HomeMy WebLinkAboutWQ0013502_Monitoring - 06-2022_20240304Monitoring Report Submittal
Permit Number#*
Name of Facility:*
Month:* June
WQ0013502
Towers Apartments WWTF
Report Information
Type *
NDMR, NDAR-1, NDAR-2, NDMLR
Confirmation Email Address:
Name of Submitter: *
Signature:
Date of submittal:
Initial Review
Year:* 2022
Upload Document*
Towers ND_2206.pdf 393.09KB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
chad.leinbach@gmail.com
Chad Leinbach
Reviewer: Wanda.Gerald
3/4/2024
This will be filled in automatically
Is the project number correct?* WQ0013502
Is the monitoring report accepted?* Yes No
Regional Office* Raleigh
Reviewer: _anonymous
Review Date: 3/11/2024
FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page
Permit No.: WQ0013502
Facility Name: Tower Apartments WWTF
County: Chatham
Month: June
Year: 2022
PPI: 001
Flow Measuring Point: ® Influent Ef luent No flow generated
Parameter Monitoring Point: ® Influent ❑ Effluent ❑ Groundwater Lowering surface water
Parameter Code 0.
50050
@
2 m
V F-
0
O
c
O
d
U N
O
LL
24-hr
hrs
GPD
1
617
2
617
3
617
4
617
5
617
6
617
7
617
8
617
9
12:35
0.33
617
10
295
11
295
12
295
13
295
14
07:55
0.33
295
15
345
16
345
17
345
18
345
19
345
20
345
21
08:10
0.33
345
22
328
23
328
24
328
25
328
26
328
27
328
28
07:45
0.5
328
29
376
30
376
31
Average:
416
Daily Maximum:
617
Daily Minimum:
295
Sampling Type:
Estimate
Monthly Limit:
Daily Limit:
1,080
Sample Frequency:
Monthly
FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page of
Sampling Person(s) Certified Laboratories
Name: Chad Leinbach Name: Eurofins
Name: Conner Leinbach Name: Conner Consulting, LLC
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit?
® Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach
additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Chad Leinbach
Permittee: 3995 Jones Ferry, LLC
Certification No.: 23928
Signing Official: Chad Leinbach
Grade: SI Phone Number: 919-260-7301
Signing Official's Title: ORC
Has the ORC changed since the previous NDMR? ❑ Yes ® No
Phone Number: 919-260-7301 Permit Expiration: 7/31/25
7/28/2022
rl&d 7/28/2022
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to
the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page
Permit No.: WQ0013502
Facility Name: Tower Apartments WWTF
County: Chatham
Month: June
Year: 2022
Did irrigation
Field Name:
1
Field Name:
2
Field Name:
3
Field Name:
4
occur at
facility?
Area (acres):
0.02
Area (acres):
0.02
Area (acres):
0.02
Area (acres):
0.02
this
Cover Crop:
Cover Crop:
Cover Crop:
Cover Crop:
® YES No
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
150.6
Annual Rate (in):
150.6
Annual Rate (in):
150.6
Annual Rate (in):
150.6
Weather
Freeboard
Field Irrigated?
❑ YES ® No
Field Irrigated?
® YES ❑ No
Field Irrigated?
YES ® No
Field Irrigated?
YES ® No
t
j
E
0
o
.�.
•�
i
n
O
U
� d
QO
T.Q
O Q
N
E.2
O a
Q
dr
F
c
C
>+
�a
E rn
TE
E 7 v
N 2 C
J
m o
E N
0=
0 CL
% Q
d y
E
F
-
c
a
C
J
T
m
a
E
TE
E -O
N 2
J
d a
E N
7-
O a
i Q
a
N«
E
~
c
`a
NO
J
>`
m
a
E rn
TC
E 7 'o
W 2 0
2 J
U a
E L
-
O Q
%
a
d«
E
~
c
o
C
@
E
N= O
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
0
617
72.5882
1.14
0.94
0
2
0
617
72.5882
1.14
0.94
0
3
0
617
72.5882
1.14
0.94
0
4
0
617
72.5882
1.14
0.94
0
5
0
617
72.5882
1.14
0.94
0
6
0
617
72.5882
1.14
0.94
0
7
0
617
72.5882
1.14
0.94
0
8
0
617
72.5882
1.14
0.94
0
9
C
82
0.25
0
617
72.5882
1.14
0.94
0
10
0
295
34.7059
0.54
0.54
0
11
0
295
34.7059
0.54
0.54
0
12
0
295
34.7059
0.54
0.54
0
13
0
295
34.7059
0.54
0.54
0
14
CL
81
0.6
0
295
34.7059
0.54
0.54
0
15
0
345
40.5882
0.64
0.64
0
16
0
345
40.5882
0.64
0.64
0
17
0
345
40.5882
0.64
0.64
0
18
0
345
40.5882
0.64
0.64
0
19
0
345
40.5882
0.64
0.64
0
20
0
345
40.5882
0.64
0.64
0
21
CL
77
0.85
0
345
40.5882
0.64
0.64
0
22
0
328
38.5882
0.60
0.60
0
23
0
328
38.5882
0.60
0.60
0
24
0
328
38.5882
0.60
0.60
0
25
0
328
38.5882
0.60
0.60
0
26
0
328
38.5882
0.60
0.60
0
27
0
328
38.5882
0.60
0.60
0
28
CL
78
0.77
0
328
38.5882
0.60
0.60
0
29
0
376
44.2353
0.69
0.69
0
30
0
376
44.2353
0.69
0.69
0
31
0
0
0
Monthly Loading:
0
�/
0.00
%%%
12,491%/f,
23.00
0
0.00
%%;
0
0.00
12 Month Floating Total (in):
.'i%%
/
54.73
/ / / /
i i i i
i i ii.
61.53
i i i i
i i i
56.81
i i%%
48.82
FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of
Did the application rates exceed the limits in Attachment B of your permit?
®
Compliant
❑
Non -Compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
®
Compliant
❑
Non -Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit?
®
Compliant
❑
Non -Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site?
®
Compliant
❑
Non -Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
®
Compliant
❑
Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach
additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Chad Leinbach
Permittee:
3995 Jones Ferry, LLC
Certification No.: 23928
Signing Official: Chad Leinbach
Grade: SI Phone Number: 919 260-7301
Signing Official's Title: ORC
Has the ORC changed since the previous NDAR-1? ❑ Yes ® No
Phone Number: 919 260-7301 Permit Exp.: 7/31/25
rl&d 7/28/22
ZAZ Z alC 7/28/22
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to
the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617