HomeMy WebLinkAboutNCG030541 DMR SW (4)Semi-annual Stormwater Dischme Monitorine Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted /// 61 "/S
CERTIFICATE OF COVERAGE NO. NCG030541 SAMPLE COLLECTION YEAR _2014
FACILITY NAME Cree-RTP Facility SAMPLE PERIOD ❑ Jan -June ® July -Dec
COUNTY Durham or ❑ Monthly' (month)
PERSON COLLECTING SAMPLES K. Bucher, D. O'Connor DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY _Meritech, Inc._ Lab Cert. q 165 ❑Zero -flow ❑Water supply [:]SA
Comments on sample collection or analysis: ®Other_C NSW
Part A: Stormwater Benchmarks and Monitoring Results
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
F-1 Nn rlicrhnrnn thic n in 4J2
Outfall No.
Date Sample
Collected'
24-hour all
amount,
Inches' '
Total Suspended Solids
p H,
Standard
units
Copper
Lead
Zinc
Non -Polar
O&G/ Total
petroleum
Hydrocarbons
Total
Toxic
Organics'
Benchmarks =_>
-
100 mg/L or 50 mg/L
6.0-9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
001
12/16/14
0.38
16 mg/L
7.9
0.015 mg/L
<0.030 mg/L
0.087 mg/L
<5 mg/L
---
002
12/16/14
0.38
37 mg/L
7.8
0.006 mg/L
<0.010 mg/L
0.023 mg/L
<5 mg/L
--
004
12/16/14
0.38
18 mg/L
7.7
0.010 mg/L
<0.010 mg/L
0.248 mg/L
<5 mg/L
---
005
12/16/14
0.38
32 mg/L
7.8
0.016 mg/L
<0.010 mg/L
0.103 mg/L
<5 mg/L
-----
003
12/16/14
0.38
No Flow
—_
M
UMMY sdrnpung tmsteaa Or semi-annuaq must Degm witn the second consecutive benchmark exceedance for the same parameter at the same outfall.
' For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
"See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
ame (Print name)
Title (Print title) —�
Zrricalfor(mat.
g ature) (Da e)
Note: Results must be reported in nu Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format. "<XX ma/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
F-1 Nn rlicrhnrnv fhic nnrinri J2
Outfall No. Date Sample 24-hour rainfall
Collected' amount, Non -polar O&G/TPH by Total Suspended Solids pH
(mo/dd/yr) Inches EPA 1664 (SGT -HEM)
Benchmarks ===> - - 15 mg/L 100 mg/L or 50 mg/L• 6.0 – 9.0 SU
Footnotes from Part A also apply to this Part B
• See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ®NO ❑
REGIONAL OFFICE CONTACT NAME: Mr. David Parnell
Mail an original and one copy of this DMR, including all No Discharge" reports within 30 days of receipt of the lab results for at end of monitorina period
in the case of "No Discharge" reports/ to:
Division of Water Quality
Attn: DWQCentral Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
N certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Sign t re o Permittee) ( rate)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3