Project Name: Gillespie - B1.9 Solar Utility Station
Project Location: 3858 Gillespie Street, Fayetteville, NC 28306
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired,or replaced immediately. These deficiencies can
affect the integrity of structures,safety of the public,and the pollutant removal efficiency of the SCM(s).
The SCM(s)on this project include(check all that apply&corresponding O&M sheets will be added automatically):
Infiltration Basin Quantity: 0 Location(s):
Infiltration Trench Quantity: 0 Location(s):
Bioretention Cell Quantity: 0 Location(s):
Wet Pond Quantity: 0 Location(s):
Stormwater Wetland Quantity: 0 Location(s):
Permeable Pavement Quantity: 0 Location(s):
Sand Filter Quantity: 0 Location(s):
Rainwater Harvesting Quantity: 0 Location(s):
Green Roof Quantity: 0 Location(s):
Level Spreader-Filter Strip Quantity: 0 Location(s):
Proprietary System Quantity: 0 Location(s):
Treatment Swale Quantity: 0 Location(s):
Dry Pond Quantity: 0 Location(s):
Disconnected Impervious Surface Present: Yes Location(s): In between panel rows and along drive
User Defined SCM Present: No Location(s):
Low Density Present: No Type:
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each SCM above,and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to
the system or responsible party.
Responsible Party: David Deschamps
Title&Organization: Fayetteville Public Works Commission
Street address: 955 Old Wilmington Road
City,state,zip: Fayetteville,NC 28301
Phone number(s): 252-230-4781
Email: david.deschamps@faypwc.com
Signature: ,1 Date:
£Z/k.LiJ ( wI £cj s ,a Notary Public for the State/off }�C V L Lea it(.a 14CL
County of LU.mb el'(a IAA ,do hereby certify that /.�i1 Ott/ ( P;
personally appeared before me this 25)6 L- day of ,Se fi.►►1 l:1 .2 6, 3 and
acknowledge the due execution of the Operations and Maintenance Agreement.
Witness my hand and official seal, ( L�AJ ' O�,A l .
.„„wi,,„„
\\‘‘ Bo ////
w . OTAgy
U
'UB1.�G .�
%$/j/04ANp G`\\��p���\���~\ My commission expires /0idf/ ()�I
/// t
STORM-EZ 9/5/2023
Version 1.5 O&M Agreement Page 1 of 1
Disconnected Impervious Area Maintenance Requirements
Important operation and maintenance procedures:
The roof area will be maintained to reduce the debris and sediment load to the system. Excess debris
- can clog the system and lead to bypass of the design storm, reducing infiltration and pollutant
removal.
To ensure proper operation as designed,a licensed Professional Engineer,Landscape Architect,or
- other qualified professional will inspect the system annually.
- The system components will be repaired or replaced whenever they fail to function properly.
After the DIS is constructed, it shall be inspected quarterly. Records of operation and maintenance shall be kept in a
known set location and shall be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element: Potential problem: How to remediate the problem:
The contributing Excess debris or sediment
is present on the rooftop or Remove the debris or sediment as soon as possible.
impervious area impervious surface.
Gutters are clogged or Unclog and remove the debris. May need to install gutter
water is backing up out of screens to prevent future clogging.
the gutter system.
The gutter system(if
applicable) Rooftop runoff is not Correct the positioning or installation of the gutters. Replace if
flowing into gutter system. necessary to capture the roof runoff.
Rooftop runoff is causing Install or repair splash blocks as needed.
erosion at outlet.
Runoff flows to the Remove any sediment or obstructions at the pavement-vegetated
pervious area as area interface.
concentrated flow.
Roadways&parking lots The aggregate transition
(if applicable) area or concrete edge
restraint is cracked, Repair or replace the transition area or concrete edge restraint.
settled, undercut,eroded
or otherwise damaged.
Areas of bare soil and/or Regrade the soil if necessary to remove the gully, re-seed the
erosive gullies have vegetated receiving area and water until it is established.
formed. Provide lime and a one-time fertilizer application.
The vegetated receiving
area Trees or shrubs have Remove the trees or shrubs.
begun to grow.
Vegetation is too short or Maintain vegetation at a height of approximately three to four
too long. inches.