles south of intersection of NC 17(Ocean Hwy.West and Cumbee Road City:Shallot6e County:Brunswick 6. Directions to project(from nearest major intersection): See Above,Through Phase 1 Collector Road B(under construction)to Phase 3 7. Latitude:33 5918.33 N Longitude:7819 33.12 W of project 8. Contact person who can answer questions about the project: Name:Linda Vasil.EIT Telephone Number: (919 755-5011 x127 EmaiL•lvasil®trigonengcom IL PERMIT INFORMATION: 1. Specify whether project is(check one): ®New ❑Renewal ❑Modification Form SWU-101 Version 8.07 Page 1 of 2. If this application is being submitted as the result of a renewal or modification to an existing permit,list the existing permit number and its issue date(if known) 3. Specify the type of project(check one): ❑Low Density ®High Density QRedevelop General Permit QUniversal SMP ROther 4. Additional Project Requirements(check applicable blanks): ❑CAMA Major ®Sedimentation/Erosion Control 0404/401 Permit QNPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below,summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages)describing stormwater management for the project. One(1)Wet Detention Pond will treat stormwater based on the surface area to drainage area ratio for 90%TSS removal. 2. Stormwater runoff from this project drains to the Lumber River basin. 3. Total Site Area:35.49 acres 4. Total Wetlands Area:7.16 acres 5. 100'Wide Strip of Wetland Area:4 acres (not applicable if no wetlands exist on site) 6. Total Project Area**:48.4 acres 7. Project Built Upon Area:73.3 % 8. How many drainage areas does the project have?l 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Williams Branch Stream Class&Index No. Q Sw;HQW&15-25-2-9-1 Drainage Area(sf) 1,545,944 Existing Impervious*Area(sf) 0 Proposed Impervious*Area(sf) 769,077 %Impervious*Area(total) 49.7 Impervious*Surface Area Drainage Area 1 Drainage Area 2 On-site Buildings(so 549,802 On-site Streets (so 19Ci525 On-site Parking (sf) 0 On-site Sidewalks (sf) 22,750 Other on-site (sf) Off-site (sf) Total (sf): 769,077 *Impervious area is defined as the built upon area including,but not limited to,buildings,roads,parking areas, sidewalks,gravel arras,etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. Form SWU-101 Version 8.07 Page 2 of 4 10. How was the off-site impervious area listed above derived?N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparceLs and future development prior to the sale of any lot. If lot sizes vary significantly,a table listing each lot number,size and the allowable built-upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below,you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the State,and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s)listed below must be submitted for each BMP specified for this project Contact the Stormwater and General Permits Unit at(919)733-5083 for the status and availability of these forms. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off-Situ System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-Level Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality(DWQ). f A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at httP: h2o.enr.state.ne.us/suirnsi maLs.hbi 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form I.T✓ • Original and one copy of the Deed Restrictions&Protective Covenants Form LJ V • Original of the applicable Supplement Form(s)and O&M agreement(s)for each BMP LSV • Permit application processing fee of$505 ($4,000 for Express)payable to NCDENR Lf V • Calculations&detailed narrative description of stormwater treatment/management V • Copy of any applicable soil report L T V • Three copies of plans and specifications(sealed,signed&dated),including: L -Development/Project name -Engineer and firm -Legend -North arrow -Scale -Revision number&date -Mean high water line -Dimensioned property/project boundary -Location map with named streets or NCSR numbers -Original contours,proposed contours,spot elevations,finished floor elevations -Details of roads,drainage features,collection systems,and stormwater control measures -Wetlands delineated,or a note on plans that none exist -Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations -Drainage areas delineated -Vegetated buffers(where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf,please complete this section. Designated agent(individual or firm):Trigon Engineering Consultants,Inc. Mailing Address:700 Blue Ridge Road City:Raleigh State:NC Zip:27606 Phone: (919 ) 755-5011 Fax: (919 ) 755-1414 Email:lvasil@trigoneng.com VIII. APPLICANT'S CERTIFICATION I, (print or type narne of person listed in General Information,iteni 2)Adarn Lisk,Managing Member certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will he constructed.in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of 15A NCAC 2H.1000. Signature: - �f Date: P�y Form SVIU-101 Version 8.07 Page 4 of 4 Permit No. (tv be pmvWed by DING) A*W oaoF warF,9�c 5 r NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM 'VET DETENTION BASIN SUPPLEMENT This form must be filled out,printed and submitted. The Required Items Checklist(Part Ill)must be printed,filled out and submitted along with all of the required information. L PROJECT INFORMATION Project name Sea Wynde Plantation,Phase 3 Contact person Linda Vasil,EIT,Trigon Engineering Consultants Phone number 919-755-5011 x127 Date 11/29/2007 Drainage area number Only one