Loading...
HomeMy WebLinkAbout20081143 Ver 1_Inspection_20151109Wetland Inspection Report Project Num: 20081143 Version: 1 Project Name: Cripple Creek Stream & Wetlanc County: Alamance Location: Cripple Creek Stream & Wetland Mitigation Bank Latitude: +36° 08' SW Plan Location Site Owner Name Turner, M Randall. Inspection Date: 11/9/2015 Reason for Inspection Routine Inspection Type: Site Inspection (non -DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Sue L Homewood Secondary Inspector(s): Facility Compliance Status: 0 Compliant Program Areas: 401 (includes isolated /non -404) Question Areas: 0 Permit (401 WQC) Inspection Summary: Title: ❑ Not Compliant Status: Issued Project Type: Mitigation bank Region: Winston -Salem Longitude: -79° 23'03" Phone: Phone: 336- 776 -9694 page: 1 Site Number: 20081143 Owner: Turner, M Randall Inspection Date: 11/9/2015 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and /or filled areas installed properly? ❑ ❑ 0 ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ ❑ ❑ Comment: Year 5 site visit for credit release purposes. Site doing well, bankfull conditions during site visit. Site meeting success criteria. A few areas of monoculture shrubs and weak tree success (supplemental planting was done previously). USACE will consider suspending wetland hydrology monitoring but retain year 7 veq monitoring requirement. Will determine credits to be held until year 7. page: 2