Loading...
HomeMy WebLinkAboutSW6230803_Email_20240311 Peck, Kaitlin From:Farkas, Jim J Sent:Monday, March 11, 2024 4:12 PM To:joe.conlan@mattamycorp.com; jddfarms@gmail.com Cc:Joyner, Melissa; Adam Freeman; svc_post_construction_stormwater; Sikes, Jay; Brad Sutton; Hines, Lee R Subject:RE: SW6230803; Bloom (formerly Dove) Subdivision - North Attachments:Cover Letter & Permit 3-11-24.pdf Good Afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR), received a complete Stormwater Management Permit Application for the subject project on December 12, 2023. Sta? review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 - 1062 rules. We are forwarding Permit No. SW6230803, dated March 11, 2024, for the construction, operation and maintenance of the subject project and the stormwater system. This permit shall be e?ective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, Joseph P. Conlan, at the following address (NOTE: An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Mattamy Homes, LLC Attn: Joseph P. Conlan, Vice President of Land Development – Raleigh Division 11000 Regency Parkway, Suite 110 Cary, NC 27518 An original signed hard copy of the cover letter and permit (attached) is also being sent to the current property owner, Claudia E. Dove & Deborah D. Smith at the following address: Claudia E. Dove & Deborah D. Smith 7412 Harps Mill Road Raleigh, NC 27615 We will hold onto our hard copy of this project for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made) after which point, it will be kept on file at the Fayetteville Regional O?ice. If you have any questions, or need additional information concerning this matter, please contact us at postconstruction@deq.nc.gov. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality O?ice: (919) 707-3646 Jim.farkas@deq.nc.gov 1 From: Farkas, Jim J Sent: Thursday, November 9, 2023 3:40 PM To: Adam Freeman <AFreeman@mckimcreed.com> Cc: Joyner, Melissa <melissa.joyner@deq.nc.gov>; svc_post_construction_stormwater <postconstruction@deq.nc.gov> Subject: RE: SW6230803; Dove Subdivision (Harnett) Good A?ernoon, The Division of Energy, Mineral and Land Resources (DEMLR), received addi?onal informa?on for a Stormwater Management Permit Applica?on for the subject project on August 16, 2023. A review of that informa?on has determined that the applica?on is not complete. A?ached is a le?er describing the items that need to be submi?ed. If you have any ques?ons, please feel free to contact me. My contact informa?on is listed below. Thanks, Jim Farkas Post-Construc?on Stormwater Permi?ng Group North Carolina Department of Environmental Quality postconstruc?on@deq.nc.gov From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Wednesday, August 16, 2023 9:02 AM To: Adam Freeman <AFreeman@mckimcreed.com> Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: SW6230803; Dove Subdivision (Harnett) Good Morning, 2 We received your post-construc?on stormwater permit applica?on for the subject project 8/16/2023. Reviews under the Standard permi?ng process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. h?ps://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Addi?onal file types can be entered into the electronic form by clicking on the “Add Another Post-Construc?on File Upload” link directly below the “State Stormwater Informa?on Uploads” sec?on of the form. YOU MUST CLICK ON THE “ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD” TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding addi?onal file uploads) will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload en?re plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selec?ng the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE: We do not require and we discourage the upload/submission of extraneous plan sheets (such as ligh?ng plans, u?lity plans, striping plans, sight distance plans, etc…) as these files are not needed for review. Please type in permit #: SW6230803 This project will be reviewed by Jim Farkas, if you have any ques?ons, please contact them at jim.farkas@deq.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Peck, Kaitlin Sent: Friday, August 11, 2023 11:38 AM To: Adam Freeman <AFreeman@mckimcreed.com> Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: RE: \[External\] RE: Dove Subdivision; Fuquay-Varina, Harnett 3 Yes! I just need the revised pages. I can add these to your exis?ng set of plans. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov From: Adam Freeman <AFreeman@mckimcreed.com> Sent: Friday, August 11, 2023 11:36 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: \[External\] RE: Dove Subdivision; Fuquay-Varina, Harnett CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. I'm using Mimecast to share large files with you. Please see the attached instructions. Good morning Kaitlin, I will send out hard copies today, but wanted to respond to this email PDF copies. Can you verify that you only need the revised plan sheet(s), not full sets? Regarding the comments on the plans, the boundary is delineated with line and curve labels on sheets C2.0 and C2.1 and curve tables on C2.0. I’ve added the following details to sheet C11.0: permanent lined trapezoidal swale, NCDOT Method of Pipe Installa?on, and NCDOT Driveway Pipe Construc?on. The road cross sec?on was already shown on C11.0 and informa?on on the drainage pipes is shown on C7.0. Have a great weekend. Thanks, Adam. Adam Freeman, P.E. | Senior Project Engineer McKim & Creed, Inc. T 919.233.8091 From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Wednesday, August 9, 2023 1:51 PM To: Adam Freeman <AFreeman@mckimcreed.com> 4 Cc: Farkas, Jim J <Jim.Farkas@deq.nc.gov>; Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: Dove Subdivision; Fuquay-Varina, Harnett Good A?ernoon, We received your application for a new post-construction stormwater permit on 8/4/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 9/8/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application):  Section IV, 10 – Please show the total drainage area, on-site drainage area, on-site buildings/lots, on-site streets, on-site parking, on-site sidewalks, and total impervious surface area in square feet instead of acres.  1x hard copy of the complete, original Supplement-EZ Form (This item is required per Sections V & VI, 3 of the Application). This form can be found on our website at the following address: https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page.  1x original, signed & notarized hard copy of the O&M Agreement Form (This item is required per 15A NCAC 02H .1042(2)(j) and per Sections V & VI, 3 of the Application). This form can be found on our website at the following address: https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete O&M Agreement Form will have 2 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. NOTE: It is recommended to get a second copy of this form signed & notarized for the Applicant’s records (it will be helpful when they go to record it with the Register of Deeds).  1x hard copy of a soils report/map. This item is required per Section VI, 9 of the Application and Infiltration MDCs 1 & 2.  2x signed & sealed hard copies of a plan sheet showing the following corrected additions:  Project boundary delineation labeled with accurate bearings and distances (Required per Section VI, 8i of the Application and 15A NCAC 02H .1042(2)(g)(ii)).  Details of roads, sidewalks, drainage features, piped collection systems, and the proposed stormwater controls (swales). This item is required per Section VI 8l of the application. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). 5 Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1636 If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deq.nc.gov or at (919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.peck@deq.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Disclaimer This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the system manager. Please note that any views or opinions 6 presented in this e-mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e-mail. 7