main drainage area to Wet Pond. 11. DESIGN INFORMATION Site Characteristics Drainage area 1,545,944 fe Impervious area 769,077 fe %impervious 49.74805038 % Design rainfall depth 1.5 in Storage Volume: Non-SR Waters Minimum volume required 96,156 its Volume provided 101,997 fts Storaae Volume: SR Walham 1-yr,24-hr runoff depth in Pre-development 1-yr,24-hr runoff fe Post-development 1-yr,24-hr runoff fe Minimum volume required fe Volume provided fe Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? y (Y or N) 1-yr,24-hr rainfall depth 3.7 in Rational C,pre-development scs pe- CN 63.0 (unitless) Rational C,"evelopment-5cs fQ5T C.14 79.0 (unitless) Rainfall intensity:l-yr,24-hr storm — in/hr Pre-development 1-yr,24-hr peak flow 6.9 its/sec Post-development 1-yr,24-hr peak flow 25.1 fe/sec, PrelPost 1-yr,24-hr peak flow control 18.2 felsec Basin Elevations Basin bottom elevation 33.50 ft Sediment cleanout elevation 34.50 it Permanent pool elevation 37.50 ft Temporary pool elevation 38.23 ft Volume and Surface Area Calculations SAIDA ratio 5.04 (unitises) Permanent pool,surface area required 86,109 f? Permanent pool,surface area provided 87,717 fta OK Permanent pool volume 302,747 fe Average depth for SAIDA tables 3.451406227 ft OK Forebay volume 62,239 fe Forebay%of permanent pool volume 21 % OK Temporary pool,surface area provided 93,652 fe Form SW401-Wet Detention Basin-Rev.2 Parts I.&11.Design Summary,Page 1 or 2 Permit No. (b be Pro~byDWQJ II. DESIGN INFORMATION Drawdown Calculations Treatment volume drawdown time 2.92 days Treatment volume discharge rate 0.25 fees Pre-development 1-yr,24hr discharge 5.65 to/s Post-development 1-yr.24hrdischarge 0.07 fees Additional Informatlon Diameter of orifice 2.00 in Design TSS removal 90 % Basin side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10 ft OK Length of flowpath to width ratio 5.3 :1 OK Length to width ratio 5.3 :1 OK Trash rack for overflow&office? y (Y or N) OK Freeboard provided 1.73 it OK Vegetated filter provided? N (Y or N) Design must be based on 90%TSS removal Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies fl)mf-tHAU- gE PRd,rr CI> WIJ SITE- Mr— I-W IJTfAJAk eM:- Form SW401-Wet Detention Basin-Rev2 Parts 1.8 II.Design Summary,Page 2 of 2 Permit No. (to be provided by DWty Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result In a request for additional information. This Will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent,the agent may initial below. If a requirement has not been met,attach justification. Pagel Plan Initials Sheet No. L V C-9.O 1. Plans(1'-50'or larger)of the entire site showing: PA*4NAW -Design at ultimate build-out, "M 0, -Off-site drainage(if applicable), G-1 ) -Delineated drainage basins(include Rational C coefficient per basin), Z i Prr y -Basin dimensions, 5WOWTs -Pretreatment system, 1-3 High flow bypass system, -Maintenance access, -Recorded drainage easement and public right of way(ROW), -Overflow device,and -Boundaries of drainage easement. 2.Paul plan(1'=30'or larger)and details for the wet detention basin showing: -Outlet structure with trash rack or similar, -Maintenance access, -Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf,and -Filter strip. 3. Section view of the dry detention basin(1"=20'or larger)showing: -Side slopes,3:1 or lower, -Pretreatment and treatment areas,and -Inlet and outlet structures. Ov 79'L- 4. If the basin is used for sediment and erosion control during construction,clean out of the basin is specified on the plans prior to use as a wet detention basin. p 9 cA 5.A table of elevations,areas,incremental volumes&accumulated volumes for overall pond and for forebay, *Do V-- to verify volume provided. LA1,6—. 9601c, 6.An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. L_ V C-1, 7.A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. LW .1W 8. The supporting calculations. ATAC*WV 9.A copy of the signed and notarized inspection and maintenance(10)agreement. LJW ��ta 10.A copy of the deed restriction. Form SW401 Wet Deternion Basin-Rev.1 Part III.Required Items Cheddist,Page 1 of 1 High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built-upon"area consistent with the design criteria used to size the stormwater control facility. I, A D4vy. L1 S 1L , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number , as issued by the Division of Water Quality under NCAC 2H.1000, 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 3 Hid 6. The maximum allowable built-upon area per lot is r square feet. This allotted amount includes any built-upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built-upon areas per lot will vary, please REPLACE#6 above with the following: 6. The maximum built-upon area per lot, in square feet, is as listed below. Lot# BUA Lot# BUA Lot# BUA Lot# BUA This allotted amount includes any built-upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming Pools. 7. All runoff from the built-upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. Signature: r Date: f .z ` 3 Q 7 I, �r�<<„� �,)a�� .- �(l•-=5 �(_o a Notary Public in the State of L , County of do hereby certify that personally appeared before me this the day of �C( L� b�� , 20 c'1 , and acknowledge the due xecutio(n` of the foregoing instrument. Witness my hand and official seal, 1 SEAL V` Signatur, My Commission expires 01 WARREN�1 ,,, _ P , ate' i . Fonn DRPC 3 Rev. Page 1 of 1 f? �, . L � � L ii i U y LX ,Avl vq,