Loading...
HomeMy WebLinkAboutWI0800138_Site Plans/Maps_20081015 (3)FIGURES R W+F 8 0 500 1,000 2,000 3.000 4.000 Feat 6 / Camp Geiger DV Ag'S LREEK Lu r1-' •co . ' 6. iS pgV155"iHEET y r :r;. �. 4,,,,,L--�' Shaw -Shaw Environmental, Inc. FIGURE 1.1 SITE VICINITY MAP REMEDIAL ACTION BASIS OF DESIGN OPERABLE UNIT NO. 16 - SITE 93 MCB CAMP LEJEUNE, JACKSONVILLE, NC rcaaa 7C849 TC852 TC853 T 8. 4 TREATMENT STC963 AREA , I i ' TC OgOT 1 9; i LIT 90 0 TCt04a 5 PIT 10 1 TC1049 �; TC 1.U51 xi ' I IT 10 2 F9 TC1055 W'� T 10 OT YO 2 1 I i." TC�l1 52 i b39 TC1056 ? SIo j t 71 jT 10 4 TC1057 TCH53 I T 10 5 TC1058 T 10 1T 1 63 i I TCL��1 54 ELEVENTH STREET _ 1 T 11 0 I T 11 1 TC1143 \ 0 0�. 0 100 200 400 Feet = surface_Water_body_area = demolished —structures —area = build i ngs_gene ra I —area =1 road area = vehicle—parking_area \ N TC864 W E b S Tom° '5 TC861 TC852 I ,` �I t EDWARDS VfO 10 1 /I 1�r A 1 7 A$101 q'510 !�J A 10 5 � { I A 10 1 r t 10 A 10 7 ,% � AS11C SaW''Shaw Environmental, Inc. FIGURE 1-2 SITE LOCATION MAP REMEDIAL ACTION BASIS OF DESIGN OPERABLE UNIT NO. 16 - SITE 93 MCB CAMP LEJEUNE, JACKSONVILLE, NC P 3 a Ja w 0 z 0 a� z 0 F w zz z z 5 a tt 3 z U z 16, am 10, 3.25" 101M163 SLIP CAP SCHEDULE 401.25-INCH DIAMETER FLUSH THREADED PVC CASING PORTLAND CEMENT W/ 5% HIGH YIELD BENTONITE HIGH SOLIDS BENTONITE GOLD TYPE FILTER PACK (20/40 CLEAN FILTER SAND) 1.25-INCH ID CONTINUOUS WRAPPED WELL SCREEN (0.020-INCH SLOT) M 0. 3-2 N co co N fV t- qdd ui uoi;Taa;ueouoC) 1 C� 00 C O 1 Q LL C) 1 o '~ zC:, 0 ao ti O 1 0 c a� �Q 0 Q a 1 .,�r, UC:) ti 0 1 C U O N O 1 O CO z O S0 O U I u U io cc O 0 0 0 0 0 0 0 0 0 0 0 o rn oo ti to LO It co cq r r- qdd ui uoj;ej4ueauoC) co 0 �CO w Q U- Q r�— W Q cn O O M 05 0 0 O Z o c`o 00 � d �CO m o U- co 0 c c2) U fll O 0 O Q Z ti O U 0 E CL (D d U) O Q a Em CO ti 2 O E Q7 O LL r— O U (o Q O > Co O p Z O d Co O O O LO O LO O CV CV r qdd ui uot;va;ueouoo ti a 75 a ti 0 m O d ►l ti 0 L C� C 1.� W ti a co 0 U O (D O O z CD O U r' O O O Q O O a O O O a O OD CD IT N O 00 CD d N N qdd ui uoi;ea;ueouoo APPENDIX A - COST SUMMARY APPENDIX A -Cost Comparison Potassium Permanganate Injection Site 93, MCB Camp Lejeune, NC FS Cost Estimate Actual Construction Capital Costs Quantity Unit Unit Cost Cost Cost Site Prep and Initial Survey 1 LS $7,500 $7,500 $20,000 Work Plan and submittals 1 LS $12,000 $12,000 $16,720 Injection Point Installation $85,400 Materials: Potassium Permanganate, 92,000 lbs. 92000 Ibs $2 $184,000 $91,200 Material Shipping 1 LS $5,000 $5,000 $8,200 Material Storage 55 days $250 $13,750 Injection Labor, Equipment, Per diems 1 LS $241,397 $241,397 Subcontractor Injection Summary Report 1 LS $7,500 $7,500 $15,000 Site Restoration 1 LS $7,500 $7,500 $18,100 Injection Labor and per diems 10 Mo $247,100 Mixing Equipment Rental 10 Mo $123,000 De -watering Equipment Rental 7 Mo $49,000 Initial and Interim Water Quality Analysis $28,200 Sub - Total $478,647 $701,920 Construction Costs $185,000 Project Management 8% $38,292 Remedial Design 5% $23,932 Construction Management and Procurement 15% $71,797 G & A 8% $38,292 Profit 10% $47,865 Contingency 15% $71,797 Sub -total $291,975 $185,000 Total $770,622 $886,920 APPENDIX B - ANALYTICAL DATA REPORTS