Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0043148_Application_20241102
You don't often get email from michael.hall@deq.nc.gov. Learn why this is important From:Barnes, Kenric To:Hall, Michael; Grissinger, Tim; Sparrow, Shelbey Subject:RE: [External] RE: Bexford Phase 1,2, and 6, 3 and 4, and 5, and 7-10 Fast Track Sewer Extension Permit Applications - Information Requests Date:Friday, March 1, 2024 6:57:24 AM Attachments:image001.png image002.png image003.png image004.png CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Mr. Hall, I confirm that there are no high-priority crossings with this project. Thanks for all your help. Thanks, Kenric Barnes, PE Civil Engineering & Land Development phone: 919-577-1080 EXT 106 fax: 919-577-1081 2524 Reliance Avenue, Apex 27539, NC, US www.batemancivilsurvey.com From: Hall, Michael <michael.hall@deq.nc.gov> Sent: Thursday, February 29, 2024 3:24 PM To: Barnes, Kenric <k.barnes@batemancivilsurvey.com>; Grissinger, Tim <t.grissinger@batemancivilsurvey.com>; Sparrow, Shelbey <s.sparrow@batemancivilsurvey.com> Subject: RE: [External] RE: Bexford Phase 1,2, and 6, 3 and 4, and 5, and 7-10 Fast Track Sewer Extension Permit Applications - Information Requests Mr. Barnes: Good afternoon. This is exactly what we need, I appreciate it! I am out of the office today and tomorrow, but will be able to use this to assess your applications next week, and make sure that everything is correct. One thing I noticed with this map is that there are several areas where lines cross streams. As I said, I am out of the office, and do not have a copy of your applications, but one of the key things I will need to check is whether or not you have any high- priority crossings. I recall that you did have 401 certifications for work around the streams. If you have high priority crossings, you will need to provide the details as indicated in the application. If not, I would appreciate if you could confirm that you have evaluated this © 2022 Microsoft Corporation © 2022 TomTom F M F M F M FM S F W FW F W F WFW FW FW F W FW C C C C HH MB P: \ 2 0 1 9 P r o j e c t s \ 1 9 0 4 1 9 H i l l t o p ( T e r r a m o r ) \ E N G \ D W G \ E x h i b i t s \ D W R \ P _ 1 9 0 4 1 9 _ D W R _ F T A _ M A P S . d w g PROJECT #: DATE: Ba t e m a n C i v i l S u r v e y C o m p a n y En g i n e e r s S u r v e y o r s P l a n n e r s 25 2 4 R e l i a n c e A v e n u e , A p e x , N o r t h C a r o l i n a 2 7 5 3 9 Ph o n e : 9 1 9 . 5 7 7 . 1 0 8 0 F a x : 9 1 9 . 5 7 7 . 1 0 8 1 NC B E L S F I R M N o . C - 2 3 7 8 01.18.22 BE X F O R D S U B D I V I S I O N FA S T T R A C K S E W E R A P P L I C A T I O N M A P S P_190419 SHEET #: SHEET 1 0 SCALE 1"=1,000' 2,000'1,000' N W W W C C C C C T T HH MB W W W WFM FM F M F M F M W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS S S SS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS P: \ 2 0 1 9 P r o j e c t s \ 1 9 0 4 1 9 H i l l t o p ( T e r r a m o r ) \ E N G \ D W G \ E x h i b i t s \ D W R \ P _ 1 9 0 4 1 9 _ D W R _ F T A _ M A P S . d w g PROJECT #: DATE: Ba t e m a n C i v i l S u r v e y C o m p a n y En g i n e e r s S u r v e y o r s P l a n n e r s 25 2 4 R e l i a n c e A v e n u e , A p e x , N o r t h C a r o l i n a 2 7 5 3 9 Ph o n e : 9 1 9 . 