Loading...
HomeMy WebLinkAbout20231488 Ver 1_More Info Requested_20231204 (2)Baker, Caroline D From: Hoy, Arnie Sent: Thursday, January 18, 2024 11:22 AM To: Arlington Cornelius Subject: FW: DWR# 20231488 Cornelius 2520 Crossgate Trail Sherrills Ford Attachments: Catawba Notification Form.pdf, Plan View Bank Stabilization.pdf, Agent Authorization Form.pdf Good morning, Please see previous email with attachments and requested information. Best, Arnie Hoy Environmental Specialist II Division of Water Resources Office: 704-235-2200 1 Cell: 984-789-0173 DWR website: https://www.deg.nc.gov/about/divisions/water-resources D, E Q G_�U•I'111w I!le; 4i'I LM"fti ll'1lI'"II•'w51:Y UIY, Ily Email correspondence to and from this address is subject to the North Carohna Public Records Law and may be disclosed to third parties, From: Hoy, Arnie Sent: Thursday, December 14, 2023 11:02 AM To: acgrading@yahoo.com Subject: DWR# 20231488 Cornelius 2520 Crossgate Trail Sherrills Ford Good morning, In reviewing your shoreline stabilization application, I will need a few additional details. Are you using a contractor to complete the rip rap install to ensure that it is installed properly to prevent further erosion. If so, who is the contractor, name and email address. And complete the Agent Authorization form attached. 2. 1 will need a plan view and side view of your shoreline restoration plan, please see the attached form (Plan View Bank Stabilization) and complete the drawing and email back to amie.hov@deg.nc.gov. It must include the length of the shoreline and the depth of the rip rap above and below the normal pool levels. Please answer these questions in the correct numbers on the application and show in your sketch. I see that the work will be completed by land. You will need approval for an access corridor through the 50' buffer. DWR allows for a 10' access corridor through the 50' buffer which would equal 500sgft total. That is 10' wide in Zone 1 =30' x 10' wide in Zone 2 = 30' for the total of 300'x200'=500'sgft of temporary access in the buffer that must be replanted, and no trees disturbed, damaged, or removed. Please show this on the plan view and redo the first page of the attached Plan View Bank Stabilization with the corrected measurements. The buffer area will be placed in the above pond disturbance along with the measurements for the riprap above full pond level. 4. Please complete the Catawba Notification form Please let me know if you have any questions. Best, Amie Hoy Environmental Specialist II Division of Water Resources Office: 704-235-2200 1 Cell: 984-789-0173 DWR website: https://www.deg.nc.gov/about/divisions/water-resources DI.-y.rlinuir ur. Lnvironmental fluoAio Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties,