Loading...
HomeMy WebLinkAboutSW4231202_Plansheet - SCM Detail_20240311 (3) 12"(30cm) CHANNEL . 4"(10cm) INSTALLATION l _ DETAIL ._ (15cm) _ _ \�\ �111 (15cm) 4"(lOCm) 1 . Prepare soil before installing rolled erosion control products (RECPs), ;y - including any necessary application of •.� �'� ■ ■ lime, fertilizer, and seed. ,,. u 0 2. Begin at the top of the channel by anchoring the RECPs in a 6"(15cm) 611 deep X 6 (15cm) wide trench with (15cm) approximately 12"(30cm) of RECPs 2"-5" extended beyond the up-slope portion I ' ' of the trench. Use ShoreMax mat at the " f (5-12.5cm) channel/culvert outlet as supplemental scour protection as needed. Anchor the TEMPORARY TEMPORARY \\\W W W RECPs with a row of staples/stakesSlope Channel 4"-6" W W W W W \\ W W W W W W W approximately 12"(30cm) apart in the Product "Description Typical Slope Channel ' " Longevity Applications Application 10-15cm W W `\, , � �\\ W W W WW = bottom of the trench. Backfill andThresholds Description Thresholds ( ) W W WW W , 0 \ W W W compact the trench after stapling. Apply Accelerated Woven seed to the compacted soil and fold the photodegradable, biodegradable =__ �� v polypropylene top 45 days 4:1-3:1 1.55 psf/5.0 fps jute top and 36 mo. 1:1 and Greater 2.35 psf/10.0 e- \ W W © remaining 12 (30cm) portion of RECPs net,100%straw bottom net,100% fps fiber matrix coconut fiber back over the seed and compacted soil. os/5 C125BN matrix W W W Secure RECPs over compacted soil Accelerated hotode radable, 700 g woven W W W with a row of staples/stakes les/stakes spaced p g biodegradable W ? \ p p x. polypropylene g �� 60 days 3:1-2:1 1.75 psf/6.0 fps coirtop net, approximately 12 apart across the top r=bottom net, 2.35 psf/10.0 �- coconut fiber 36+mo. 1:1 and Greater W W W W width of the RECPs. 100%straw fiber fps matrix,woven DS150 matrix biodegrdablejute 3. Roll center RECPs in direction of water C70OBN bottom net WW flow in bottom of channel. RECPs will Photodegradable, PERMANENT ^^^r- \\� W W W W unroll with appropriate side against the polypropylene top 12 months 4:1-3:1 1.sSpsf/S.Ofps net,l00%straw ERONET soil surface. All RECPs must be fiber matrix securely fastened to soil surface by s75 \\ W Ail UV-stable Unvegetated placing staples/stakes in appropriate Photodegradable, polypropylene 3.0 psf/9.0 fps _ locations as shown in the staple pattern polypropylene (PP)top and Permanent 1:1 top bottom net, 12 months 3:1-2:1 1.75 psf p p bottom net,100% Vegetated /6.0 fps pp fiber matrix 10 psf/16.0 fps guide. 100%strawfiber P300 _ 4. Place consecutive RECPs end-over-end matrix ' -_III-- III-_ � s,5o 6„ II =III =III- �I (Shingle style) with a 4"-6" overlap. Use UV-stable vMAx a double row of staples staggered 4" polypropylene (15cm) = = // / p gg lb- top net,70/° UV-stable PP top III=// / apart and 4" on center to secure straw/30% &bottom nets, Unvegetated RECPs. coconut 24 months 2:1-1:1 2.0 psf/8.0 fps UV stable PP 2.3 psf/8.5 fps fiber matrix, crimped center Permanent 1:1 and Greater Vegetated hotode radable net,® 5. Full length edge of RECPs at top of side p g 8 psf/18fps polypropylene fiber matrix slopes must be anchored with a row of SC150 bottom net S200 staples/stakes approximately 12"(30cm) UV-stable PP „ „ UV stable top&bottom apart in a 6 (15cm) deep X 6 (15cm) polypropylene top nets,UV-stable Unvegetated 2.25 psf/10.0 &bottom nets, 36 months 1:1 and Greater PP crim ed 3.0 psf/9.5 fps CRITICAL POINTS wide trench. Backfill and compact the 100%coconut fps p ° Permanent 1:1andGreater