5 7 7 . 1 0 8 0 F a x : 9 1 9 . 5 7 7 . 1 0 8 1 NC B E L S F I R M N o . C - 2 3 7 8 01.18.22 BE X F O R D S U B D I V I S I O N FA S T T R A C K S E W E R A P P L I C A T I O N M A P S P_190419 SHEET #: SHEET 2 0 SCALE 1"=1,000' 2,000'1,000' N PUMP STATION LOCATION FORCEMAIN (IN RED) GRAVITY SEWER (IN GREEN) BLUE HATCH: PHASES 1, 2, AND 6 RED HATCH: PHASES 3 AND 4 YELLOW HATCH: PHASES 5, 7-10 W W W C C C C C T T HH MB W W W WFM FM F M F M F M W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS S S SS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS P: \ 2 0 1 9 P r o j e c t s \ 1 9 0 4 1 9 H i l l t o p ( T e r r a m o r ) \ E N G \ D W G \ E x h i b i t s \ D W R \ P _ 1 9 0 4 1 9 _ D W R _ F T A _ M A P S . d w g PROJECT #: DATE: Ba t e m a n C i v i l S u r v e y C o m p a n y En g i n e e r s S u r v e y o r s P l a n n e r s 25 2 4 R e l i a n c e A v e n u e , A p e x , N o r t h C a r o l i n a 2 7 5 3 9 Ph o n e : 9 1 9 . 5 7 7 . 1 0 8 0 F a x : 9 1 9 . 5 7 7 . 1 0 8 1 NC B E L S F I R M N o . C - 2 3 7 8 01.18.22 BE X F O R D S U B D I V I S I O N FA S T T R A C K S E W E R A P P L I C A T I O N M A P S P_190419 SHEET #: SHEET 2A 0 SCALE 1"=1,000' 2,000'1,000' N PUMP STATION LOCATION FORCEMAIN (IN RED) GRAVITY SEWER (IN GREEN) BLUE HATCH: PHASES 1, 2, AND 6 RED HATCH: PHASES 3 AND 4 YELLOW HATCH: PHASES 5, 7-10 W W W C C C C C T T HH MB W W W WFM FM F M F M F M W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS S S SS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS P: \ 2 0 1 9 P r o j e c t s \ 1 9 0 4 1 9 H i l l t o p ( T e r r a m o r ) \ E N G \ D W G \ E x h i b i t s \ D W R \ P _ 1 9 0 4 1 9 _ D W R _ F T A _ M A P S . d w g PROJECT #: DATE: Ba t e m a n C i v i l S u r v e y C o m p a n y En g i n e e r s S u r v e y o r s P l a n n e r s 25 2 4 R e l i a n c e A v e n u e , A p e x , N o r t h C a r o l i n a 2 7 5 3 9 Ph o n e : 9 1 9 . 5 7 7 . 1 0 8 0 F a x : 9 1 9 . 5 7 7 . 1 0 8 1 NC B E L S F I R M N o . C - 2 3 7 8 01.18.22 BE X F O R D S U B D I V I S I O N FA S T T R A C K S E W E R A P P L I C A T I O N M A P S P_190419 SHEET #: SHEET 2B 0 SCALE 1"=1,000' 2,000'1,000' N PUMP STATION LOCATION FORCEMAIN (IN RED) GRAVITY SEWER (IN GREEN) BLUE HATCH: PHASES 1, 2, AND 6 RED HATCH: PHASES 3 AND 4 YELLOW HATCH: PHASES 5, 7-10 W W W C C C C C T T HH MB W W W WFM FM F M F M F M W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS S S SS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS P: \ 2 0 1 9 P r o j e c t s \ 1 9 0 4 1 9 H i l l t o p ( T e r r a m o r ) \ E N G \ D W G \ E x h i b i t s \ D W R \ P _ 1 9 0 4 1 9 _ D W R _ F T A _ M A P S . d w g PROJECT #: DATE: Ba t e m a n C i v i l S u r v e y C o m p a n y En g i n e e r s S u r v e y o r s P l a n n e r s 25 2 4 R e l i a n c e A v e n u e , A p e x , N o r t h C a r o l i n a 2 7 5 3 9 Ph o n e : 9 1 9 . 