HomeMy WebLinkAboutNCC240699_ESC Approval Submitted_20240313 ROY COOPER a Governor 544 .:1‘1) ELIZABETH BISER x Secretary i5 WILLIAM E.TOBY VINSON,JR. Interim Director NORTH CAROLINA Environmental Quality February 28,2024 LETTER OF APPROVAL WITH MODIFICATIONS Clayton of Properties Group, Inc. (DBA Shugart Homes, Inc.) Attention: Chandler Turpin, Land Development Manager 221 Jonestown Road Winstons-Salem,NC 27104 RE: Project Name: Brayden at Bermuda Run, Phase 2B Project ID: DAVIE-2024-016 County: Davie Acres Approved: 14.75 Acres City: Bermuda Run Address: Morning Star Drive River Basin: Yadkin Pee-Dee Stream Classification: WS-IV Submitted By: Stoltzfus Engineering,Inc. Date Received by LQS: February 27, 2024 Plan Type: Revised Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. __ As of April 1, 2019, all new construction activities are.required.to complete and submit an_electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI foul.' may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI foiui to the Stoiiiiwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG010000 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 336-776-9800 Letter of Approval with Modifications Clayton of Properties Group,Inc. (DBA Shugart Homes, Inc.) February 28, 2024 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Brayden at Bermuda Run, Phase 2B Project ID: DAVIE-2024-016 County: Davie Plan Reviewed By: Jack Lawry-Popelka Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to speak with the Land Quality inspector for your county. Permission must be obtah d and granted.from NC DEQ DEMLR prior to the removal of any ESC measures. [GS 113A-51, 15A NCAC 4B .0120] 2. Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] 3. Additionalmeasures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 4. The NCGO1 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins; requires prior approval. Often,--a full growing - season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] 5. Please ensure the crest, toe and abutment contacts are not altered or degraded by grading or erosive water. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities 1 r0, Cd W - H W _ °® ® su= 7, ! = t CI ® en2,1 • Q 0 El °Po g „,"' - n ®® 4 4 = i . 7,5 t El, — ,e 4 g, It..;,_ 0 .,- -. TCi ° ' I ,,t 4. i.,,k, \V.. 1404-rAra---, ‘"Ala 0 `b % � ) h°� -a.> ;..i tin ,i= ,, P- ta p tu Q �' ® ` ..° = b eA �ao .4 = ea 41) = N \'-- g -,,t