NOTES: fiber matrix center net,70/o g trench after stapling. straw/30/o Vegetated A. Overlaps and Seams * p g C125 coconut fiber 10psf/15.Ofps p Horizontal staple spacing should be 6. Adjacent RECPs must be overlapped SC25o matrix B. Projected Water Line altered if necessary to allow staples to approximately 2"-5" (5-12.5cm) BIONET UV-stable PP C. Channel Bottom/Side Slope Vertices secure the critical points along the channel (Depending on RECPs type) and Leno woven top&bottom Unvegetated stapled. nets,UV-stable 3.2 sf 10.Sf s biodegradable P / P A su rface. p jute top net, 12 months 4:1-3:1 1.6 psf/5.0 fps PP crimped Permanent 1:1 and Greater 7. In high flow channel applications a 100%straw fiber center net,100% Vegetated matrix coconut fiber 12 psf/20 fps B C C **In loose soil conditions, the use of staple to 40 foot (9 -12m) intervals. Use a or stake lengths greater than 6"(15cm) may double row of staples staggered Woven UV-stable PP top p gg biodegradable Er bottom nets, Unvegetated be necessary to properly secure the 4"(10cm) apart and 4"(1 0cm) on center jute top and 12 months 3:1 2:1 1.85 psf/6.0 fps UV-stable PP 4.0 psf/12.5 fps RECPs. over entire width of the channel. bottom net,,00°'° crimped center Permanent 1:1 and Greater Drawing Not To Scale straw fiber matrix net,100%PP fiber Vegetated g 8. The terminal end of the RECPs must be s,SOBN matrix 14psf/25fps P550 anchored with a row of staples/stakes Woven biodegradable Vegetated NORTH Disclaimer: approximately 12" (30cm) apart in a 100/°UV-stable jute top and ° 6"(15cm) deep X 6"(15cm) wide trench. TMax:16 psf / AMERICAN The information presented herein is general design information only. For specific applications 70ttomnet, 18months 2:1 1:1 2.10psf/8.Ofps PIP� 70%straw/30% Permanent 1:1 and Greater 25 fps Backfill and compact the trench after coconut fiber a3-D woven GREENS consult an independent professional for further design guidance. a3 DstruEture TMax20fp2psf/ Stapling. SC150BN matrix TMAX31< 20 fps 3 5401 St. Wendel - Cynthiana Rd. PH: 800-722-2040 Poseyville, IN 47633 www.nagreen.com Drawn on: 5-4-17 32' 750.00 Ln 100-YR ELEVATION = 748.89 �� OXI 17 c� DEPTH = 0.39' DEPTH = 0.12' TOP OF TURF: 748.50 20' WEIR SECTION 20 PROJECT TITLE: GRASS LINED EMERGENCY SPILLWAY EXIT SECTION THE TOWNES AT BERMUDA RUN W/ NORTH AMERICAN GREEN P550 GRASS LINED EMERGENCY SPILLWAY PHASE 1 TURF REINFORCEMENT MATTING C DAVIE COUNTY FARMINGTON TOWNSHIP 4: 1 SIDE SLOPES DISCHARGE = 15.9 9 C W/ NORTH AMERICAN GREEN P550 BERMUDA RUN,NORTH CAROLINA (OR APPROVED EQUAL) TURF REINFORCEMENT MATTING OWNER/DEVELOPER: LC BOTTOM WIDTH = 20' 4: 1 SIDE SLOPES (OR APPROVED EQUAL) 249DE REALTY, Y 249 DEARDOM WAY FLOW DEPTH = 0. 3 9' 3 3. 3 3% SLOPE CHAPEL HILL-97 NC 27516 336-7079799 DISCHARGE = 15.99 CFS BOTTOM WIDTH = 20' CARo•• +� �a]C71s ��� FESSj VELOCITY OVER WEIR LIP = 1 .90 FT/SEC n = 0. 030 + ngineering, Inc • sA •• FREEBOARD AND SETTLEMENT= 1 . 11 ' DEPTH = 0. 12' l Engineers S-Surveyors �s Planners* 1, 035014 •CZ 3-i 1-24- ♦sh1 4609 Dunndaa Drive Gsrc°°nnab-,NC 27407 TOP OF DAM ELEVATION = 750. 00 VELOCITY= 6. 51 FT/SEC Ph-e 336-854.8877 1-336-854.8876 .•���,N�INFIRM LICENSE#C,0168 S PROJECT: 763-30 DESIGN BY: OF DRAWN BY: OF ••'� �woo• H:\CM1 30 3019 P,,1,,fs\Paul ui1e \8,r d,Run\0r ings\PMasa 1\9erm Run Co f,,R Plans 3.0-W,f,,,h,d 4.0- SHEET DESCRIPTION: WET DETENTION EMERGENCY SPLLWAY CONTROL SECT ON EMERGENCY SPLLWAY EMT SECT ON POND #1DETAIL SCALE: N/A DATE: NOVEMBER 17, 2023 REVISIONS SHEET NO.: N TS N TS 3-11-24 C5.4