5 7 7 . 1 0 8 0 F a x : 9 1 9 . 5 7 7 . 1 0 8 1 NC B E L S F I R M N o . C - 2 3 7 8 01.18.22 BE X F O R D S U B D I V I S I O N FA S T T R A C K S E W E R A P P L I C A T I O N M A P S P_190419 SHEET #: SHEET 2C 0 SCALE 1"=1,000' 2,000'1,000' N PUMP STATION LOCATION FORCEMAIN (IN RED) GRAVITY SEWER (IN GREEN) BLUE HATCH: PHASES 1, 2, AND 6 RED HATCH: PHASES 3 AND 4 YELLOW HATCH: PHASES 5, 7-10 FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM W W W W WWW OH E OH E OH E OH E OH E S D SD SD SD SS SD SD W W S D SD SD SD SDSD SD SD SD WW W SS SS SS SS SS SS SS N/ F : F I S H , J E A N S H A W FI S H , G R A N T J PI N : 0 6 8 7 2 6 0 2 7 2 AC R E A G E : 4 6 . 5 1 A C DB : 1 5 - E , P G . 2 9 2 7 US E : R E S I D E N T I A L ZO N I N G : F V - R A ROLAND'S GRANT SUBDIVISION 65 + 0 0 66+0 0 67+00 68+0 0 69+00 70+00 71+00 72+ 0 0 73+0073+07 15' x 30' BORE PIT 10' x 10' RECEIVING PIT EMELINE WAY CONTRACTOR TO COORDINATE STEEL ENCASEMENT SLEEVE WITH ROLAND'S GRANT IF ROAD IS NOT DEVELOPED DURING FORCEMAIN INSTALLATION, STEEL ENCASEMENT SLEEVE IS NOT NEEDED. 8" PVC FM 8" PVC C-900 WL (PER ROWLAND'S GRANT) 15' x 30' BORE PIT 10' x 10' RECEIVING PIT 8" PVC F M (2) 45° BENDS 22.5° BEND 45° BEND 30' E-E 21' EX. E-E 60' ROW 24' ROW DEDICATION 52' ROW 31' B-B 6' UTILITY ESMT. 50' RIPARIAN BUFFER 50' RIPARIAN BUFFER 20' FVSE 30' PUBLIC UTILITY ESMT. (PER ROWLAND'S GRANT) 10' FVSE 10' 30' PUBLIC UTILITY ESMT. (PER ROWLAND'S GRANT) 20' FVSE (PER ROWLAND'S GRANT) 20' FVSE (PER ROWLAND'S GRANT) 10' FVSE 10' ROLAND'S GRANT WALL ESMT. 30' COMBINED FVSE STORM CBs (PER ROWLAND'S GRANT) FHA (PER ROWLAND'S GRANT) FHA (PER ROWLAND'S GRANT) TEES & GATE VALVES (PER ROWLAND'S GRANT) GATE VALVE (PER ROWLAND'S GRANT) FES (PER ROWLAND'S GRANT) BEND (PER ROWLAND'S GRANT) STORM CBs (PER ROWLAND'S GRANT) STORM CBs (PER ROWLAND'S GRANT) MHs (PER ROWLAND'S GRANT) (2) 45° BENDS FM CONNECTION TO ROLAND'S GRANT SEWER LINE MH 110 FO FO FO FO FO HIL L T O P RO A D MH 109 (PER ROWLAND'S GRANT) MH 108 (PER ROWLAND'S GRANT) 8" PVC (PER ROWLAND'S GRANT) 8" P V C 20' PUBLIC WATER ESMT. (PER ROWLAND'S GRANT) 10' x 10' RECEIVING PIT 15' x 30' BORE PIT AIR RELEASE VALVE (TYP.) 11.25° BEND 250 255 260 265 270 275 280 285 290 250 255 260 265 270 275 280 285 290 63+50 64+00 64+50 65+00 65+50 66+00 66+50 67+00 67+50 68+00 68+50 69+00 69+50 70+00 70+50 71+00 71+50 72+00 72+50 73+00 73+25 EX. GROUND CENTERLINE ROWLAND'S GRANT PROPOSED GROUND CENTERLINE ROLAND'S GRANT MH110 RIM:286.50 INV OUT: 272.75 TO BE UPSIZED TO 5' DIA TIE TO OUTSIDE DROP MANHOLE (SEE DETAIL ON C416) MA N H O L E L I N E D W I T H S P E C T R A S H I E L D JACK & BORE 8" FM INSIDE 16" STEEL