Loading...
HomeMy WebLinkAbout19980623 Ver 4_More Info Requested_20240312Baker, Caroline D From: Homewood, Sue Sent: Tuesday, March 12, 2024 1:09 PM To: Thomas Brown Cc: Jay Nivens; Jennifer.L.Lawrence@usace.army.mil Subject: Request for Additional Information for Modification Request, Martin Marietta Hickory Quarry - Catawba County - SAW-2011-01934 - DWR19980623 v4 Hi Thomas, Please provide an engineered design detail, profile and cross section of the proposed culvert. Also, the drawing shown says the impact is +/- 70 feet. We will need more exact length of stream proposed to be impacted. Please note that the application will be considered "on hold" until receipt of the above requested information Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Thomas Brown <Thomas.Brown@martinmarietta.com> Sent: Tuesday, February 20, 2024 1:53 PM To: Jennifer. L.Lawrence@usace.army.mi1; CharlotteNCREGI@usace.army.mil Cc: Homewood, Sue <sue.homewood@deq.nc.gov>; Jay Nivens <Jay.Nivens@martinmarietta.com> Subject: [External] Modification Request, Martin Marietta Hickory Quarry, SAW-2011-01934 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Jennifer, Martin Marietta would like to request a modification to our existing permit, SAW2011-01934, at Hickory Quarry (See attached). The proposed modification would impact approximately 70 linear feet of stream, associated with the expansion of an existing stream crossing. As shown on the attached site plan dated 2-19-2024, we are planning to add a Fines Recovery System in the area highlighted as "Future Processing Area". This area is currently used for storage of overburden. The new process area will be constructed on top of the stored overburden. The existing road associated with a sewer line was substantial enough to temporarily haul overburden across the stream but will not be wide enough to safely transport material to be processed. The plans dated 8-30-2023 show a more detailed view of where the culvert would be extended. We are currently working on a proposed mitigation plan, but I wanted to go ahead and get this to you. Please feel free to give me a call or email me if you have any questions. Sue, I will be submitting an online application for modification of a project with an existing ID in just a few minutes. Thank you, Thomas Brown, PWS Wetland Specialist I East Division Martin Marietta 2235 Gateway Access Point STE 400, Raleigh, NC 27607 m. (919) 268- 5297 e. thomas.brown@martinmarietta.com www.martinmarietta.com