CASING 0.5" WALL THICKNESS 8" DIP FM RESTRAINED JOINT THROUGH BORE ROLAND'S GRANT PROPOSED 18" STORM PIPE ROLAND'S GRANT PROPOSED 12" WATERLINE 8" DIP FM RESTRAINED JOINT 8" P V C F M R E S T R A I N E D J O I N T 8" FM INSIDE 16" STEEL CASING 0.5" WALL THICKNESS CONTRACTOR TO COORDINATE STEEL ENCASEMENT SLEEVE WITH ROWLAND'S GRANT IF ROAD IS NOT DEVELOPED DURING FORCEMAIN INSTALLATION, STEEL ENCASEMENT SLEEVE IS NOT NEEDED. ROWLAND'S GRANT PROPOSED ROW 8" DIP FM RESTRAINED JOINT THROUGH BORE JACK & BORE 8" FM INSIDE 16" STEEL CASING 0.5" WALL THICKNESS EX. GROUND CENTERLINE ROWLAND'S GRANT PROPOSED GROUND CENTERLINE 18" MIN. EX. ROW 4' COVER MIN 4' COVER MIN 4' COVER MIN 4' COVER MIN (2) 45° BENDS 22.5° BEND (2) 45° BENDS ROLAND'S GRANT PROPOSED 8" WATERLINE VERTICAL BEND VERTICAL BEND VERTICAL BEND VERTICAL BEND VERTICAL BEND VERTICAL BEND VERTICAL BEND VERTICAL BEND 8" C900 PVC FM RESTRAINED JOINT 8" C900 PVC FM RESTRAINED JOINT 2" GALANIZED VENT REQUIRED (SEE CARRIER PIPE DETAIL ON SHEET C952) 5' COVER MIN TO SUBGRADE UNDER ROAD CROSSINGS 5' COVER MIN TO SUBGRADE UNDER ROAD CROSSINGS VERTICAL BEND VERTICAL BEND 18" MIN. FM UNDER PAVEMENT FM UNDER PAVEMENT 8" C900 PVC FM RESTRAINED JOINT BEGINNING AT STA 64+50 AIR RELEASE VALVE (TYP.) SEE DETAIL ON C416 11.25° BEND FM FM FM FM FM FM FM OHE OHE OHE OHE OHE SD W N/F: FISH, JEAN SHAW FISH, GRANT J PIN: 0687260272 ACREAGE: 46.51 AC DB: 15-E, PG. 2927 USE: RESIDENTIAL ZONING: FV-RA D'S GRANT SUBDIVISION 64+00 65+00 66 + 0 0 FO FO FO FO FO FO C415 FO R C E M A I N P L A N & P R O F I L E PROFILE SCALE 1" = 40' HORIZ. 1" = 4' VERT. N 0 SCALE 1"=40' 80'40' FORCEMAIN- PROFILE VIEW STA. 63+50 TO 74+50 MATCH L I N E T H I S S H E E T PIPE MATERIALS MATERIAL SPECIFICATION BELOW OR AS APPROVED EQUIVALENT. PVC - ELASTOMERIC GASKET, PUSH ON TYPE, IN ACCORDANCE W/ ASTM D3212, SDR 35. C-900 - DR 14 ELASTOMARIC GASKET, PUSH-ON TPE, W/ BEDDING AT A MINIMUM OF 1 FOOT BELOW INVERT AND 1 FOOT ABOVE CROWN OF 78M OR No. 5 STONE. FORCEMAIN C-900 DR18 - DIP - PEW AWWA C150/C151, PUSH ON JOINT, TYPE 2 BEDDING, INTERIOR EPOXY LINING. DIP-RJ - RESTRAINED JOINT DIP PIPE ALL PIPES TO BE FROM APPROVED TOWN OF FUQUAY VARINA VENDOR LIST. MH - ALL MANHOLES TO BE EXTENDED BASE TYPE MANHOLES. - ALL INSIDE/OUTSIDE DROP MANHOLES TO BE LINED WITH SPECTRASHIELD. - MANHOLES ARE NOT TO BE PAINTED. ACRONYMS ROW RIGHT OF WAY OHE OVERHEAD ELECTRIC HORIZ HORIZONTAL VERT VERTICAL STA. STATION EL ELEVATION MPH MILE(S) PER HOUR PT POINT OF TANGENT PC POINT OF CURVE PI POINT OF INTERSECTION PVI POINT OF VERTICAL INTERSECTION K RATE OF VERTICAL CURVE LVC LENGTH OF VERTICAL CURVE ABBREVIATION LEGEND: CS CONCRETE SIDEWALK (TYP.) EME ENTRY MONUMENT EASEMENT (TYP.) PSE PRIVATE STORM EASEMENT (TYP.) SDT SIGHT DISTANCE TRIANGLE (TYP.) STE STREET TREE EASEMENT (TYP.) TYPE 'B' PB PERIMETER BUFFER TYPE 'C' TB THOROUGHFARE BUFFER UE UTILITY EASEMENT (TYP.) UTILITY LEGEND: AIR RELEASE VALVE (ARV) BLOW-OFF (BO) CABLE LINE CLEAN OUT (CO) FIBER OPTIC LINE FIRE HYDRANT ASSEMBLY (FHA) FORCE MAIN GATE VALVE (GV) GRINDER PUMP SEWER LINE WATER LINE WATER METER (WM) FM SS EX. SEWER LINE EX. WATER LINEW SS W FO C GENERAL NOTES: 1.THE FORCE MAIN MUST BE LAID WITH CONSTANT GRADE UP TO CLOSEST AIR RELEASE VALVE (ARV). FORCEMAIN- PLAN VIEW STA. 65+50 TO 74+50 FORCEMAIN- PLAN VIEW STA. 63+50 TO 65+50 MA T C H L I N E T H I S S H E E T M A T C H L I N E C 4 1 4 N 0 SCALE 1"=40' 80'40' Designed By: Scale: Project #: SHEET p: \ 2 0 1 9 p r o j e c t s \ 1 9 0 4 1 9 h i l l t o p ( t e r r a m o r ) \ E N G \ D W G \ S h e e t s \ 3 - c d a m e n d m e n t \ P 1 9 0 4 1 9 _ C 4 1 5 _ O N L Y . d w g Date: Bat e m a n C i v i l S u r v e y C o m p a n y En g i n e e r s S u r v e y o r s P l a n n e r s 25 2 4 R e l i a n c e A v e n u e , A p e x , N o r t h C a r o l i n a 2 7 5 3 9 Ph o n e : 9 1 9 . 5 7 7 . 1 0 8 0 F a x : 9 1 9 . 5 7 7 . 1 0 8 1 NC B E L S F I R M N o . C - 2 3 7 8 12.xx.22 BE X F O R D - O P E N S P A C E S U B D I V I S I O N CD A M E N D M E N T P190419 64 9 0 H I L L T O P R O A D FU Q U A Y V A R I N A , N C WA K E C O U N T Y AS SHOWN SSL DOT REVISION SERVICES REVISION TOWN OF FUQUAY COMMENTS TOWN OF FUQUAY COMMENTS 01.03.24 12.21.23 11.14.23 10.11.23 4 3 2 1 DESCRIPTIONDATEREV # FORCEMAIN DESIGN ONLY. ENGINEERING DESIGN FOR FORCEMAIN ONLY. INFORMATION FOR THE ROLAND'S GRANT SUBDIVISION HAS BEEN PROVIDED BY OTHERS. ENGINEER HAS NOT VERIFIED THE ACCURACY OR COMPLETENESS OF THE DATA BY OTHERS AND SHALL NOT BE RESPONSIBLE FOR ANY ERRORS OR OMISSIONS WHICH MAY BE INCORPORATED HEREIN AS A RESULT. PLANS FOR ROLAND'S GRANT PROVIDED BY THE NAU COMPANY. CONTRACTOR TO CONFIRM INFORMATION BEFORE CONSTRUCTION. UTILITY NOTES: 1. RECORD DRAWINGS MUST BE SIGNED, AND SEALED BY BOTH A LICENSED NC PE AND A NC PLS. THEY SHALL INCLUDE BOTH HORIZONTAL AND VERTICAL AS-BUILT LOCATION INFORMATION FOR ALL WATER, SEWER, STORMWATER, AND OTHER UTILITIES, INCLUDING UNDERGROUND ELEVATIONS AND INVERTS. DATA MUST BE SURVEY GRADE ACCURACY BASED ON THE CURRENT STATE PLANE COORDINATE SYSTEM. 2.MINIMUM HORIZONTAL SEPARATIONS BETWEEN WATER AND SANITARY SEWER, WATER, AND STORM SEWER, AND BETWEEN SANITARY SEWER AND STORM DRAINAGE. 2.1.WATER AND SANITARY SYSTEM PIPING SHALL HAVE A MINIMUM HORIZONTAL SPACING OF 10 FEET. 2.2.WATER SYSTEM PIPING AND STORMWATER SYSTEM PIPING AND STRUCTURES SHALL HAVE A MINIMUM HORIZONTAL SEPARATION DISTANCE OF 5 FEET. 2.3.WASTEWATER SYSTEM PIPING AND STORMWATER SYSTEM PIPING SHALL HAVE A MINIMUM HORIZONTAL SEPARATION DISTANCE OF 5 FEET. 2.4.ALL PIPELINES NOT PREVIOUSLY LISTED INCLUDING SERVICE LINES SHALL HAVE A MINIMUM HORIZONTAL SEPARATION DISTANCE OF 5 FEET. NOT A CERTIFIED DOCUMENT AS TO THE ORIGINAL DOCUMENT BUT AS TO REVISION 2 ONLY - THIS DOCUMENT ORIGINALLY ISSUED AND SEALED BY THOMAS S. SPEIGHT, (20234) ON 4/20/2023. THIS DOCUMENT IS ONLY CERTIFIED AS TO THE REVISIONS. 4